HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 30, 2015, 5:14 PM
SOSS SOSS is offline
 
Join Date: Jan 2014
Posts: 661
Quote:
Originally Posted by TransitJack View Post
That's an odd one... That's a lot of concrete for "Just in Case" and would only partially support the overpass. Perhaps its actually to accommodate a future upgrade to this overpass? Centre support is already in place.
The future Clarke-Murray overpass is designed into the plan further west of the Moody Street overpass (see below). The Moody overpass also just went through an upgrade for pedestrian/cyclist access so I doubt this support would be for something that is decades away (we as a society have a challenging time thinking that far ahead).

Quote:
Originally Posted by jsbertram View Post
From the official Evergreen Design and Construction documents, Schedule 4, Appendix A, page 152:

The Murray-Clarke Connector
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:33 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.