Posted May 31, 2013, 9:26 PM
|
|
Registered User
|
|
Join Date: Aug 2005
Posts: 5,106
|
|
Quote:
|
During the construction of the new upper entrance of the west station house at the Lougheed Town Centre Station, the Primary Contractor shall be responsible for relocating the Smart Card and Faregates Work installed by the SCFW Concurrent Work Contractor, with the exception that the removal and reinstallation of the FCVMs, AFMs and faregate equipment shall be undertaken by the SCFW Concurrent Work Contractor. The Primary Contractor shall be responsible for the removal of any other equipment associated with the Smart Card and Faregate Work installed by the SCFW Concurrent Work Contractor and for the supply and installation of all conduit, cabling and other equipment (if the existing other equipment cannot be reused) to receive the relocated FCVMs, AFMs and faregate equipment in its permanent location, in accordance with the requirements set out in Article 14 [Smart Card and Faregates] of Part 2. The Primary Contractor, shall in accordance with Article 14 [Smart Card and Faregates] of Part 2, be responsible for coordinating the removal and reinstallation of the FCVMs, AFMs and faregate equipment to the new upper entrance of the west station house with TransLink and the SCFW Concurrent Work Contractor. The Primary Contractor will not be responsible for the cost of one removal and one reinstallation of the FCVMs, AFMs and faregate equipment to this new upper entrance undertaken by SCFW Concurrent Work Contractor. Any additional removal and reinstallation of the FCVMs, AFMs and faregate equipment required by the Primary Contractor to this new upper entrance will be at the cost of the Primary Contractor.
|
This is from the contract article 18.
|