Quote:
Originally Posted by TransitJack View Post
That's an odd one... That's a lot of concrete for "Just in Case" and would only partially support the overpass. Perhaps its actually to accommodate a future upgrade to this overpass? Centre support is already in place.
The future Clarke-Murray overpass is designed into the plan further west of the Moody Street overpass (see below). The Moody overpass also just went through an upgrade for pedestrian/cyclist access so I doubt this support would be for something that is decades away (we as a society have a challenging time thinking that far ahead).

Quote:
Originally Posted by jsbertram View Post
From the official Evergreen Design and Construction documents, Schedule 4, Appendix A, page 152:

The Murray-Clarke Connector
     
     
  #8262  
Old Posted Apr 30, 2015, 6:19 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,726
Great photo update, Nname. Thank you!
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #8263  
Old Posted Apr 30, 2015, 7:02 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Awesome photos nname! Much appreciated the updates.

Quote:
Originally Posted by nname View Post

I don't think you can get this close to the track elsewhere in the system?

How come there is so many rails in this pic? Are those just extra ones that they temporarily set aside?
     
     
  #8264  
Old Posted Apr 30, 2015, 7:35 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,738
Quote:
Originally Posted by nname View Post
Took a walk last Sunday along the eastern portion of Evergreen Line:

East end of VSF. This was only a pile of dirt two months ago.



And now it's a brand new graffiti wall?
I hope they clean it up.
     
     
  #8265  
Old Posted May 1, 2015, 1:55 PM
vancitydweller's Avatar
vancitydweller vancitydweller is offline
Registered User
 
Join Date: Jul 2012
Location: Vancouver
Posts: 31
Does anyone know if the tunnel boring machine has started digging again? Last I heard, it was undergoing maintenance yet again.
     
     
  #8266  
Old Posted May 1, 2015, 9:24 PM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Quote:
Originally Posted by TransitJack View Post
That's an odd one... That's a lot of concrete for "Just in Case" and would only partially support the overpass. Perhaps its actually to accommodate a future upgrade to this overpass? Centre support is already in place.
I had always supposed this was a "just in case" beam that would protect the EGL tracks from being completely blocked or damaged by collapse of the overpass. It's an interesting possibility that it is pre-built for possible replacemt of the roadway, however that would have to be many, many years away since the Moody Overpass just had seismic upgrades and below- ground strengthening of its columns last year when the wider sidewalk was added.

In either case, it's truly unfortunate that the 2 EGL tracks were not accommodated by the single gap to the north of this new "beefy" beam. That would have allowed bicycle access along the south side of the tracks, right to Moody Centre Station. The way the tracks are now, any bike route along Clarke Street (which IS the Tfans-Canada Trail) is going to be a gong show of conflict with car traffic.
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #8267  
Old Posted May 1, 2015, 10:00 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Olden Retreiver View Post
I had always supposed this was a "just in case" beam that would protect the EGL tracks from being completely blocked or damaged by collapse of the overpass. It's an interesting possibility that it is pre-built for possible replacemt of the roadway, however that would have to be many, many years away since the Moody Overpass just had seismic upgrades and below- ground strengthening of its columns last year when the wider sidewalk was added.
Based on what it looks like I'm going to go with someone in the planning department (of who? Translink or the city?) specifically told EGL construction to build it because there are plans on the book somewhere to expand the width of it, and obviously they can't do that if they have to rip up the EGL tracks, or build a more expensive bridge.

Another possibility is that there might be a track protection/suicide-net that covers the tracks like at Broadway and Commercial's Grandview cut area that all the trash collects on.
     
     
  #8268  
Old Posted May 2, 2015, 2:23 AM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Quote:
Originally Posted by Olden Retreiver View Post
I had always supposed this was a "just in case" beam that would protect the EGL tracks from being completely blocked or damaged by collapse of the overpass. It's an interesting possibility that it is pre-built for possible replacemt of the roadway, however that would have to be many, many years away since the Moody Overpass just had seismic upgrades and below- ground strengthening of its columns last year when the wider sidewalk was added.

In either case, it's truly unfortunate that the 2 EGL tracks were not accommodated by the single gap to the north of this new "beefy" beam. That would have allowed bicycle access along the south side of the tracks, right to Moody Centre Station. The way the tracks are now, any bike route along Clarke Street (which IS the Tfans-Canada Trail) is going to be a gong show of conflict with car traffic.
Having a bike path under the overpass would have been great. Too bad.
     
