Quote:
Originally Posted by Rockrain_BC
4-6 years of construction really does sound like a ridiculously long time for such a short distance. Wow.
|
I think people here have gotten spoiled by previous Skytrain expansion projects which were mostly either elevated or followed preexisting rights of way. Those could be built with minimal impact on traffic and subsurface infrastructure. Construction along the heavily-traveled and critical Broadway corridor is going to be far more technically challenging.