Quote:
Originally Posted by Tetsuo
They removed the tracks crossing Burrard on 4th (they just added it to the overall sewage project work being done on Burrard)
Didn't cover over them, they took them out and paved over. The tracks are now laying on top the existing tracks adjacent to the crossing, surprised no one is trying to jack them
|
You clearly have never tried to lift up solid steel. A 1 foot length weights at least 50lbs. Any real length of track needs a crane to take it away.