HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 30, 2014, 6:37 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
I think we're all on the same page here--those Kanata & Barrhaven lines are something that should be looked at, but not in the way that Maguire wants (peak period trains only, almost zero stations, as a replacement for Phase 2 LRT).

My concept for Phase 3 has always been to bring LRT past Baseline & Bayshore to meet up with the Beachburg sub in both spots (ie. one junction at Woodroffe and another at QCH) to create an interchange with a DMU line going from Kanata North to Greenboro, then interlined with the existing O-Train (aka the Trillium Line) up to Bayview. Double-track Trillium north of Greenboro at the time too, that will be needed at some point anyway especially as Carling station intensifiation continues. There can be then be 4 minute combined service Greenboro-Bayview (assuming 8 minute service for the Beachburg line)

But without that LRT connection to it, the value of the Beachburg sub is quite limited.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:47 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.