Quote:
Originally Posted by jollyburger View Post
Not sure if they will finish piling before they start the excavation.

EDIT: Some details on the secant wall for the site

https://www.instagram.com/reel/DMypze-S6iw/
Your right, I still see some of those metal panel stored to the side, etheir way, happy we wont have to wait months before excavation.
Reply With Quote
     
     
  #702  
Old Posted Nov 15, 2025, 1:41 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
1050 Expo Blvd

Ok, after many hours and days on the white board, I believe i have figured it out.

Started removal on Remembrance day, paying all involed in that work double time.
The incredible fast turnaround time for the dump trucks.
= Equals = the 2025 FIM World Supercross Championship at BC Place tomorrow night Saturday Nov 15 at BC Place.

"The dirt for the BC Place motocross event, part of the FIM World Supercross Championship, is sourced from local construction sites within a short radius of the stadium. Event organizers do not specify the exact source to maintain security and manage logistics."

Now, does this mean there is still a preload to continue at the site or was that dirt just stockpiled there just for that event
Reply With Quote
     
     
  #703  
Old Posted Nov 15, 2025, 2:09 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Quote:
Originally Posted by Zepfancouver View Post
Ok, after many hours and days on the white board, I believe i have figured it out.

Started removal on Remembrance day, paying all involed in that work double time.
The incredible fast turnaround time for the dump trucks.
= Equals = the 2025 FIM World Supercross Championship at BC Place tomorrow night Saturday Nov 15 at BC Place.

"The dirt for the BC Place motocross event, part of the FIM World Supercross Championship, is sourced from local construction sites within a short radius of the stadium. Event organizers do not specify the exact source to maintain security and manage logistics."

Now, does this mean there is still a preload to continue at the site or was that dirt just stockpiled there just for that event
I think they just used it for the base layer from this timelapse

https://www.instagram.com/p/DRBMruBiU6q/?hl=en

But they needed 650 trucks so not sure if that matches up with the amount of soil they had stockpiled there. Last year it was 6000 tonnes of dirt.

Quote:
He says: “The dirt is a mix of glacial till and clay. So we have brown clay in here this year, different than last year.

“There is still quite a bit of rock in with the dirt, which we have to sift out, and one of the challenges is that you don’t know how it is going to pack.

“We will have about 650 trucks bring in the dirt,” he says, with a truck arriving every 67 seconds on the first day of the build.”
https://worldsupercrosschampionship.com/diggin-the-dirt-the-track-builder/

There was zero work on the site since they removed the dirt so maybe they'll use the site as a staging site for removal of the dirt. I doubt they will use any preload.
Reply With Quote
     
     
  #704  
Old Posted Nov 15, 2025, 4:08 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
Vancouver Construction Weekly Timelapse 🏗️ | Nov 8, 2025 – Nov 14, 2025 | Yaletown Build

Video Link
Reply With Quote
     
     
  #705  
Old Posted Nov 15, 2025, 7:23 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Maybe 200 or so loads from this site just by scanning the timelapse.

The two excavators are still on the site so probably means they'll return the dirt here.

Last edited by jollyburger; Nov 15, 2025 at 10:03 PM.
Reply With Quote
     
     
  #706  
Old Posted Nov 15, 2025, 10:35 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
Quote:
Originally Posted by jollyburger View Post
Maybe 200 or so loads from this site just by scanning the timelapse.

