HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted May 14, 2025, 2:39 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is offline
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 6,410
Winnipeg Construction XI

Winnipeg Developments

Post 1 of 3
Previous thread: Winnipeg Construction X

Portage Place Revitalization
Location: 393 Portage Ave
Developer: True North Real Estate Development (TNRED)
Architect: Architecture49
Status: U/C
Documents: Community Engagement Summary Report | Phase 2 - Community Engagement Summary Report | Overall Campus plan | Campus Redevelopment Plan - September 2024 | Development Updates
Project Thread: Portage Place Redevelopment
Media:Description: True North Real Estate Development (TNRED) has proposed a $650 million redevelopment initiative for Portage Place, aimed at revitalizing downtown Winnipeg and creating a healthier, more vibrant urban environment accessible to all residents. The central concept involves reconfiguring the existing enclosed mall structure into four primary components:
  • Health equity
  • Public spaces and greenways
  • Neighbourhood services, Culture and art
  • Housing and food equity
A key part of the project is a large Healthcare Centre of Excellence at the east end. This facility will cover about 300,000 square feet over 12 storeys. It will offer primary care, mental health support, surgery, diagnostic services, and kidney dialysis. It will also house an expanded Pan Am Clinic. The plan focuses on reusing much of the existing building in a smart and sustainable way. The old inward-focused mall will change into an open, welcoming space that faces outward. It will better connect with the surrounding community and help downtown neighbourhoods thrive again.
Permits



Video Link

  • Portage Place Phase 1 - Healthcare Centre of Excellence:
Location: 375 Portage Avenue
Status: U/C
Description: The 265,000-square-foot Healthcare Centre of Excellence will serve as the anchor for the Portage Place redevelopment in downtown Winnipeg. It will provide primary care with integrated mental health services, surgery, diagnostics, and renal dialysis, while also housing expanded programs from the Pan Am Clinic. The centre is a partnership between Shared Health and the Winnipeg Regional Health Authority, supported by a 35-year lease commitment from the Government of Manitoba.
Permits: 2026-02-25, Permit. Housing Accelerator Fund - The Healthcare Centre of Excellence (HCCE) - Development permit for the first phase of the Portage Place Redevelopment. Site redevelopment to include a renovation/addition to the East pad of the site (Edmonton Street to Carlton Street) that introduces a new tower above the existing podium levels, based on the originally designed core for a future tower. This phase of the project will remove the Edmonton Street Atrium and re-establish a publicly accessible multi-modal (car/cycling/pedestrian) connection between the neighborhoods North and South of Portage Avenue.


  • Portage Place Phase 2 - Project 92:
Architect: Number Ten Architectural Group
Status: In development
Media:Description: Project 92 is a 21-storey residential tower that forms part of the Portage Place redevelopment. It is being developed through a historic not-for-profit partnership between True North Real Estate Development and the Southern Chiefs’ Organization (SCO), under the name TN-SCO 92 Housing Inc. The project is inspired by Call to Action #92 from the Truth and Reconciliation Commission of Canada. The tower will provide 207 housing units, with up to 40 percent offered at affordable rents (below 80 percent of the area’s median market rates). Any profits will be reinvested into additional housing and public spaces within and around the development. The building will be constructed above the existing podium at the west end of Portage Place. Residents will enjoy easy access to new downtown amenities through street-level connections and the second-floor skywalk. This project is a recipient of the Housing Accelerator Fund Capital Grant Incentive


Video Link


Hudson Bay Building | Wehwehneh Bahgahkinahgohn
Location: 450 Portage Ave
Architect: Number TEN Architectural Group
Developer: The Southern Chiefs Organization
Status: U/C
Documents: Project Thread: Hudson Bay Building Redevelopment
Media:Renderings
Description: The Southern Chiefs’ Organization (SCO) is leading a major transformation of the historic six-storey, 655,000-square-foot Hudson's Bay Company building in downtown Winnipeg. This project turns the old retail space into a vibrant multi-use development, helping to revive the downtown core while advancing economic and social reconciliation.The $310 million initiative includes more than 373 affordable housing units. Every unit will offer views either through the building's preserved historic facade or into a stunning new atrium—roughly the size of an NHL hockey rink—featuring unique designs inspired by all 34 SCO First Nation communities. The building will also include office and retail spaces dedicated to First Nations entrepreneurs. This project is a recipient of the Housing Accelerator Fund Capital Grant Incentive

Permits: #24-255803 RP-2024-11-15, Landlord work - Interior and exterior alterations in an existing multi-storey, multi-tenant building will include the demolition of escalators, elevator controls, and the central penthouse, as well as partial roofing demolition, temporary hoarding, and waterproofing. Structural work being done.


Video Link


Red River Métis National Heritage Centre
Location: 335 Main Street
Developer:The Manitoba Métis Federation | Métis N4 Construction Inc.
Architect: Number TEN Architectural Group
Status: U/C
Renderings
Media:Description: The Manitoba Métis Federation (MMF), the National Government of the Red River Métis, is developing the Red River Métis National Heritage Centre in the heart of the Red River Métis Homeland at Winnipeg's iconic Portage and Main intersection. This transformative project involves the adaptive reuse of the historic former Bank of Montreal building (constructed in 1913).Symbolically oriented toward the northwest—facing the traditional Métis Homeland—the centre occupies the southeast corner, a site of profound historical importance as the primary crossroads of the Red River Cart trails that connected Métis communities across the Prairies.This unique, one-of-a-kind facility will preserve and share Red River Métis narratives through immersive exhibits and programs that thoughtfully integrate historical artifacts—such as those from the recently acquired "Our Grandmothers" Collection, featuring beadwork, quillwork, textiles, and items dating to the 1830s—with contemporary art and interactive experiences.The centre will honor the Red River Métis' pivotal role in Canada's Confederation, the founding of Manitoba, and the nation's ongoing development, while serving as an accessible, inclusive gathering space to celebrate collective identity, culture, governance, and language revitalization efforts (including Michif).Supported by significant investments, including over $23 million from the Government of Canada and $10 million from the Province of Manitoba, construction and renovations are progressing, with the centre scheduled to open in early 2027.

Permits: #24-267281 OP-2025-01-24, Interior and Exterior Alterations. Landlord Work - Interior renovations to accommodate mechanical and electrical retrofit. Develop main floor and mezzanine levels into assembly space with offices with structural work including interior load bearing walls and ceiling structure. Second floor and third floor to be altered down to shell for future development. Exterior work to replace windows and doors with structural work for lintels over openings. New exterior facade to be constructed on the west side of the building and exterior preservation of existing with structural work to take place for both. Exterior ramp to main floor doors to be constructed for accessible entry.


385 Henderson Hwy
Location: 385 Henderson Hwy
Developer: The Manitoba Métis Federation
Architect: Number TEN Architectural Group
Status: In Development
Documents:
Media:      Renderings
Description: The redevelopment is led by the Manitoba Métis Federation (MMF), who acquired the Roxy Theatre (opened in 1929 and later Roxy Lanes, a 20-lane bowling alley since 1960) property. Their plan is to replace the former bowling alley with affordable seniors housing, specifically a 55-plus (age-restricted) in a mixed-use 50- to 60-unit six-storey building targeted at Métis seniors.
Permits: 2026-01-07, Demolition of a 2-storey building with 20,500 sq ft area. The building is greater than 3m in height. There will be some hazardous material removals, service disconnects, and the full removal of walls, floors, roofs, and foundations.


Pantages Playhouse Theatre revitalization
Location: 180 Market Ave
Developer: The Performing Arts Consortium of Winnipeg & Winnipeg Symphony Orchestra
Architect: Number TEN Architectural Group
Status: In Development
Documents: Mayor Announces $2 Million Boost for Downtown Arts
Media:Renderings
Description: The Pantages Playhouse Theatre in Winnipeg, a designated national historic site constructed in 1914 and vacant since 2018, is slated for a comprehensive $55–60 million restoration initiative spearheaded by the Performing Arts Consortium of Winnipeg (PAC) in collaboration with the Winnipeg Symphony Orchestra (WSO). This ambitious project, designed by Number TEN Architectural Group, aims to modernize the approximately 1,100-seat historic vaudeville venue by incorporating a deeper and wider stage, an orchestra pit, enhanced sightlines, and upgraded mechanical, electrical, and HVAC systems, all while meticulously preserving its distinctive Edwardian baroque façade and interior elements. The WSO is positioned to serve as the primary managing tenant, hosting the majority of its concerts in the revitalized space, with provisions for shared access by various community arts organizations. Funding for the endeavor is anticipated to be sourced equally from governmental contributions (approximately 50%) and private donations, supplemented by the City of Winnipeg's proposed multi-year commitment totaling $837,000. Acquired by the PAC in 2022 for a nominal $1 from previous developers who retained adjacent land for residential development, the extensive renovation is projected to extend several years, with completion unlikely before 2028 or potentially as late as 2029.
Permits:


La Cour
Location: 366 Marion St.
Developers: Paskwayak Development Corporation | Freedhome Developments Ltd.
Architect: Number TEN Architectural Group
Status: U/C
Documents: Variance-April 5, 2024
Media: Description: La Cour, a six-storey mixed-use apartment building comprising 127 residential units—including 52 designated as affordable—prioritizes tenancy for members of Opaskwayak Cree Nation (OCN) and other First Nations individuals. Developed in collaboration with Freedhome Developments Ltd. and wholly owned by OCN, a Manitoba First Nation community located near The Pas, the project features ground-level townhomes, a lobby lounge with co-working facilities, streetfront commercial spaces, and a heated underground parkade. Celebrated as a landmark example of Indigenous-led economic sovereignty, La Cour advances reconciliation efforts by providing quality housing options in Winnipeg while contributing to urban revitalization and community empowerment. This development is a recipient of the Affordable Housing Now program.
Permits: #24-267488 MU-2024-11-27, Construct New. Optional Professional Certification Program Permit. Construct a 123054 ft² 6-storey 129-unit multi-use residential building to include interior main floor parking garage and main floor CRU unit.


