HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 6, 2020, 4:15 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,738
Quote:
Originally Posted by milomilo View Post
HFR doesn't need to be double tracked for the most part because it won't be sharing with freight trains.

Here's a quote from that study:



Exactly what I have been saying! Though, 3hr40 for the train is a bit faster than I expected. But that was back then, it will probably be slower now in the same way all the other VIA operations have got slower.
Well, then the goal is to get VIA up to the point they could sustain their maximum of 90mph for as much as possible. That 300km route would be done in 2 hours. The question would be what is needed to do that? The other question would be whether it would be worth it?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 3:37 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.