HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Oct 1, 2014, 12:28 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Here's my rough concept for Phase 3 using the Beachburg & Smiths Falls subdivisions:



Two new lines follow rail corridors almost exactly, except I had the line from Kanata/Nepean deviate to Hurdman instead of terminating in Tremblay. Avoids using up VIA's platforms. I also combined Confederation & Heron stations--how exactly, not sure, but I would like to see that. The SE Transitway would remain; it and the Kanata line would parallel.

Between Confederation Heights & Bayview the line would be double tracked. Both it and the Barrhaven line would have 8 minute frequency allowing for combined 4 minute frequency at Carleton, Carling, and Gladstone.

Yes, I removed the Trillium Line to Riverside South and put to the Airport instead. I honestly think Riverside South is better served by a transitway extension down the old N-S LRT corridor instead, it allows for direct service instead of an awkward transfer at Bowesville. And yes, I did plan for the Baseline spur to short turn at Tremblay. Orleans doesn't need 90 second service.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:50 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.