     
  #8269  
Old Posted May 2, 2015, 12:56 PM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Quote:
Originally Posted by Kisai View Post
Based on what it looks like I'm going to go with someone in the planning department (of who? Translink or the city?) specifically told EGL construction to build it because there are plans on the book somewhere to expand the width of it, and obviously they can't do that if they have to rip up the EGL tracks, or build a more expensive bridge.

Another possibility is that there might be a track protection/suicide-net that covers the tracks like at Broadway and Commercial's Grandview cut area that all the trash collects on.
I'm not inside Port Moody City Hall, but I certainly watch and listen there. Can be pretty certain this didn't come from the City. A general problem all through design and construction has been lack of communication and coordination between TransLink, Province, City and EGRT, with fault on all sided I would say. If there were proper coordination, we might have the very desirable bike lane.

The vandalism (and suicide, I suppose) prevention device is a tall fence added last year, and extending above the CPR tracks, which were previously completely "unprotected."

There are rumblings in PoMo that, when another overpass is built farther west, to serve redevelopment of the sawmill site (NOT the Murray-Clarke Connector) that the current overpass might carry one-way car traffic only, so there would be little or no reason to make it wider.

BTW, Mill and Timber had initiated public consultaion on the waterfront redevelopment:
http://www.flavelleoceanfront.ca
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #8270  
Old Posted May 4, 2015, 7:22 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 769
I didn't get a great look, but I believe I saw the posts for the ATC cables on the inbound guideway curve around Lougheed this morning.
     
     
  #8271  
Old Posted May 6, 2015, 6:34 AM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Any updates on when Alice will get fired up again? She's been under maintenance for a fair bit of time now. Or are they waiting for the pre-drilling work to be done uphill from current location.
     
     
  #8272  
Old Posted May 8, 2015, 12:58 AM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
Quote:
Originally Posted by SOSS View Post
Any updates on when Alice will get fired up again? She's been under maintenance for a fair bit of time now. Or are they waiting for the pre-drilling work to be done uphill from current location.
Tunnel boring will resume around Canada Day, plus or minus a week. No joke.
     
     
  #8273  
Old Posted May 8, 2015, 6:50 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by finalcoolman View Post
Tunnel boring will resume around Canada Day, plus or minus a week. No joke.
Where exactly is Alice anyway?
     
     
  #8274  
Old Posted May 8, 2015, 7:28 PM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,228
July? Just build it manually at this point.
     
     
  #8275  
Old Posted May 8, 2015, 8:04 PM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
Quote:
Originally Posted by queetz@home View Post
Where exactly is Alice anyway?
The same place it has always been, under Seaview & Clarke
     
     
  #8276  
Old Posted May 8, 2015, 8:22 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by finalcoolman View Post
The same place it has always been, under Seaview & Clarke
So the TBM did not move at all??? Wow! I tend to agree with logicbomb....just do it manually!

I guess this goes to show how cut and cover is simply better if you can do it that way. Too bad for Evergreen given the topography, they have no choice but to bore using a TBM.
     
     
  #8277  
Old Posted May 8, 2015, 10:34 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by logicbomb View Post
July? Just build it manually at this point.
What do you think this is, the 1880's?

A lot of stuff we do today is to reduce the risk of people being killed. If that adds time, so be it.
     
     
  #8278  
Old Posted May 9, 2015, 1:42 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Quote:
Originally Posted by finalcoolman View Post
Tunnel boring will resume around Canada Day, plus or minus a week. No joke.
*WOW* The financial penalties for these delays should be truly punitive by now. Hard to imagine Evergreen can open for full service by "Fall 2016" if the bare basic tunnel is finished less than a year before then.

The tunnel was originally supposed to be complete more than a month ago, giving lead time of 16 months to the original opening day in "Summer 2016."
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #8279  
Old Posted May 9, 2015, 1:50 AM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
Quote:
Originally Posted by Olden Retreiver View Post
*WOW* The financial penalties for these delays should be truly punitive by now. Hard to imagine Evergreen can open for full service by "Fall 2016" if the bare basic tunnel is finished less than a year before then.

The tunnel was originally supposed to be complete more than a month ago, giving lead time of 16 months to the original opening day in "Summer 2016."
Wrong. The tunnel was originally supposed to be complete December 2014.
     
     
  #8280  
Old Posted May 9, 2015, 2:58 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Quote:
Originally Posted by finalcoolman View Post
Wrong. The tunnel was originally supposed to be complete December 2014.
TBM Alice was launched at the Port Moody portal in March 2014, and the tunnel was supposed to take about a year to complete.

http://tranbc.ca/2014/03/26/the-evergree...ke-it-a-boring-job/#sthash.l6cwW7Xk.dpbs
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:52 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.