  #361  
Old Posted Oct 26, 2009, 3:10 AM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by mersar View Post
Hmm, here's an interesting update to the 45th Street station from councils decision. They've shifted the platform west of 45th now so its beside the AMA building, so the west end will be almost at grade (maybe 1m below I'd guess), and the east end will be down in the trench. See the new renders here and here. So it won't be fully in a trench, but the platform will be on an incline. Theres also going to be a bridge at 42nd street as well as at 45th street over the tracks
You catch an interesting point here. 45th Street actually sits on a bit of a rise. If the tracks were to come to grade before reaching 45th, as the original plans called for, the trains would end up having to first come up more steeply and then travel down a slope as they headed west, immediately prior to starting to climb again to get over Sarcee Tr. I would not be suprised if the design/ build teams were pushing for the trenching change as it helps simplify the engineering of the grade (which trains are very sensitive to).
Reply With Quote
     
     
  #362  
Old Posted Oct 26, 2009, 4:42 AM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
I've taken a look at proposed bus feeder routes into the WLRT stations. I like what I see for the most part. But what happens to the all the buses that they have allocated now for all of the West bus routes ( i.e. 101, 104, 301, 2 etc.) when many will not require the same number as their routes are dramatically shortened to head just to the closest stations rather than all the way downtown.

I can imagine that the new shorter routes that feed into the stations will have higher frequency than current downtown-bound routes, but there probably would be a bunch of extra buses no longer needed in the West side. Anyone have some ideas on what those extra buses will go towards?

Comments appreciated
Reply With Quote
     
     
  #363  
Old Posted Oct 26, 2009, 5:00 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:27 AM.
Reply With Quote
     
     
  #364  
Old Posted Oct 26, 2009, 7:26 AM
YYCguys YYCguys is offline
Registered User
 
Join Date: Sep 2006
Posts: 2,624
Quote:
Originally Posted by frinkprof View Post
^... As for any "surplus" buses, probably a combination of retirement of old units and/or using them for growth, (i.e. feeder service to Walden Bayhillridgemountspringstowne).
Reply With Quote
     
     
  #365  
Old Posted Oct 26, 2009, 5:51 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
New Status Newsletter.

Westlrt.ca is being changed a little bit to reflect a project that is under construction, rather than a project that is just proposed. There's some internal links on the pages that don't work yet.
Reply With Quote
     
     
  #366  
Old Posted Oct 29, 2009, 6:14 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Just in from CTV....The successful Design/Build team for the West LRT to be announced this afternoon.
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #367  
Old Posted Oct 29, 2009, 7:58 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Reply With Quote
     
     
  #368  
Old Posted Oct 29, 2009, 10:27 PM
Bigtime's Avatar
Bigtime Bigtime is offline
Very tall. Such Scrape.
 
Join Date: Jun 2005
Posts: 17,727
SNC Lavalin has been selected for the job.

Opening date is 5am on December 10th, 2012.

http://www.calgaryherald.com/Mayor+awards+west+contract+announces+opening/2160201/story.html
Reply With Quote
     
     
  #369  
Old Posted Oct 29, 2009, 10:30 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Source please Bigtime.
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #370  
Old Posted Oct 29, 2009, 10:32 PM
Bigtime's Avatar
Bigtime Bigtime is offline
Very tall. Such Scrape.
 
Join Date: Jun 2005
Posts: 17,727
It's on the Herald website and QR77 website now.
Reply With Quote
     
     
  #371  
Old Posted Oct 29, 2009, 10:36 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Thanks Bigtime...just wanted the info confirmed. Very interesting. Certainly isn't what I expected, eh frinky?
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #372  
Old Posted Oct 29, 2009, 11:11 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:28 AM.
Reply With Quote
     
     
  #373  
Old Posted Oct 29, 2009, 11:21 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
December 10, 2012...mark the date folks. We can enjoy the service for 11 days before the end of the world on the 21st.
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
  #374  
Old Posted Oct 29, 2009, 11:40 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Very good to hear. I'd heard from two people (one here, one not) that PCL was the likely winner, glad to see its actually SNC
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #375  
Old Posted Oct 30, 2009, 12:17 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:29 AM.
Reply With Quote
     
     
  #376  
Old Posted Oct 30, 2009, 12:42 AM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Seems like a good choice. They did a good job on the Canada lin in Vancouver. On time, on budget.

Bring on SE LRT and NCLRT!
Reply With Quote
     
     
  #377  
Old Posted Oct 30, 2009, 1:03 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:29 AM.
Reply With Quote
     
     
  #378  
Old Posted Oct 30, 2009, 1:41 AM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
I think some of the underground tracks will have to go ahead near the beginning - Westbrook station, the underpass under Bow Trail, 17th Ave etc. Some of those things will require a year of construction jsut to build the underpass, so they'll have to get it all done ASAP so the trackwork can start.
Reply With Quote
     
     
  #379  
Old Posted Oct 30, 2009, 1:50 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Bow Trail realignment will be one of the first things to get underway without a doubt in my mind. The modifications to the Crowchild bridges while not really huge of a project are required before anything else starts around there, and the new lanes pretty much have to be done at 33rd before they can start on the tunnel (which we don't know how it will be constructed, but I'll guess cut and cover)
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #380  
Old Posted Oct 30, 2009, 2:19 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Project Signage:



(My Cameraphone pic)
__________________
Stevinder.
* * * * * *
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.