UWCRC 2.0 Granite Way Housing
Location: 22 Granite Way
Developer: University of Winnipeg Community Renewal Corporation (UWCRC)
Architect: Number TEN Architectural Group
Status: In development
Media:Documents: Subdivision and Rezoning February 6, 2025
Project Thread: 22 Granite Way | 12F
Description: The City of Winnipeg is advancing a proposed 111-unit mixed-income residential development on a city-owned surface parking lot adjacent to the historic Granite Curling Club in the West Broadway neighbourhood, along the Assiniboine River near downtown. The Granite Curling Club is the oldest in western Canada and occupies a heritage building under a month-to-month lease from the city. As part of commitments under the federal Housing Accelerator Fund to expedite affordable housing on municipal lands, the site was declared surplus and partnered with a non-profit developer. The project features red brick cladding to harmonize with the club's historic facade, a ninth-floor terrace offering views of downtown and the Manitoba Legislative Building, a mix of market-rate, affordable, and deeply affordable units, and Net Zero Carbon design standards. Although the development includes provisions for long-term financial support to the club through revenue sharing, the club's board has opposed it, citing concerns over the loss of parking spaces essential to its operations. Alternative parking options exist on nearby residential streets and, informally, in the large lot across the street at the Canada Life head office. The Manitoba Municipal Board recently ruled in favor of the club, recommending that the project proceed only with a parking plan approved by the tenant; however, the city maintains this oversteps provincial authority on municipal property rights and is proceeding with rezoning while committing to negotiate a new long-term lease and dedicated parking solutions.


Place of Pride
Location: 545 & 549 Broadway
Developer: Rainbow Resource Centre
Architect: Number Ten Architectural Group
Status: In development
Documents: Zoning Agreement Amendment-November 24, 2025
Media: Architectures role in empowering LGBTTQ+ community-Winnipeg Free Press
Renderings
Description: Wilson House, a municipally designated heritage building at 545 Broadway in Winnipeg—constructed in 1904 in the Queen Anne Revival style and formerly known as the Klinic building—is undergoing revitalization as a central component of the Rainbow Resource Centre's Place of Pride campus, Canada's first dedicated 2SLGBTQ+ campus. The renovations include external heritage remediation to preserve and restore the protected historic exterior features, as well as internal retrofitting to adapt the spaces for community needs, incorporating a ceremony room, community meeting rooms, and private counselling spaces. As part of Phase 2 of the project, which commenced construction in 2025 following the completion of the adjacent affordable housing building in 2024, these works are ongoing with full campus integration anticipated by 2027. The revitalized Wilson House connects seamlessly to the multi-family structure via a new one-storey glass-walled welcome centre, supporting expanded inclusive programming and support services for the 2SLGBTQ+ community.
Permits:


Bockstael Construction Head Office
Location: 663 Marion Street
Developer: Bockstael Construction
Architect: Number TEN Architectural Group
Status: U/C
Documents: Subdivision and Rezoning-January 8, 2025 | Variance-January 8, 2025
Media: Rezoning approved for Mission Industrial commercial property -Winnipeg Free Press
Description: Proposed is a two-storey mixed-used commercial building with Three (3) commercial retail units.
Permits:


WHRC Transcona
Location: 145 Transcona Boulevard
Developer: Winnipeg Housing Rehabilitation Corporation
Architect: Number TEN Architectural Group
Status: Partial Permit-Foundation
Documents: Plan Approval-March 17, 2025 | Submitted Plans | Submission
Media:Renderings
Description: A new six-storey affordable housing development at 145 Transcona Boulevard in Winnipeg's Transcona area is advancing to provide 154 units primarily for families and individuals with disabilities who are currently experiencing homelessness or at risk of it. Developed by the Winnipeg Housing Rehabilitation Corporation, the project designates 46% of the units as deeply affordable, with an additional 31 units set as rent-geared-to-income (RGI) for vulnerable populations, ensuring accessible housing options tailored to those in need. The Government of Manitoba is contributing $3 million in capital funding to support the initiative, which forms part of broader efforts—including federal Housing Accelerator Fund involvement—to increase supportive and affordable housing stock in the city. The project, which received approvals earlier in 2025 and is now underway as part of completed permitting phases, aims to deliver much-needed stable homes in a mixed-use building format. This development is a recipient of the Affordable Housing Now program & is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits: #25-202462 MU-2025-08-21-Partial Permit-Foundation


John Brebeuf Place Residences
Location: South side of John Brebeuf Place, west of Centennial Street, north of Grant Avenue
Developer: Shelter Canadian Properties Limited
Architect: Number TEN Architectural Group
Status: In development-Extension of Time
  • Extension of Time, On October 21, 2025, the applicant, McGowan Russell Group Inc., applied for an Extension of Time application and requested that the time limit to satisfy the Coming into Force provisions of By law No. 131/2022 be extended to December 15, 2026, in order to complete the required registrations.
Documents: Subdivision and Rezoning-June 24, 2022 | Variance-June 24, 2022 | Extension of Time-Subdivision & Rezoning-November 24, 2025
Media:
Description: Located on the south side of John Brebeuf Place—a neighbourhood greenway along a former rail line—in the J.B. Mitchell area of Winnipeg's River Heights-Fort Garry ward, the developer has rezoned an approximately 79,160-square-foot lot to enable the construction of two three-storey multi-family residential buildings. The project delivers a total of 63 dwelling units, comprising a mix of two- and three-bedroom suites, each featuring private balconies. The site design emphasizes generous open space, including a central pedestrian pathway separating the two buildings for enhanced connectivity and amenity. Parking provisions include 82 underground stalls and 14 surface visitor spaces, while bicycle facilities offer 48 secure indoor spaces (24 per building) supplemented by additional surface racks totaling 56 stalls overall.
Permits:


Lexington Commons Seniors Village
Location: 70 Lexington Park and Unnumbered Lexington Park
Developer: Palliser Furniture Ltd Canada
Architect: Number TEN Architectural Group
Status: In development-Extension of Time
  • On May 1, 2025, the Developer, McGowan Russell Group Inc. on behalf of the Owner, Palliser Furniture (Canada) Corporation applied for a Fourth Extension of Time application and requested that the time limit to satisfy the Coming into Force provisions of By-law No. 56/2021 be extended to June 24, 2026 in order to complete the required registrations.
Documents:Media: Innovative seniors development given OK-Winnipeg Free Press
Description: The developer has secured approval for the subdivision of a 7.53-acre parcel into five lots, with Lot 1 rezoned to RMU (Residential Mixed Use) to accommodate a mixed-use development featuring 414 residential units—comprising 276 assisted living and 138 independent living units—alongside approximately 18,998 square feet of commercial space organized around a central market square. Lots 2 and 3 have been rezoned to PR1 (Parks and Recreation) to establish a 2.5-acre public reserve, while the remaining two lots retain their existing M1 zoning. The project provides 511 parking stalls (exceeding the zoning requirement of 345), including 388 surface spaces and 123 below-grade spaces with 14 accessible and 4 van-accessible stalls, accessed via three private roads. Additional amenities include 35 bicycle parking spaces (20 below grade) and a dedicated garbage enclosure within the underground parking area.
Permits:


Beaumont Meadows Redevelopment
Location: 1321–1325 Beaumont Street
Developer: S.A.M. Properties Holding Inc.
Architect: Number TEN Architectural Group
Status: In development
Documents: Subdivision and Rezoning–July 3, 2025 | Variance–July 3, 2025
Media:
Project post–renderings
Description: The Beaumont Meadows Redevelopment involves significant upgrades to the existing townhouse complex. The developer has secured approval for the subdivision of the site on Beaumont Street, facilitating a four-phase development comprising four seven-storey buildings—with select portions stepped down to three or four storeys—yielding a total of 431 dwelling units, approximately half of which will be designated as affordable. Phase 1 entails the demolition of six existing structures to accommodate Building 1, which will include 138 residential units, a daycare facility, and two commercial units, while subsequent phases will feature Buildings 2, 3, and 4 with 72, 135, and 86 residential units respectively—Building 2 incorporating an additional 9,000 square feet of commercial space—along with the demolition of remaining buildings and the establishment of a central green plaza. The project enhances site efficiency by consolidating vehicular approaches from four to two, delivers 263 parking spaces (primarily surface-level with some integrated into Building 3), and provides 130 bicycle stalls. Comprehensive design details have been submitted for Phase 1, whereas Buildings 2 through 4 remain subject to further plan approval for final architectural elements.
Permits:


Bonavista 3 Multi-family Development
Location: 600 De La Seigneurie Boulevard
Developer: Genstar Titleco Limited
Architect: Number TEN Architectural Group
Status: U/C
Documents: Plan Approval-June 25, 2025 | Submitted Plans-June 25, 2025
Media:
Project post-renderings
Description: The developer has secured approval for a four-storey, T-shaped residential building featuring 156 dwelling units—consisting of 45 one-bedroom, 95 two-bedroom, and 16 three-bedroom suites—and reaching a maximum height of 44 feet 11 inches. The project provides 215 parking stalls, exceeding zoning requirements by 32 spaces, with a breakdown that includes 84 standard surface stalls, 100 in the parkade, 4 barrier-free surface stalls, 1 barrier-free parkade stall, 2 van-accessible surface stalls, and 24 visitor surface stalls. Bicycle facilities comprise 55 spaces, distributed as 40 outdoor, 11 in the parkade, and 4 on the main floor. Landscaping incorporates 36 trees and 156 shrubs, fully complying with zoning standards for street-edge planting (14 trees and 86 shrubs), building foundation (65 shrubs), interior parking lot (9 trees and 28 shrubs), and screening adjacent to single-family homes (13 trees). Site access is consolidated to a single private approach from De La Seigneurie Boulevard on the south side, with in-ground garbage bins situated within the surface parking area.
Permits: #25-260780 MU-2025-12-16: Construct New Permit. Genstar Bonavista 3 - Construct a 4 storey + basement, 186840 sqft, multi-family dwelling building, with 156 dwelling units & parkade.


