Quote:
Originally Posted by nname
Mayor's council meeting agenda
In summary, TransLink Staff recommend:
- Stop all work on SNG LRT
- Split the Langley Line into two phases, and construct the first part in phase 2 within the 1.61B (1.58B - 50M SNG sunk cost - 20M LRT pre-construction + 30M unspent Fraser LRT planning) funding envelope.
- Develop a new plan for SoF rapid transit as a whole, possibly upgrade the 96 B-Line.
And in other part of the agenda:
- The possibility of accelerating Phase 3 plan due to change in SoF rapid transit and the upcoming federal election
- Start the planning for the rail to UBC (not part of phase 3, but it's now a separate item)
|
I like everything that I see

Relevant to post is the three 'Options for Next Steps' being considered:
TL officially recommends Option 2, which gets planning processes going on both the Expo: Langley Extension and enhanced B-Line/BRT on KGB and 104th. Option 1 defers any SNG work, but the no-brainer choice between those two would be Option 2, which is basically exactly what SFS campaign has called for
The mayors looking to shunt the switch are probably going to want to focus on Option 3, but this option
"risks losing senior government funding" whereas the two other options that immediately proceed with SkyTrain actually
don't pose that risk.
The media narrative and the recent barrage of "experts" have been constantly suggesting the opposite, and I am glad to see this being shot down. As I have said all along, the $2.9b cost estimate for Expo: Langley SkyTrain fits within a total phase 2 + phase 3 funding envelope - now acknowledged to be $3.5b. So, there was never anything to worry about.