Quote:
Originally Posted by J.OT13
For the love of God no. That would be absolutely terrible for HSR ridership. Bad enough for the airport, but HSR shouldn't require another three trains to get Downtown.
Having HSR at Pearson and Trudeau would make sense (but ain't happening) because they are major hubs where people from the entire Quebec-City Windsor Corridor drive or fly to take a long-haul flight. Far less so with Ottawa.
Imbleau did say that Jean-Lesage Airport in Quebec City is basically off the table, so I highly doubt Macdonald-Cartier would be on the table.
|
I am guessing the objective would not be the airport as a transportation hub, but the airport as a mechanism to cut the length of the overall route.
The three train problem is a relatively solvable one, certainly in comparison to the cost of getting HSR downtown.