Native Addictions Council of Manitoba
Location: 160 Salter Street
Developer: Native Addictions Council of Manitoba
Architect: Number Ten Architectural Group
Status: U/C
Documents:
Renderings
Description: The Native Addictions Council of Manitoba (NACM) is undergoing a major redevelopment of its historic facility at 160 Salter Street in Winnipeg's urban core, a former tuberculosis hospital. The Government of Canada is providing $21,373,177 through the Green and Inclusive Community Buildings Program (GICB), supplemented by NACM's $240,000 contribution, to transform the building into a culturally safe, healing-focused space for Indigenous individuals addressing addiction. Key features include a deep energy retrofit for improved efficiency and reduced consumption, enhanced accessibility with a new elevator, barrier-free washrooms and showers, upgraded electrical, mechanical, and life safety systems, and a new culturally significant, teepee-themed, barrier-free entrance designed as a welcoming landmark and counter to the institutional past. Led by Number Ten Architectural Group using trauma-informed design, collaborative empathy mapping, and visual listening, the project incorporates natural light, biophilic elements, improved acoustics, culturally appropriate artwork, and spaces that promote dignity, agency, relationship-building, and healing. The renovated facility will accommodate 22 participants and is slated for completion in 2026, enabling NACM to continue delivering traditional Indigenous practices in a nurturing, non-institutional environment for future generations.
Permits: 24-201327 EH-2024-10-25, Construct Addition. Construct a 41 sqm addition to existing multi-storey building, which serves as entry. The scope also includes renovation in all floors of the existing building, such as: construction of walls, installation of doors, millwork, new elevator, to make selected fit-up changes. It also includes installation of solar panels on the roof. Electrical and Mechanical work being done


Railside Residential Village at The Forks
Developer: The Forks North Portage Partnership
Site Architects: 5468796 Architecture | Scatliff + Miller + Murray
Status: Development Permit
Documents: PDF Storyboard
Media:Project Thread: Forks Redevelopment
Description: Railside at The Forks represents a transformative milestone in the evolution of Winnipeg's iconic meeting place, introducing the site's first-ever residential component by redeveloping two former surface parking lots—known as Railside and Parcel 4—into a vibrant mixed-use neighbourhood. Faithful to The Forks' founding vision as an all-season cultural and recreational hub, this significant project enhances the area's rich heritage with expanded commercial, retail, and high-quality public spaces, ultimately accommodating up to 2,500 residents in approximately 1,200 rental and condominium homes of varying sizes. Phase 1 features 10 distinct mid-rise buildings (typically 4-6 storeys) developed by a consortium selected through a competitive RFP process, with an emphasis on equitable, innovative, and diverse architectural designs to create a dynamic urban village. The layout is thoughtfully organized around a network of interconnected public open spaces that function as the development's "town squares"—primarily two central courtyards/plazas in Phase 1, linked by short pedestrian-priority streets, shared alleys, pathways, and additional green areas spanning over 3.5 acres of publicly accessible space. These plazas and courtyards serve as the heart of the neighbourhood, framed by the surrounding buildings to encourage gathering, with features like vivid lighting, outdoor seating, greenery, public art installations, café-style areas, and seasonal activation to foster connection, exploration, and year-round community life. Buildings are oriented to define and enclose these "outdoor rooms," activating ground floors with local shops, dining, cafés, services, arts, culture, and community spaces that prioritize pedestrians and cyclists while minimizing vehicle impact (kept to the perimeter). This creates a compact, walkable village atmosphere that seamlessly extends The Forks' existing attractions—such as the Market, recreational venues, and proximity to the Canadian Museum for Human Rights—connecting to downtown Winnipeg via Israel Asper Way and beyond, all while preserving sky views, reducing wind, and emphasizing sustainable, people-first design. The interconnected public realm, including these town-square-like courtyards and alleys, weaves the development into a cohesive, inviting extension of The Forks rather than isolated structures, ensuring public spaces remain the vibrant focal points for residents and visitors alike.
Permits: #24-138052 DP-2024-09-06, Permit. Development Permit Application for the first phase of the Railside South Development at The Forks'. Work includes re-alignment of the private approach, paving for parking, drive aisles, pedestrian connections, landscaping, installation of garbage enclosures and CSTE transformers, as well as the addition of six (6) fire hydrants to the site.










  • Railside | Art | The Candle
Location: Israel Asper Way
Developer: The Forks North Portage
Artist: Ian August
Status: Proposed
Project Thread: Forks Redevelopment
Media: The first public art piece unveiled for Railside at The Forks-The Forks Market
Description: Local Métis artist Ian August's whimsical sculpture titled The Candle has been selected as the first public art piece for the Railside at The Forks mixed-use development in Winnipeg. The artwork features an off-white candle form that bends and curves along the ground, emerging from a simple holder at one end and rising 12 feet high at the other, where a light mimics a flame, drawing inspiration from surrealist paintings and 1970s comic books. Positioned as a focal point in a public courtyard, The Candle will invite visitors to sit, rest, and socialize, symbolizing comfort, warmth, hospitality, home, and belonging while reflecting Railside's evolution into a residential community that fosters connection and welcome. August, who has personal ties to The Forks through past work and family memories, explains that the piece draws from universal symbols of opening one's home to create an accepting environment. The selection followed a 2023 request for qualifications from Manitoba-based artists, where 19 submissions were narrowed to four finalists, and August's conceptual proposal was chosen by a panel of experts. Funded by a $200,000 grant from The Winnipeg Foundation, The Candle will be installed upon completion of Railside's public courtyards and spaces, with construction on the broader development beginning in spring 2026.


Video Link

  • Railside | Kinꓘ | Site 16
Location: 26 Israel Asper Way
Developer: Green Seed Development
Architect: ATLRG Architecture
Status: Proposed
Documents: Report and Plans
Project Thread: Forks Redevelopment
Renderings
Description: Kinꓘ is a six-storey mass timber structure featuring 2 ground-floor commercial space alongside 33 deeply affordable apartment units. Its distinctive kinked form is strategically positioned closest to The Forks Market proper, incorporating a carved-out plaza that serves as an inviting gateway to the residential elements on this historic site, seamlessly blending affordability, sustainability, and enhanced public realm connectivity.
Permits:

  • Railside | Pilot & Porter Condominiums | Site 15
Location: 32 Israel Asper Way
Developer: StreetSide
Architect: Prairie Architects
Status: Proposed
Documents: VARIANCE-April 24, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application to build mixed-use building with two ground floor storefronts and 45 apartments on the floors above.
Permits:

  • Railside | Slip | Site 14
Location: Israel Asper Way
Developer: Vishin Developments/Trademark Homes
Architect: ATLRG Architecture
Status: Proposed
Documents:
Project Thread: Forks Redevelopment
Description: The Slip is a thoughtfully designed 4-storey mixed-use residential apartment building within the Railside at The Forks development in Winnipeg. It features up to five micro-commercial units at ground level to support small businesses and activate the streetscape, while the three upper storeys house 18 compact micro-residential rental units. Complementing these are amenities such as a public washroom on the ground floor, dedicated exterior tenant planter boxes for greenery, a rooftop deck for communal outdoor space, and an innovative rooftop urban apiary to promote local pollinators and sustainability. The building's dynamic, shifting form—with strategic overhangs and balconies—responds sensitively to its 360-degree surroundings, including adjacent plazas, public streets, and pedestrian alleys, thereby establishing a distinctive and engaging edge for the broader Railside neighbourhood.

  • Railside | Site 13
Location: 44 Israel Asper Way
Developer: Alston Properties
Architect: 1X1 Architecture
Status: Development Permit
Documents: VARIANCE-September 13, 2024
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a 6 storey mixed-use housing development (1 CRU & 35 Units)
Permits: #24-176694 DP-2024-11-12, Permit. Development Permit Application for a proposed 31,970 sq. ft. six-storey mixed-use building with a 3,108 sq. ft. commercial retail unit on the main floor and 35 multi-family residential units occupying the second through sixth floors.

  • Railside| site5 | Site 12
Location: 50 Israel Asper Way
Developer: Burrows
Architect: 2 Architecture
Status: U/C
Documents: VARIANCE-April 4, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg has approved a development permit for a new six-storey mixed-use building at 50 Israel Asper Way, located in the vibrant Railside at The Forks area. This 25,374 square foot project will feature ground-floor commercial space with eight rental units (likely retail or service-oriented) and 46 multi-family residential units on the upper levels, creating a compact live-work hub that supports urban intensification. The approval marks continued progress in transforming the former surface parking lots along Israel Asper Way—part of the broader 20-year Railside vision—into a pedestrian-friendly mixed-use neighbourhood adjacent to The Forks, blending commercial vitality with new housing options in downtown Winnipeg.
Permits: 24-235608 DP-2025-12-19 Permit. Development Permit Application for a proposed six-story 25,374 sq. ft. mixed-use building including 8 commercial rental units and 46 residential multi-family dwelling units. 2026-01-21, Partial Foundation Permit

  • Railside | Site 11
Location: 64 Israel Asper Way
Developer: Alston Properties
Architect: 1X1 Architecture
Status: Development Permit
Documents: VARIANCE-September 13, 2024
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a 6 storey mixed-use housing development (1 CRU & 23 Units)
Permits: #24-176631 DP-2024-11-12, Permit. Development Permit Application for a proposed 24,000 sq. ft. six-storey mixed-use building with a 2,150 sq. ft. commercial retail unit on the main floor and 23 multi-family residential units occupying the second through sixth floors.

  • Railside | Building 5X | Site 10
Location: 68 Israel Asper Way
Developer: Burrows
Architect: 2 Architecture
Status: U/C
Documents: VARIANCE-April 4, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg has approved a development permit and a related Conditional Use under Downtown Zoning By-Law No. 100/2004 for a new four-storey mixed-use building at 68 Israel Asper Way in the emerging Railside at The Forks neighbourhood. This compact 8,182 square foot project includes one ground-floor commercial unit featuring a coffee shop (restaurant use, approved despite not being directly accessible from the public sidewalk) and six multi-family residential units on the upper floors. The building incorporates a geothermal heating system for enhanced sustainability. As part of the broader Railside transformation—where construction on Phase 1 recently began in early 2026 to convert former surface parking lots into a pedestrian-oriented mixed-use community adjacent to the Canadian Museum for Human Rights—this smaller-scale approval contributes to the area's growing live-work density, adding modest housing and local amenity space along the revitalized Israel Asper Way promenade.
Permits: 24-235395 DP, 2025-12-19 Permit. Development permit for new construction of a four-story multi-use residential building with a total floor area of 8,182 square feet, including six residential units, a coffee shop, and a geothermal heating system. 25-234927 MU-2026-01-15, Construct New. Concurrent Building Permit Review - 5X - Construction of a 4-storey, 760 m², 6-unit mixed-use apartment building with CRUs on ground floor and roof top terrace.

