Quote:
Originally Posted by jollyburger
1050 Expo seems to be waiting for the utility work for the COV pumphouse to be completed. They started the utility work in December and installed the large above ground bypass pipe in mid-February.
Also I don't think the perimeter piling is complete? From the timelapses they only did a partial section near the pumphouse
|
The piling rig has returned to 1050 Expo.