HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 22, 2017, 7:04 PM
Charles5 Charles5 is offline
Registered User
 
Join Date: Aug 2017
Posts: 238
Quote:
Originally Posted by roger1818 View Post
...they won't be unduly inconvenienced (assuming frequencies and travel times along the central line remain close to the same). Even those travelling between Bayview and Greensboro to the other won't be inconvenienced.
The MOOSE plan is to run trains once every hour along each leg (pg 6 of link below). Since two legs of the network will run up the O-train line, the best they could do is 30 minute service if they schedule them to offset one another. I would suggest that that would be an inconvenience compared to the current 12 minute frequency. That's assuming that the feeder rail lines such as VIA's from Smith Falls even have the capacity to add an extra train per hour in each direction.
https://www.letsgomoose.ca/wp-content/up..._CertificateOfFitness_2016-11-25bPDF.pdf

Joseph Potvin has made it quite clear that they can't and won't run the MOOSE trains on the same tracks as the O-Train. Therefore it's either one or the other and not both (unless they try to run a completely separate parallel track).
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:04 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.