  • Railside | Site 09
Location: 72 Israel Asper Way
Developer: Forks Renewal Corporation
Architect: Number TEN Architectural Group
Status: Development Permit
Documents: Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg has approved a development permit for a six-storey mixed-use project at 72 Israel Asper Way, part of the ongoing Railside at The Forks redevelopment initiative, which is transforming former surface parking areas into a vibrant, pedestrian-oriented mixed-use neighbourhood. The project features two connected buildings totaling approximately 79,409 square feet, linked by outdoor walkways at each level, and includes four commercial rental units on the ground floor and 91 residential units above, with Building A incorporating a rooftop patio amenity. This development advances urban intensification near The Forks, adding to the area's growing residential and commercial offerings as part of a broader phase that will deliver hundreds of units—including condominiums, market rentals, and affordable housing—by around 2027. When completed, the project will be a 91-unit, $38.1 million mixed-income residential development, of which 51 percent (46 units) will be affordable—28 of which will be two- and three-bedroom rent-geared-to-income units targeted towards low-income families and single mothers. On November 17, 2025, CMHC issued conditional financing approval under the Affordable Housing Fund of up to $28,601,843 on a secured basis for the project, confirming the financial viability of the project’s funding model; CMHC requires NPDC to guarantee this loan. FRC also seeks authority to borrow up to $2,498,947 on an unsecured basis, if required, to support its planned equity contribution to the project. Recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits: 25-139621 DP-2025-12-09, Permit. Housing Accelerator Fund - Development Permit Application for a proposed two building, 79,409 sq. ft. 6-storey mixed-use development containing a 91-unit Multi-Family Dwelling Use and 4 Commercial Rental Units located on the main floors. The two buildings are connected by outdoor walkways at each level and building A has a roof top patio amenity.

  • Railside | Building 5Y | Site 08
Location: 80 Israel Asper Way
Developer: Burrows
Architect: 2 Architecture
Status: U/C
Documents: VARIANCE-April 4, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg has approved a development permit for a new four-storey residential building at 80 Israel Asper Way, within the expanding Railside at The Forks neighbourhood. This compact 6,728-square-foot project will deliver 16 single-room occupancy (SRO) units, purposefully designed to serve artists, visitors, and local residents seeking affordable, compact living options near The Forks' cultural and recreational amenities. As part of the broader Railside initiative—transforming former parking lots into a vibrant mixed-use community with hundreds of new homes—this smaller-scale building contributes to diverse housing types, including affordable and specialized accommodations, amid the site's ongoing mid-rise developments along Israel Asper Way.
Permits: 24-235454 DP, 2025-12-19 Permit. Development permit for new construction of a four-story multi-unit residential building with a total floor area of 6,728 square feet, including 16 single-room occupancy units, designed for artists, visitors, and locals. 25-234976 MU-2026-01-15, Construct New. Concurrent Building Permit Review - 5Y - Construction of a 4-storey, 16-unit, 625 m² single-room occupancy building with a roof top terrace.

  • Railside | Station X | Site 07
Location: Israel Asper Way
Developer: UWCRC 2.0
Architect: LM-ESP
Status: Proposed
Documents:
Project Thread: Forks Redevelopment
Renderings
Description: Station X is a 7-storey, 67,275-square-foot mixed-use, mixed-income residential project at Railside spearheaded by the University of Winnipeg Community Renewal Corporation. The building delivers 73 studio to three-bedroom units blending affordable and market-rate housing, while its ground floor hosts a 56-space YMCA-YWCA child care centre and flexible live/work studios for small retailers and makers. Designed within a compact urban block to buffer nearby rail noise, the structure opens onto three landscaped front courtyards and crowns with a partial seventh-floor amenity level featuring a fitness room, multi-purpose lounge, and expansive terrace overlooking the Canadian Museum for Human Rights, the historic Forks site. Emphasising sustainability, community integration, and urban vitality, Station X is slated for completion in 2027.
Permits:

  • Railside | Boxcar Alley at Union Station
Location: Union Station/The Forks, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architect: PUBLIC CITY
Status: Proposed
Renderings
Description: As a part of the Railside Residential Village at The Forks development, The Box Car Alley design playfully highlights the space under the CN rail line at the Forks, a space that is currently under-utilized and overlooked. The project seeks to brighten the peripheries of The Forks, revitalizing an important public space through public engagement, local business promotion and creative opportunities for artists and visitors.


Market Lands (3 phases)
Location: 151 - 171 Princess Street
Status: U/C
Documents: MARKET LANDS PROJECT VISION • JUNE 2019 | CentreVenture Development Corporation 2024 Annual Report
Description:The Market Lands redevelopment in downtown Winnipeg's Exchange District stands as a major transformational project on the long-vacant site of the former Public Safety Building and Civic Parkade, which served the city for decades before its demolition around 2020. Reviving a location that historically hosted Winnipeg's public market in the early 1800s, this two-phase, mixed-use initiative—developed in partnership with entities like the University of Winnipeg Community Renewal Corporation (UWCRC 2.0) and CentreVenture—will deliver approximately 370 new residential units across sustainable, net-zero-energy buildings featuring affordable and mixed-income housing options. Construction is progressing toward completion in the coming years, filling a prominent gap in downtown Winnipeg with environmentally conscious, pedestrian-oriented development.
Media: Construction on Market Lands development set to begin in January-CBC News Manitoba YouTube
Project Thread: Market Lands Redevelopment
Location: 148/150 King Street
Architect: Daoust Lestage
Developer: CentreVenture Development Corporation & UWCRC 2.0
Description: Phase one is a pioneering $55 million nine-storey mixed-use development in Canada and is one of the country's earliest net-zero carbon projects, designed to generate as much energy as it consumes through a high-performance building envelope and a south façade entirely clad in solar panels. The building will deliver 95 mixed-income apartments—including 48 rent-geared-to-income units—alongside a prominent 20,000-square-foot Creative Hub, an innovative "art cube" dedicated to hosting four non-profit arts and culture organizations, fostering community creativity and sustainability.
Permits: #23-245347 MU-2024-05-16, Construct New. Construct new (9) nine storey multi-family dwelling with commercial space on the main floor & 95 residential units on the upper floors; (3) three storey art cube commercial building & (3) three storey hall that connects the residential tower to art cube building. PERMIT EXTENDED 3 YEARS. Building Permit extended three (3) years from date of Permit issuance in conformance with City of Winnipeg Building By-Law 4555/87, Sections 14.1.3 (1) (a) and (b).

  • Market Lands | Northern Development Site | Phase 2
Location: King Street
Developer: UWCRC 2.0
Architect: Number TEN Architectural Group
Status: In Development
Documents: Conditional Use-May 30, 2025 | Variance-June 2, 2025 | Appeal-Variance-July 14, 2025
Media:Description:
Phase 2 is a two-building development wrapped around a raised central courtyard and a ground level public plaza. Both buildings are seeking Net Zero certification under the Canada Green Building Council Zero Carbon Building Design Standard. Building 1 (Market Lands North Tower), at the northwest corner of the site, is a 16-storey building with 148 units of mixed-income and affordable housing. The ground floor includes retail space and a public plaza. Building 2 (Market Lands North Mixed-Use), which wraps the other three corners of the site, is a 6-storey building with 127 residential units and will be home to commercial space for non-profit tenants. There will also be a childcare centre along King Street, with an outdoor play space in the courtyard. Building Two will also provide 91 indoor parking spaces. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
  • 1. Market Lands North Tower
Location: 171 Princess St.
Status: Partial Permit-Foundation
Description: 148 unit - 16 storey Corten Steel tower with CRU
permits: 25-251330 MU-2025-11-28-Partial Permit-Foundation

  • 2. Market Lands North Mixed-Use
Location: 151 Princess St.
Status: In Development
Description: 127 units - 6 storey residential block with daycare & CRU
permits:

  • Market Lands | The Marketplace ( Southern Development Site) | Phase 3
Status: In Development
Architects: LM Architectural Group
Description: The future marketplace will be integral to the Market Lands design while meeting the needs of the greater neighbourhood. Food & Beverage Manitoba, an industry-led, not-for-profit association, is developing a unique concept that will provide critical infrastructure and support to producers by offering advanced production capacity and a market to showcase and sell made-in Manitoba projects. This space will also host a food hall with a rotating display of culinary delights, as well as retail space to sell Manitoba-made food and beverages.



The Sutton Place Hotel
Location: 220 Carlton St
Developer: Northland Properties Corporation
Architect: Pacific Coast Architecture Inc
Status: Under Construction
Documents: VARIANCE-May 17, 2024
Project Thread: Winnipeg | True North Square
Media:Renderings
Description: The revised plans as of July 2025 for The Sutton Place Hotel in Winnipeg's True North Square feature a 10-storey, 24,876-square-metre building comprising a two-storey podium—with mezzanine level incorporating lobby, commercial spaces, parkade, and rooftop terrace—surmounted by an eight-storey hotel tower. The development also includes an underground parkade and a skywalk connection along Carlton Street to adjacent buildings, enhancing pedestrian integration within the downtown district.
Permits:


127 Bannatyne
Location: 127 Bannatyne Ave
Developer: Alston Properties Ltd. | Concord Projects Ltd.
Architect: AtLRG
Status: Completed July 2025
Documents: Appeal-Variance-April 25, 2022
Media:Description: A 10 storey infill in the historic Exchange District replaces a surface parking lot with underground parking, main floor commercial space, 2nd floor office space which will be the new headquarters for Concord Projects, and 80 residential apartments above with a roof terrace amenity. The podium portion interfaces with the heritage qualities of the streetscape through scale and materiality; the tower portion is set back and subservient.
Permits: #21-242920 MU“2022-08-19, Construct New. 127 Bannatyne- Construct a 111,805 sq.ft 10 storey 80- Unit multi- family dwelling building with 3 CRUs on the main floor, office on the second floor and underground parking



31 Riel
Address: 31 Riel Ave street Winnipeg, MB
Developer: Trademark Builders Inc
Architect: AtLRG
Status: Completed fall 2025
Renderings
Description: A four-storey, 68 suite residential building with ground floor commercial suites complete with underground parking. The gable roof extends the amount of liveable space with the inclusion of brightly-lit mezzanine space for the forth floor suites, while also providing a distinctive identity to the local multi-family housing typology.
Permits: #21-243597 MU-2022-05-10, Construct New. Monet House- Construct a 100780 sq.ft 4 storey 68- Unit multi- family dwelling building with 4 CRUs on main floor.


