HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jan 5, 2021, 1:50 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,409
Quote:
Originally Posted by J.OT13 View Post
Ah, thank you. I guess my dad was mistaken when he assumed it was at Bronson. I'll let him know.
I don’t think that much can go on at Bronson until the bridge replacement is done, as the Coke site is the staging area. After that’s done, the ramp re-alignment will happen as mentioned. It’s probably 5 years off. As the City is insisting on keeping the current left turn onto Chamberlain (can’t have cars backing up on Bronson, you see), there will be a weird triangular lot created between the current alignment and the new off ramp alignment. I’d be surprised if that would be considered for a large residential building, but stranger things have happened.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 2:51 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.