Originally Posted by Jimbo604 View Post
So what's left?

- Main Street/Dollarton Highway Interchange and new signal alternate access (August)
- Getting the main through lanes back on the orange/green bridge
- East side of highway between Keith Road/Seymour Parkway Interchange and Mountain Highway Interchange

Anything else?
The Mt. Seymour Parkway/Keith Road underpass is still unfinished. I don't know what they're doing, but it's still a single lane in each direction.

The MUP on the north side of the Mt. Seymour Parkway exchange is still diverted by the highway diversion + unfinished up to Mountain Highway, and the MUP that will go underneath is still all dirt, I believe same with the "true" Mountain Highway offramp 22A.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.