Rubin Block - First Nation Healing Centre
Location: 270 Morley Avenue
Developer: Fisher River Cree Nation
Architect: AtLRG
Status: U/C
Documents: Variance - September 9, 2024
Renderings
Media: Fisher River Cree Nation to restore century-plus old building on Osborne Street-CBC News Manitoba
Description: The historic Rubin Block building in Winnipeg will be transformed into a modern multi-family transitional complex, providing safe transitional housing for families in need. The building will contain 13 family sized apartment units, a small office and reception area, and one rentable commercial space fronting Osborne Street on the ground floor. This development is a recipient of the Affordable Housing Now program.
Permits: #24-256610 MU-2025-04-08, Construct Addition. Landlord work to a 3 storey 23,801 Sq. Ft. building to include 13 residential suites and 1 CRU unit on the ground floor. Work to include complete demolition and construction of new openings, partition walls, windows and doors. New roof being installed. Construct a one-storey 240 sq ft addition to the rear. Mechanical and electrical work being done. New one-storey elevator lobby will be constructed on south façade.


Harbourview Terrace
Location: 1820 De Vries Ave
Developer: Foxhill Properties
Architect: AtLRG
Status: In Development
Documents: Subdivision and Rezoning, Variance – January 7, 2026
Media: -
Project post-renderings
Description: In Winnipeg's North Kildonan neighbourhood, a former lumber yard is set to be redeveloped into a modern 179-unit, six-storey apartment building, with completion expected in 2027. The project involves consolidating the properties, rezoning them from light manufacturing to medium-density multi-family residential, and demolishing the existing industrial buildings to make way for the new development. The U-shaped building, with a footprint of about 35,304 square feet and a height of 65 feet, will feature a mix of studio, one-bedroom, two-bedroom, and three-bedroom units. Its design maximizes southern sunlight while creating a spacious central courtyard that serves as the community's main green space and social hub. On-site amenities will include a dog run, raised garden beds, and extensive landscaping with dozens of new trees, shrubs, and foundation plantings along De Vries Avenue and Sun Valley Drive. Vehicle access will come from new entrances on both De Vries Avenue and Sun Valley Drive, with parking—269 spaces in total, including 191 surface and 78 indoor spots—arranged around the perimeter to shield residents from nearby traffic. The development also provides 28 secure bicycle spaces, seven accessible parking stalls, and 25 guest spots. Exterior finishes will combine textured light grey stucco-like panels with thin brick veneer, giving the building a contemporary yet warm appearance. Garbage and recycling facilities will be conveniently located on the north side of the building. With its thoughtful layout, generous setbacks, and focus on greenery and resident comfort, this $45-million project aims to bring sustainable, higher-density housing to the city's suburban edge while turning an underused industrial site into a lively residential community.
Permits:


Solara Flats
Location: 308 Colony St
Developer(s): Lotus Equity Partners Inc & UWCRC 2.0
Architect: Cibinel Architecture
Status: Completed Winter 2026
Documents: Zoning Agreement Amendment December 7, 2020
Project Thread: Winnipeg | 308 Colony St | 21F
Media: University charity spearheads innovative approach to affordable housing in Winnipeg-Journal of Commerce
Description: Solara Flats, a $77 million 21-storey mixed-use tower in downtown Winnipeg, stands as one of Canada's pioneering net-zero carbon residential high-rises, featuring integrated building photovoltaic (BIPV) panels that function as an energy-generating asset—providing a strong return on investment while optimizing daylight harvesting and reducing cooling loads. The development encompasses 214 mixed-income rental units ranging from studios to two-bedrooms (including a significant portion of affordable and barrier-free-adaptable suites) and incorporates commercial retail units (CRUs) on the ground floor, advancing sustainable urban living in the heart of the city.
Permits: #23-134842 MU-2023-07-27, Construct New. Construct a 22 storey, 162891sqft, Residential multi-use building, with 2 CRUs on the main floor, 214 Apartment units (on 2nd to 21st floor), Mechanical room (on 22nd floor)


Elswood
Location: 269 River Ave.
Developers: Brokenhead Ojibway Nation Development Corp. | Freedhome Developments Ltd.
Architect: Cibinel Architecture Ltd
Status: U/C
Documents: Variance-May 5, 2025 | Zoning Agreement Amendment-July 3, 2025
Media: Project Thread
Description: The Elswood, an Indigenous-led multi-family housing development wholly owned by Brokenhead Ojibway Nation on Treaty 1 lands along the Assiniboine River, represents a historic milestone in urban Indigenous ownership and reconciliation in Winnipeg's vibrant Osborne Village neighbourhood within the Fort Rouge-East Fort Garry ward. Located on the north side of River Avenue at 269 River Ave., this seven-storey, L-shaped apartment building will deliver 147 energy-efficient rental units, including 60 deeply affordable suites prioritized for Brokenhead Ojibway Nation members and other First Nations residents, alongside community amenities such as a heated parkade and fitness centre, signalling a meaningful step toward safe, inclusive housing and economic partnership in the heart of the city. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits: #25-219282 MU-2025-10-01-Construct new 7-storey, 124,131 sq. ft multi-family residential building with 147 dwelling units.


530 St. Mary Ave. & 252 Good St.
Location: 252 Good St.
Developers: Longboat
Architect: Cibinel Architecture
Status: Partial Foundation Permit
Documents: Variance-June 25, 2024
Media:
Description: A new privately owned seven-storey mixed-use development by Longboat Development Corporation at 530 St. Mary Avenue and 252 Good Street in Winnipeg's West Broadway neighbourhood will deliver 165 residential units, including 50 affordable housing suites, alongside 1,780 square feet of ground-level commercial space fronting St. Mary Avenue. Designed with universal accessibility in mind, the project incorporates ground-level townhouse-style units along Good Street to enhance pedestrian scale and street activation, contributing to infill revitalization in the area. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits: #25-204904 DP-2025-10-14- Development Permit Application for a proposed 7-storey 143,408 sq. ft. multi-family dwelling with a commercial units on main floor and 165 residential units on upper levels.


685 Westminster Ave
Location: 101 & 103 Sherbrook Street and 685 Westminster Avenue
Developer: Lotus Holdings Winnipeg Ltd
Architect: Cibinel Architecture Ltd
Status: in development
Documents: Subdivision and Rezoning-September 29, 2025 | Variance-September 29, 2025
Media: Safer West Broadway touted with apartment proposal for Sherbrook Inn lot-Winnipeg Free Press
Project post
Description: A proposed six-storey mixed-use development will transform the surface parking lot adjacent to the revitalized Sherbrook Inn in Winnipeg's West Broadway neighbourhood, delivering 86 residential units—a mix of studios, one-, two-, and three-bedroom suites ranging from 450 to 1,350 square feet—with up to 25% classified as affordable under CMHC standards and eight meeting Manitoba Housing requirements. The 69-foot-tall building, featuring brick, cement board, and stucco exteriors, includes a 1,000-square-foot ground-floor commercial space with a wide south-facing patio fronting Westminster Avenue, cantilevered upper floors sheltering the residential lobby, and ground-level townhouse-style units along Furby Street with individual entrances, reduced setbacks, and private yards to maintain pedestrian-scale character. Enhanced accessibility features barrier-free design throughout, with visitable and fully adaptable units; energy efficiency exceeds the National Energy Code by 25%; landscaping preserves seven mature trees while adding 10 new trees and 45 shrubs; and site amenities provide 50 surface parking stalls (26 for residents, 20 for the inn, two for commercial, and two for car sharing), outdoor racks for 14 bicycles, and secure indoor storage for 43. The project aims to increase density in this walkable area, activate the streetscape, and promote safety through greater "eyes on the street" presence.


414 & 418 Gertrude Ave
Location: 418 Gertrude Ave
Developer: CIBINEL PROPERTIES LTD.
Architect: Cibinel Architects Ltd.
Status: In development
Documents: Variance-May 1, 2025
Media: -
Description: The applicant proposes a 5-storey mixed-use building on Gertrude Avenue, featuring 32 residential units and 2 ground-floor commercial units. It includes 16 vehicle parking spaces within an internal structure, a car share vehicle, a 22-stall indoor bike room, outdoor parking, and a front patio space.


Canopy
Location: 1530 Warde Ave
Developer: Longboat
Architect: Cibinel Architecture
Status: Completed October 2025
Documents: variance:-January 20, 2023
Media:
Description:The developer has constructed in the Bonavista neighborhood a 5-storey mixed-use building featuring 110 residential units and five ground-floor commercial units. The development includes 152 parking stalls, with 102 located at-grade behind the building and 50 situated below grade under the structure.
Permits: #23-205675 MU-2024-03-05, Construct New. Construct a 130,683.3 ft² 6-storey 110-unit multi-family apartment building with 5 CRU commercial units on main floor and main floor interior parking.



The Eritrean Community In Winnipeg
Location: 507 Elgin Avenue
Developers: The Eritrean Community In Winnipeg | Inuka Community Inc.
Architect: Cibinel Architecture Ltd
Status: In development
Documents: Variance-August 27, 2025
Media:
Project post-renderings
Description: A local organization, the Eritrean Community in Winnipeg Inc., is proposing a new six-storey, 55-unit affordable housing building in the Centennial neighbourhood. All units will be rented at below 80% of the area’s median market rent, with 20% of them fully accessible for people with mobility needs. The ground floor along Isabel Street will feature resident amenities including shared laundry, a lounge, and a small hair salon, while the second floor will house a resource centre with a multi-purpose room, office, counseling space, and small business centre, plus a secure rooftop terrace for outdoor space. The building will stand 70 feet tall and include six indoor parking stalls (one for car-sharing), secure indoor bike parking for 28 bicycles, and eight more bike spaces outside. The design uses brick at ground level, modern materials above, plenty of windows for safety and connection to the street, and a welcoming main entrance with a covered seating area. Safety-focused design principles (CPTED) are built in, with large glass areas in the lobby and stairwells. Landscaping will add trees and shrubs along both Elgin Avenue and Isabel Street, including ornamental grasses, to soften the street edges. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits:


Atelier
Location: 300 Tuxedo Avenue
Developer: IG Mackenzie Real Property Fund
Architect: Raymond S.C. Wan Architect
Status: Completed Sept 2025
Renderings
Media: A lease on luxury; Deluxe apartment tower taking shape in Tuxedo-Winnipeg Free Press
Description: 13 storey, 84 unit rental apartment tower, three (3) commercial units on main floor. A Shell gas station that occupies the site will be demolished for this development.
Permits: #22-124074 MU-2024-07-26, Construct New. Construct a 13 storey 12 998 sq m, 84 unit multi family dwelling building with commercial space on the main floor and 3278 sq m of underground parking.



