HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Sep 9, 2016, 12:58 AM
Scarface Scarface is offline
Registered User
 
Join Date: Jun 2015
Posts: 1,514
Quote:
Originally Posted by mylesmalley View Post
Build it for 1000 and have 720 show up and you get criticized.

It's tough to plan for, particularly when you have older neighborhoods that have schools well below capacity like EC downtown.
I do agree but I was looking at Schools like Queen Elizabeth School on Lynch Street, and Birchmount School on Ayer Avenue, they are built in a way that expansion could be done easily with prefab classroom segments. but then you look at Schools Like Mathieu-Martin/Carefour De L'acadie, and Bernice MacNaughton High School (Practically the same floor plan), and you can expand but it takes much more work even the new Moncton High School despite having the land available if they ever wanted to expand instead of adding a new High School for any reason the building itself seems to have been planed in case expansion was needed but the floor plan not so much creating more work, and in turn creating the need for those very crappy portables. portables should only be a temporary solution while a more permanent one is put into play. École Sainte-Bernadette for example they used portables attached to the old building while the new one was being built.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 3:10 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.