HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Oct 26, 2009, 3:10 AM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by mersar View Post
Hmm, here's an interesting update to the 45th Street station from councils decision. They've shifted the platform west of 45th now so its beside the AMA building, so the west end will be almost at grade (maybe 1m below I'd guess), and the east end will be down in the trench. See the new renders here and here. So it won't be fully in a trench, but the platform will be on an incline. Theres also going to be a bridge at 42nd street as well as at 45th street over the tracks
You catch an interesting point here. 45th Street actually sits on a bit of a rise. If the tracks were to come to grade before reaching 45th, as the original plans called for, the trains would end up having to first come up more steeply and then travel down a slope as they headed west, immediately prior to starting to climb again to get over Sarcee Tr. I would not be suprised if the design/ build teams were pushing for the trenching change as it helps simplify the engineering of the grade (which trains are very sensitive to).
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.