Sage Creek Poplar Ridge
Location: 175 Sage Creek Boulevard
Developer: Sage Creek Development Corporation
Architect: Raymond S C Wan Architect Inc
Status: U/C
Documents: Plan Approval-February 21, 2025 | Submitted Plans | Submission
Media:
Description: The applicant proposes a low-rise multi-family residential development with a building primarily six stories tall, stepping down to four stories along Sage Creek Boulevard. The structure measures 39.4 feet to the fourth floor and 64 feet to the sixth-floor parapet. It includes 98 dwelling units (6 studio, 35 one-bedroom, and 57 two-bedroom) and 119 parking stalls (45 at grade, 74 underground). The landscaping plan exceeds minimum requirements, featuring 4 coniferous trees, 26 deciduous trees of five species, 28 coniferous shrubs of two species, and 151 deciduous shrubs of five species.
Permits: #25-165598 MU-2025-06-17, Construct New. Six storey multi-family residential building with residential amenities 2,198 sq.m


Steinbach Credit Union (Renovation)
Location: 2100 McGillivray Blvd, Winnipeg, MB
Developer: Steinbach Credit Union
Architect: Raymond S.C. Wan
Status: In Development
Media: Community committee approves credit union renovation-Winnipeg Free Press
Documents: Plan Approval-November 26, 2024 | Submitted Plans | Preliminary Design Concept
Description: Plans were approved for an addition and renovation to the pre-existing Steinbach Credit Union bank and office space. The addition will include new office space for staff, as well as a larger bank hall area for the general public. The new section of the building will be added to the south side, facing McGillivray Boulevard.
Permits:



Altea Living
Location: 100 South Town Road
Developer: Altea Real Estate Holding
Architect: Raymond S C Wan Architect Inc
Status: In Development - Extension of Time – October 30, 2025
Documents: Subdivision & Rezoning-February 27, 2024 | Variance-February 27, 2024
Media:
Description: Plans are to accommodate a multi-unit residential development with 102 residential units and 7,975 square feet of commercial space on the ground floor next to Altea Active Winnipeg. The proposed height is 10 storeys at 107 feet. This height tapers down to 6 storeys (approximately 65 feet) at the rear of the building with 115 underground stalls.
Permits: -


St. Mary's Apartments
Location: 1009 St. Marys Road
Developer: Kenmare Developments Inc.
Architect: Raymond S C Wan Architect Inc
Status: In Development
Documents: Subdivision & Rezoning-May 27, 2024 | Variance-May 27, 2024
Media: Committee approves subdivision, rezoning of St. Eugene Parish siteWinnipeg Free Press
Project post-renderings
Description: A proposed seven-storey multifamily residential development on the site of the preserved St. Eugene Parish in Winnipeg's St. Vital neighbourhood will deliver 120 rental units in a concrete structure featuring modern finishes and a subtle L-shaped configuration. Enabled through rezoning and subdivision, the project preserves the existing parish while generating essential income to sustain its operations. The building will incorporating main-level and underground parking alongside ground-floor amenities—such as a welcoming lobby, multi-purpose room, gym, and office—strategically oriented toward St. Mary's Road to enhance street activation, presence, and community integration.
Permits:


Kildonan Place Mall Renovation
Location: 1555 Regent Avenue West
Developer: Primaris Management Inc.
Architect: Raymond S C Wan Architect Inc
Status: U/C
Documents:Media:Description: The developer proposes a targeted redevelopment of the existing commercial site by demolishing the northernmost portion—formerly a movie theatre—to introduce a new mall entrance and dedicated drop-off area. Key enhancements include a modern 10-stall food court with expanded seating capacity increased to 550 from the previous 250, additional commercial retail units (CRUs), upgraded washrooms, and new office space. The northern parking area will be reconfigured to provide additional stalls exceeding Winnipeg Zoning By-law requirements, while the westernmost access to Reenders Drive will be removed to optimize traffic circulation and improve overall site functionality.
Permits: 25-238732 RP-2025-11-14, Interior and Exterior Alterations. Kildonan Place Mall: Interior and exterior alterations to the shopping mall with proposed work include renovation of the food court involving complete demolition of some section of the building that is section-A(some area of cinema, CRU's & lobby area) and constructing new food court area, CRU's etc. Also, for the section-B, the proposed work involves removal of the existing walls to provide new openings and constructing office space, guest services area. Structural work involved with removing some columns, concrete slab, roof and infilling some sections. Structural , Mechanical and Electrical work is involved.


Springs Christian Academy
Location: 595 Lagimodiere Boulevard
Developer: Springs Church
Architect: Raymond S C Wan Architect Inc
Status: U/C
Documents:Media: Build the Future | Building Walkthrough-YouTube
renderings
Description: Springs Christian Academy is proposing a new junior/high school, which includes a two-story school that will connect to the current building on its south side offering sports facilities and multi-purpose areas. This development also features new outdoor amenities such as a soccer field and a relocated playground on the north side of the property. In addition, the plans call for a new green space and plaza to be developed, situated between the existing structure and the proposed new school building.
Permits: #24-141445 DP-2024-06-14, Permit. Development permit for the construction of a new junior/senior high school addition to existing elementary school/place of worship



Shanghai Tower
Location: 232 King Street
Developers: Winnipeg Chinatown Development Corporation
Architect: Raymond S.C. Wan Architect
Status: U/C
Documents: VARIANCE-January 20, 2025
Media: Renderings
Description: The Shanghai Residence, a seven-storey mixed-use development at 232 King Street in the heart of Winnipeg's historic Chinatown—between Pacific and Alexander Avenues—delivers 54 affordable rental units geared toward newcomers to Canada, incorporating a dedicated daycare facility and multi-purpose community spaces. Designed with active ground-floor uses along King Street, including the daycare and multi-purpose room, the project features a screened accessory parking area beneath the building with loading zones, accessible stalls, and compact spaces, while approximately half the frontages on Pacific and Alexander Avenues remain open: one portion as a private plaza and the other as a fenced outdoor play area for the daycare, contributing to neighbourhood revitalization and enhanced public realm activation. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits: #25-194587 MU-2025-07-31, Construct New. "Affordable Housing Support" Optional Professional Certification Program Permit. Construct a 7 storey, 6225 sqm multi-family dwelling building, with 54 units. A day care and multi-purpose hall on the main floor.


Molson & Concordia Mixed-Use
Location: Southeast Corner of Molson Street and Concordia Avenue
Developers:
Architect: Raymond S.C. Wan Architect
Status: In Development - Extension of Time-June 23, 2025
  • On May 28, 2025, the Applicant, applied for an Extension of Time application and requested that the time limit to satisfy the Coming into Force provisions of By-law No. 28/2023 be extended to June 22, 2026 in order to complete the required registrations.
Documents: Rezoning-February 14, 2023 |
Media: -
Description: The applicant proposes a six-storey mixed-use building on the subject property, featuring a 4,450 sq. ft. commercial unit on the ground floor along Concordia Avenue and 60 residential units across the upper five floors. The development includes 77 surface parking spaces located under, behind, and beside the building, with access provided via two approaches on Molson Street and Concordia Avenue. The design is well-executed, with a street-oriented commercial entrance, ample ground-floor windows, screened underbuilding parking with decorative fencing and landscaping, and articulated upper elevations through varied wall planes, rooflines, balconies, window placements, and façade materials. The west elevation facing Molson Street includes windows, balconies, and an exit door to enhance street engagement.


Station Place 01 | Station Place 02
Location: Station Place
Developer: Carrington Real Estate
Architect: MMP Architects Inc.
Status: Under Construction
Documents: Project Thread: 25 & 28 Station Place
Media: Raising the bar in Winnipeg; Carrington Real Estate breaks ground on premiere rental property-MediaEdge
  • STNP 01 - Phase 1 is a transit-oriented development in the Fort-Rouge neighbourhood featuring a luxury 16 storey highrise tower with a total of 149 units. The estimated completion date is Spring 2026.
  • STNP 02- Phase 2 features a luxury 22 storey highrise tower with a total of 203 units, 3 commercial units and structured parking, will also Include an 18 tall ground floor restaurant space on the north facade oriented towards Station Place. The estimated completion date is Fall 2027.
Permits: #24-110133 MU-2024-10-15, Construct New. Construct a 16 storey, 11847 sqm mixed use, multi-family dwelling building, (having 125 residential units and 3 CRUs), linked to a 3 storey, 6552 sqm Parkade + multi-family dwelling building (having 24 residential units).


DSM
Location: 185 Donald Street
Developer: Carrington Real Estate
Architect: MMP Architects Inc
Status: U/C
Project Thread: 185 Donald St | 14F | Mixed-use
Renderings
Media: Carrington Real Estate revives Donald-St. Mary residential tower project, taps Keg for main floor-Winnipeg Free Press
Description: DSM, is a 14-storey luxury high-rise at the corner of Donald Street and St. Mary Avenue in downtown Winnipeg, offering 160 modern rental apartments blending premium finishes with urban convenience. The ground floor will welcome a new downtown location for The Keg Steakhouse + Bar, while the second floor serves as the headquarters for Carrington Real Estate, contributing to the revitalization of this central district with a mix of residential and commercial vitality.
Permits: #24-265056 MU-2025-02-28, Construct New. Child Permit for new revisions: Donald & St. Mary Mixed use Development- Construction of 15633 sq.m 15- storey, high rise mixed- use building that includes 160 residential suites, a 3- storey attached parkade, 1 raised roof patio deck. The ground floor includes restaurant space. Revision of Level 02 - 15 Suite Layouts and Revision of Masonry Exterior Cladding to EIFS Cladding (Level 04-15) as per revised drawings.


