HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Nov 10, 2018, 10:55 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by fredinno View Post
I don't know, I don't even know how economical it would be to go at-grade in Green Timbers, or the ALR, considering the number of road/water crossings that would require it to go elevated anyways.


There's no long, crossing-less section of land on the entire pathway.
Maybe instead of going with regular elevated structure, perhaps they could use a lower structure, similar to what had done in Evergreen Extension?

https://goo.gl/maps/nX4nTCGWaTB2

It must've saved some cost compared to the elevated structure that was regularly used... otherwise they wouldn't do it this way, right?
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:32 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.