HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Apr 11, 2019, 12:22 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,702
Quote:
Originally Posted by roger1818 View Post
I have always agreed with you that dropping a full Stage 2 train of passengers off at Bayview is a bad idea. My argument is that over half of the train's passengers will be dropped off at Carleton, so it won't be full when it gets to Bayview. Once we get to the point where half of the passengers are continuing on passed Carleton (and thus running full again), larger trains are not going to be of much help.
There's also a large contingent of C-line passengers transferring to the T-line (especially if the federal government increases the employment node at Confederation Heights) so the flow is going to be relatively balanced.

My concern would be more on how badly Bayview is designed as a transfer station. The renderings show it as a completely unsheltered connection, and relies on using platform space for circulation — someone entering from the Trinity development wanting to access the C-line is going to have to walk the entire length of the T-line platform exposed to the elements. What's the use of a covered bridge if it just leads you out into the rain and snow to catch an east-west connection? This is just absolutely bad planning, these are brand new stations that should have been designed as a fully integrated and efficient transfer hub.

Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.