PROV 01
Location: 159 Provencher Boulevard
Developer: Carrington Real Estate
Architect: MMP Architects Inc
Status: U/C
Documents: Plan Approval-September 24, 2024 | Approved Plans
Media: Project Thread: 165 Provencher Blvd | PROV 01
Description: Promenade Provencher, an eight-storey mixed-use development in Winnipeg's St. Boniface neighbourhood, features 94 residential apartment units alongside approximately 5,000 square feet of commercial space—including five ground-floor retail units and one second-floor office suite occupied by Wolfrom Engineering. This long-awaited project, which broke ground in June 2025, aims to revitalize the historic Provencher corridor by enhancing street-level activity, supporting local businesses, and contributing to the area's residential density and cultural vitality.
Permits: #25-125238 MU-2025-10-15, Construct New. Construct a 9-storey, 10,373 sq.m.,95-dwelling unit building with retail & restaurant space on the main floor and underground & surface parking area.


The District At Bridgwater - Offices
Location: 345 Centre Street
Developer: Private Pension Partners
Architect: MMP Architects
Status: Partial Foundation Permit
Documents: Plan Approval-May 26, 2025 |Submitted Plans | Submission
Media: Brand-new Bridgwater office building gets green light from Assiniboia committee-Winnipeg Sun
Project Post-Renderings
Description: A proposed four-storey, approximately 40,000-square-foot mixed-use commercial building by Private Pension Partners at 345 Centre Street in Winnipeg's Bridgwater Centre neighbourhood—near the intersection of South Town Road and northbound Kenaston Boulevard—will feature office uses on the upper floors and three ground-level commercial units, including a prominent restaurant of roughly 3,445 square feet with an accessory west-side patio. The development anticipates a future expansion phase on adjacent lands to the west, enhancing commercial offerings and pedestrian amenities in this growing suburban hub.
Permits: #25-136426 DP-2025-06-13, Permit. Development permit for the construction of a new 53,650 sq. ft. 4 storey commercial multi-tenant building. Site development partially completed from previous development permit.


Ndinawe Transitional Housing
Location: 473 and 475 Flora Avenue
Developer: Ndinawemaaganag Endaawaad Inc.
Architect: MMP Architects Inc.
Status: U/C
Documents: Subdivision and Rezoning-September 5, 2024 | Variance-September 5, 2024
Media: The Winnipeg Foundation issues more than $5 million to local charities through its Major Capital Grants Program-The Winnipeg Foundation
Project post
Description: This new three storey multi-family 23-unit transitional housing development in Winnipegs North End will provide housing with wrap-around supports for Indigenous youth. The ground floor will be clad in masonry, as it is a robust and resilient material, it will be representative of traditional beadwork. Ndinawemaaganag Endaawaad (Ndinawe), a non profit, community based organization will occupy a portion of the ground floor, the organization provides outreach, education, recreation, and shelter support for at-risk youth ages 11-24. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits: #25-146956 MU-2025-06-03, Construct New. Affordable Housing Support Ndinawemaaganag Endaawaad Inc. - Construct a three-storey, 12,156 ft², new apartment building with 23 units.


Anne Oake Family Recovery Centre
Location: Corner of Snow Street and Dartmouth Drive behind Victoria General Hospital
Developer: The Bruce and Anne Oake Memorial Foundation
Architect: MMP Architects Inc.
Status: In Development
Documents: Conditional Use-October 9, 2025 | Appeal – February 25, 2026
Media:Description: The Anne Oake Family Recovery Centre is a planned women-only addictions treatment facility designed to honor the legacy of Anne Oake, a dedicated advocate for addiction recovery who passed away in 2021. Located on the corner of Snow Street and Dartmouth Drive behind Victoria General Hospital, the 75,000-square-foot, two-story facility will offer 50 to 70 beds and include a licensed on-site daycare to support women with children, addressing a key barrier to treatment by allowing mothers to remain close to their families during recovery. The centre will provide long-term residential treatment, modeled after the 16-week program at the Bruce Oake Recovery Centre, which combines group therapy, one-on-one counseling, and evidence-based interventions like the Twelve Step Model with behavioral therapy. It aims to offer comprehensive recovery services in a supportive environment, with access to lifelong counseling and a sliding price scale to ensure no one is turned away due to financial constraints. The Manitoba government has committed $1.5 million ($1 million for construction and $500,000 for programming), and the Bruce Oake Memorial Foundation has a $25 million goal. The centre responds to Manitoba's high addiction rates and aims to reduce wait times, providing hope and healing for women and families. No opening date has been confirmed, but efforts are focused on completing the facility as quickly as possible.
Permits:


738 Rue St. Joseph
Location: 738 Rue St. Joseph, St. Boniface, Winnipeg, MB
Developer: Edison Properties
Architect: MMP Architects
Status: In Development
Renderings
Media: Consultation process for old Parmalat site ramps up -Winnipeg Free Press | Ancien site de l'usine Parmalat : un projet et plusieurs inquiétudes-Radio-Canada
Description: Edison Properties is considering an application to rezone the vacant parcel so that it can eventually accommodate multi-family development.
Permits:


East Block Lofts
Location: 138 Portage Ave E
Developer: Space2Developers
Architect: Northern Sky Architecture Inc.
Status: U/C
Project Thread: 138 Portage Ave | East Block Lofts
Media: Future building on history; East Block Lofts: residential redevelopment set for 114-year-old structure on Portage Avenue East-Winnipeg Free Press
Description: Plans for the historic heritage property east of Portage and Main proposes to redevelop the 105-year-old seven-storey Keewayden block, transforming it into a 117-unit apartment building with new 7 storey addition to the east side. This project is a recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits:#24-122698 MU-2024-06-13, Construct New. East Block Lofts - Construct a 7-storey, 106,460 ft², new building (multi-family dwelling complex) tied in with existing heritage structure, with 117 units.


Alloway Lofts
Location: 179 McDermot Ave
Developer: Space2Developers
Architect:
Status: In Development
Media:
Project PostDescription: CentreVenture Development Corporation announced a major initiative to revitalize four historic yet underutilized buildings in downtown Winnipeg, injecting new residential life into the city's core with support from $4.7 million in public funding. Among the projects is Alloway Lofts, the redevelopment of the Alloway Building in the Exchange District. This three-storey heritage walk-up, originally constructed in 1903 as a revenue property for businessman W.F. Alloway, will be transformed into 14 residential units. The conversion aims to preserve the building's historic character while addressing long-term vacancy and bringing much-needed housing to the city core. This project is a recipient of the Housing Accelerator Fund Capital Grant Incentive & the Gail Parvin Hammerquist Fund City-wide Heritage Program.
Permits:


120 & 128 James Ave.
Location: 120 & 128 James Ave
Developers: Veritas Development Group Ltd.
Architect: Northern Sky Architecture Inc
Status: Partial Foundation Permit
Documents: Appeal-Variance-April 16, 2025
Media: -
Project Thread: 120/128 James Avenue | 10F
Description: Veritas Development Group's proposed project at 120 and 128 James Avenue in Winnipeg's historic Exchange District involves a sensitive heritage conversion: adding a four-storey rooftop extension to the existing DeLaval Warehouse (Fred Ingaldson Building) at 128 James Avenue to create 16 new dwelling units, while constructing a new ten-storey residential tower at 120 James Avenue featuring 71 units. This infill development, totaling 87 residential units, respectfully integrates modern housing into the protected warehouse context, enhancing density and vitality in this nationally significant heritage area. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive
Permits: 120 James Ave | 128 James Ave #25-153444 DP-2025-11-04: Development Permit application for a proposed addition of 4 new floors a top of the existing building at 128 James Avenue and a new 10-story addition located at 120 James Ave which includes a rooftop patio and 23 parking stalls. Combined the building will have 95 multi-family dwelling units, 3 commercial rental units and tenant amenities.


Maws Garage & Sanford Building
Location: 291 Bannatyne Ave
Developer: RIDGIX Building Solutions Inc
Architect: Northern Sky Architecture Inc
Status: In development
Documents: Appeal-June 11, 2025 | Heritage Permit Application | Historical Reports for Buildings
Project Thread
Media:Description: The historic Maw's Garage (built in 1907) and the attached Sanford Building (a one-storey remnant of an 1890 four-storey structure damaged by fire in the 1940s) at 291 Bannatyne Avenue in the Exchange District are set for redevelopment into a nine-storey residential addition atop the existing heritage buildings, creating 114 new housing units, as announced by CentreVenture Development Corporation. The project preserves key heritage elements, including the original foundation and structural framing of both buildings (with refurbishment and reinforcement of steel trusses over Maw's Garage for life safety compliance in the commercial space below), while adding significant density through a new upper structure supported on independent micro piles to avoid loading the historic fabric. Ground-level enhancements include redeveloping the main floor of Maw's Garage into two new commercial retail units (CRUs) and 36 automated parking stalls, converting the Sanford Building's main floor into a new CRU space, lobby entry, elevators, and support areas, plus new facades on both sides of Maw's Garage. This project is a recipient of the Housing Accelerator Fund Capital Grant Incentive & the Gail Parvin Hammerquist Fund City-wide Heritage Program.
Permits:


200 Portage Ave.
Location: 200 Portage Ave
Developer: 200 Portage INC.
Status: Completed Winter 2026
Renderings & Construction pics
Media: Helical piles integral for installation of new elevator in iconic Winnipeg building-Piling Canada
Description: Landlord has comprehensive plan to completely renovate 200 Portage, including the main floor and concourse space, redevelopment plans include upgraded floor to ceiling windows giving unprecedented 360° views of Portage and Main and flooding office spaces with natural light. Other upgrades include new curtain wall, doors, lobbies and elevators which will be replaced or upgraded.
Permits:



The Bond Redux
Location: 151 William Stephenson Way
Developers: -
Architect: 5468796 Architecture Inc
Status: Development permit
Documents: Proposed Agreement for Services – Land Drainage Works - – February 3, 2025
Media: Its name is Bond…Bond Redux-Winnipeg Free Press
Project Thread: Winnipeg | 151 William Stephenson Way | The Bond Redux | In Development
Description: Bond Redux, a proposed seven-storey mass timber mixed-use development by acclaimed Winnipeg firm 5468796 Architecture at 151 William Stephenson Way—a long-vacant, narrow site amid downtown's surface parking lots east of Portage and Main—revives a challenging parcel with a net-zero carbon design featuring a distinctive diagrid structure for wind resistance. The innovative project allocates its first two floors to hybrid office space, including the firm's own studio and facilities supporting two affordable housing agencies, while the upper levels offer 24 residential units, with 30% designated as affordable, aiming to spark broader neighbourhood revitalization through sustainable urban infill.
Permits: #24-158076 DP-2025-04-15, Permit. Development permit to construct a seven-storey mixed-use commercial and residential building (24 dwelling units).


