HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 13, 2023, 7:16 PM
C3YVR C3YVR is offline
 
Join Date: Jan 2020
Posts: 257
I was just looking at the Georgia thread and I realized the renovated Hotel Georgia just had its 12th anniversary since reopening. The hotel renovation was to take two years but because of the 2008 financial crisis it took 3 1/2 years, which is about the same time the Four Seasons has now been closed. While looking at the thread I noticed LeftCoaster made this comment in June 2010 about the CF rotunda replacement:

Quote:
Originally Posted by LeftCoaster View Post
Well its not an if at all, in fact in a way the project is already well underway. The lobby re-positioning occurring at 701 west georgia (The IBM Building) is the first phase of the project as the lobby needed to be moved to make way for the new addition. CF is currently in the process of landing an anchor tenant and when the work is completed on 701 work will likely start immediately.
With CF it is interesting to see how they view time, as actual removal of the rotunda did not occur for almost another decade (it took them that long to sign a tenant and get approval) and then took 2 1/2 years to construct a two story building. In January 2020 when CF put out the press release for a renovated hotel they advised they also would have more info soon. So going by that time frame CF should have the new hotel ready by when? Nordstrom replacement?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 12:54 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.