Posted Jul 15, 2014, 7:48 PM
|
 |
ColoRADo
|
|
Join Date: May 2004
Location: Denver
Posts: 2,317
|
|
Quote:
Originally Posted by bunt_q
I can finish the study for them right here, right now. The "most feasible rail transit route ... to provide a direct rail connection with no transfers between downtown Denver and the future 38th + Blake Station" is the airport train. I mean, we're meant to believe that Union Station is right in the thick of it all. And that's actually pretty true for the airport train. So there's really no better way to connect those two.
Now, if the study was aiming to link Central Denver, more broadly, to the 38th + Blake Station, fine. But if what's above is truly the stated objective, then they should give me a $1 million consulting fee and call it good.
|
Wait till you hear how they're going to run LRT on Downing.
|