The two excavators are still on the site so probably means they'll return the dirt here.
If there is a quick turn around for BC Place on events, they would get it done quickly by returning the dirt back here, then hopefully clear this site of it and get back to regular construction.
Reply With Quote
     
     
  #707  
Old Posted Nov 16, 2025, 5:39 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Nothing seems to be happening on the site today so I guess we'll see what happens tomorrow.
Reply With Quote
     
     
  #708  
Old Posted Nov 17, 2025, 3:04 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
crane is up for the other social housing project up Pacific just before Richard.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #709  
Old Posted Nov 17, 2025, 3:43 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Quote:
Originally Posted by hollywoodnorth View Post
crane is up for the other social housing project up Pacific just before Richard.
450 Pacific? Looks tiny but still won't complete until Fall 2027

https://enfhs.ca/building/pacific-street-project/
Reply With Quote
     
     
  #710  
Old Posted Nov 19, 2025, 12:24 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Another day and nothing happening on the site except for some random movements of one excavator.
Reply With Quote
     
     
  #711  
Old Posted Nov 19, 2025, 4:06 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
1050 Expo Blvd

Quote:
Originally Posted by jollyburger View Post
Another day and nothing happening on the site except for some random movements of one excavator.
It is very curious.
Reply With Quote
     
     
  #712  
Old Posted Nov 19, 2025, 4:12 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
450 Pacific Street Project

Quote:
Originally Posted by hollywoodnorth View Post
crane is up for the other social housing project up Pacific just before Richard.
Quote:
Originally Posted by jollyburger View Post
450 Pacific? Looks tiny but still won't complete until Fall 2027

https://enfhs.ca/building/pacific-street-project/
This is my new favorite Downtown project Entre Nous Femmes Housing Society - 450 Pacific Street Project


https://makeagif.com/i/aziwNj
Reply With Quote
     
     
  #713  
Old Posted Nov 19, 2025, 5:34 AM
seamusmcduff seamusmcduff is offline
Registered User
 
Join Date: Dec 2015
Location: Vancouver
Posts: 660
It's surprising to me that they didn't try and put more density on that site, considering the context with so many towers already surrounding it.
Reply With Quote
     
     
  #714  
Old Posted Nov 19, 2025, 5:56 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,299
Quote:
Originally Posted by seamusmcduff View Post
It's surprising to me that they didn't try and put more density on that site, considering the context with so many towers already surrounding it.
That's why they didn't consider another tower. The planning for the former Expo lands envisaged that site for non-market housing in a lower building. The two towers on either side are only about 60 metres apart. Given minimum tower to tower spacing of 25m, the site could theoretically only accomodate an expensive 10 metre wide tower. The other two sites being developed with non-market housing as part of the recent deal with Concord are larger, and both will have a tower.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #715  
Old Posted Nov 19, 2025, 6:47 AM
seamusmcduff seamusmcduff is offline
Registered User
 
Join Date: Dec 2015
Location: Vancouver
Posts: 660
Right, thanks. I forgot about tower spacing guidelines, didn't realize the site was so constrained
Reply With Quote
     
     
  #716  
Old Posted Nov 19, 2025, 6:19 PM
gaviscon gaviscon is offline
Registered User
 
Join Date: Nov 2021
Posts: 771
Donno if this is one of the 14 sites, but the website says it broke ground in late 2024?

Anyone know if there's progress?

Renfrew St at E 14th Ave

Reply With Quote
     
     
  #717  
Old Posted Nov 19, 2025, 10:39 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Reply With Quote
     
     
  #718  
Old Posted Nov 20, 2025, 9:26 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
site prep started at the Beatty/Nelson Social Housing/Fire Hall project ..... they seem to have cleared the lot and there is a small piece of machinery on site now.

990 Beatty St
Development permit issued
July 16 2025


https://www.shapeyourcity.ca/990-beatty-st?tool=qanda
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #719  
Old Posted Nov 27, 2025, 9:15 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
One of the excavators drove off the site two days ago. It might have gone over to the Beatty site.

Still no work being done.
Reply With Quote
     
     
  #720  
Old Posted Nov 27, 2025, 11:42 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,299
Quote:
Originally Posted by jollyburger View Post
One of the excavators drove off the site two days ago. It might have gone over to the Beatty site.

Still no work being done.
Are there any signs identifying a contractor or excavation subcontractor? If not it might be environmental clean up before the main excavation company takes over.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 6:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.