Church of the Cross seniors residence
Location: 560 Arlington Street
Developers: Arms of the Cross Housing Inc
Architect: 5468796 Architecture Inc | Shared Ground
Status: In development
Documents: -
Media: Emotional day for all: church donates building to create affordable housing-Winnipeg Free Press
Description: The Lutheran Church of the Cross in Winnipeg, founded in 1906 and located on Arlington Street since 1965, held its final service on Sunday, June 29, 2025, after donating its building to be converted into affordable housing for seniors. The congregation, which had dwindled to 20-30 members from over 400, decided to repurpose the building to address the communitys housing needs. The project aims to provide affordable living spaces, aligning with the churchs mission to serve the community, the plan is to convert the large high-ceilinged sanctuary of Church of the Cross into two floors, adding new windows on both sides. As many as 39 bachelor and one-bedroom apartments for seniors will be created in the space, which could open in 2026 or 2027 if plans are approved and government funding is secured.
Permits:


Westworth United Church seniors residence
Location: 1750 Grosvenor Avenue
Developers: Westworth United Church
Architect: 5468796 Architecture Inc | Shared Ground
Status: In development
Documents: -
Media:
Description: Westworth United Church, situated at 1750 Grosvenor Avenue in Winnipeg, is a vibrant and inclusive congregation dedicated to celebrating Christian faith through meaningful worship and inspiring music. The church fosters a diverse, multigenerational community that actively promotes social and ecological justice. With a vision to create a community hub in River Heights, Westworth plans to replace its existing gymnasium with a new building featuring up to 30 affordable seniors housing units and a daycare, enhancing its commitment to serving and uplifting the local community.
Permits:


Life Transformation Centre
Location: 83 Kate St.
Developer: Adult & Teen Challenge of Central Canada
Architect: 5468796 Architecture Inc
Status: Development Permit
Documents: Variance-December 24, 2021 | Variance-December 18, 2024 | Conditional Use-December 18, 2024
Media:Project post
Description: The Life Transformation Centre will offer a downtown Winnipeg recovery campus that provides a full continuum of addiction treatment and recovery services under one roof. This mixed-use transitional housing project will turn the top four floors of its six-storey headquarters into a 100 bed recovery facility, with 18 aftercare apartment suites (30 beds) and 70 program beds, providing recovery programming, community connection, and gathering opportunities under one roof. An estimated $18 million will be required for the expansion. This development is a recipient of the Affordable Housing Now program.
Permits: #24-188865 DP-2025-10-02: Permit. HOUSING ACCELERATOR FUND - Adult Teen Challenge - Development Permit Application for a proposed 6 storey 4,936.4 sq. ft. addition and the maintenance of a 8,135.6 sq. ft. 6th floor addition to an existing building and a Change of Use to establish a Neighbourhood Rehabilitation Home Use with 70 care beds, a 18 unit Multi-Family Dwelling Use and a 2,085 sq. ft. accessory Office Use. Work to include alterations to the existing parking area, a garbage enclosure, a landing, a private outdoor picnic and playground area, secure bicycle parking spaces, fencing, mechanical units and screening and exterior lighting.



401 Waterfront Dr
Location: 401 Waterfront Dr
Developer:
Architect:
Status: In development
Documents: CentreVenture Development Corporation 2024 Annual Report
Media:
Description: CentreVenture has been working diligently to find a suitable project for a small city-owned property at the corner of Waterfront and Heaton Avenue. After marketing this property for nearly a decade, an exciting offer was accepted in 2023 by the same group that constructed œThe Bend at 90 Alexander Avenue. This proposed new project will bring a townhome-style development with 24 rental residential units, six of which will be affordable, to the street. Closing is anticipated in 2025. This is one more project along Waterfront Drive that contributes to the transformation that was envisioned in 2004 when this landmark area was designed.


Winnipeg Hotel (Heritage restoration)
Location: 214 Main St
Developer: John Pollard
Architect:
Status: In development
Media:Renderings
Description: The hotel at 214 Main St. opened in 1881, it was purchased by a holding company fronted by John Pollard, co-chief executive officer of Pollard Banknote Ltd, plans are to refurbish the building and redevelop it into a boutique hotel. Pollard anticipates it could take as long as three years to complete the renovations on the Winnipeg Hotel.
Permits: #21-206986 PE-2021-09-20, Alter Exterior. Landlord work to demolish portion of front exterior non heritage cladding to 3D scan existing heritage facade. This includes removing mosaic tiles, stone dash coat, and glass blocks


128 River Avenue
Location: 128 River Avenue
Developer:
Architect: ft3 Architecture Landscape Interior Design
Status: Development permit
Documents: Variance-February 24, 2025
Media: -
Renderings
Description: 6 storey residential building with 19 units.
Permits: #25-104096 DP-2025-05-14, Permit. Development permit for a 6 storey 19-unit multi-family dwelling with 4 affordable suites.


51RR
Location: 51 Roslyn Rd, Winnipeg, MB
Developer: Atlas Acceptance Corporation Ltd
Architect: h5 Architecture
Status: U/C
Documents: Media: Vacant block that poses fire hazard approved for quick demolition-Winnipeg Free Press
Project Thread: 51 Roslyn Rd
Description: The developer is constructimg a six-storey, 66-unit residential building on Roslyn Rd. in Osborne Village, featuring 51 underground parking spaces in a two-level parkade and a car-share vehicle. The building design includes active ground-level uses, such as a lobby and glazed stairwells, to screen parking, along with secure indoor storage for 19 bicycles and 12 visitor bike spaces. The structure aligns with the areas built form, with a varied façade featuring projections, recesses, and a fifth-storey step-back for a street-facing roof deck. High-quality materials like brick, dry-vit terra neo stucco (similar to stone terrazzo) and polished aluminum are used, with balconies and perforated metal screens enhancing articulations. An accessible pedestrian pathway connects Roslyn Rd. to a rear outdoor amenity area, and a front yard seating area is included, with efforts to enhance both the street and riverfront aesthetics.
Permits: #25-207078 MU, 2025-10-09: Construct New. "Concurrent Building Permit Review submission", Related DP: 25-104176 DP. Construct new 7033 m², 6-storey, 66 unit multi-family residential building. Basement level and main floor to include interior parkade. Work includes riverbank stabilization.


Main Street Project Inc.
Location: 637 Main St.
Developer: Main Street Project
Architect: -
Status: In Development
Documents: -
Media: Federal cash boosts key inner-city housing projects-Winnipeg Free Press
Description: With 111 units, all of which are rent geared to income, this project aims to address homelessness in the community by transforming Main Street Project's existing emergency shelter into a multi-purpose facility with affordable housing, communal spaces, and on-site support services. Main Street Project received $2.5 million from the Housing Accelerator Fund Capital Grant Incentive and tax increment financing. It hopes to use the money to finance a three-storey addition to its emergency shelter, The project is expected to cost approximately $30 million. The Winnipeg Foundation has committed financial support, and additional funding is expected from the provincial and federal governments.
Permits: 25-215302 DP-2025-12-18, Permit. HOUSING ACCELERATOR FUND - Main Street Project - Development Permit application for the renovation of an existing one-storey commercial building and the addition of three stories atop of the existing building resulting in a total of four-storey building with a lower level. The work includes stripping the building back to the existing structure in order to replace the existing building envelope with modifications to the mechanical and electrical systems.


440 Edmonton St.
Location: 440 Edmonton St.
Developers: UWCRC 2.0 Inc. & 10162513 Manitoba Ltd.
Architect: -
Status: U/C
Documents: -
Media: Former Parkview Place redevelopment among 11 Winnipeg projects receiving housing funding-CBC News Manitoba
Description: This project will convert a vacant 13-story commercial building into a residential complex with 180 affordable self-contained residential dwelling units, a Daycaree, a School, and Office. This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive.

Permits: #25-153616 MU-2025-09-15: Interior and Exterior Alterations. Affordable Housing Support. Smart Living Ltd. Landlord work. Multi-story, multi-tenant building. Existing 13 story building. Change of use to allow for the establishment of 180 affordable self-contained residential dwelling units, a 4,200 sq. ft. Daycare Use, a 5,790 sq. ft. School Use, an 2,290 sq. ft. Office Use, along with accessory uses for parking, loading and refuse collection. Full retro-fit of building. Structural, mechanical, electrical and plumbing work to be done.


Queer Village Housing Development
Location: 927 Notre Dame Ave
Developers: 2Spirit Manitoba | Sunshine House
Architect: Brook McIlroy
Status: U/C
Documents: Subdivision and Rezoning | Variance September 5, 2024
Media: Description: This first-of-its-kind in Manitoba development, led in partnership by 2Spirit Manitoba and Sunshine House, a new 4-storey commercial mixed-use multi-family building on existing surface parking lot will consist of 11 shelter beds, 14 transitional housing units, and seven social housing units with onsite wrap-around supports. The development will include a communal kitchen, gathering spaces, ceremony room, office/counselling spaces, medical room, and an outdoor medicine garden. Onsite supports will be provided by 2Spirit Manitoba and Sunshine House, with capacity building support from Siloam Mission and UWCRC 2.0. This development is a recipient of the Affordable Housing Now program.
Permits: #25-127933 DP-2025-05-28, Permit. Development permit for a 2100 sq.ft. 4-storey New transitional 21-unit affordable housing dwelling | #25-171490 MU-2025-06-27, Partial Permit-Foundation. Partial Foundation Permit


566 Bannatyne Ave
Location: 566 Bannatyne Ave
Developer: Sunshine House Inc.
Architect: Brook McIlroy
Status: Completed
Documents: Conditional Use: 25-131191/C-March 20, 2025
Media:
Description: The applicant proposing to convert and use the existing building, the former Ronald McDonald House as a care home for 15-18 individuals with an accessory 2,258 square foot Social Service Facility Use to allow for safe, affordable housing with wrap around support services for 2SLGBTQQIA+ individuals leaving encampments in Winnipeg.
Permits: #25-131948 TA-2025-03-21,Change of Use. Affordable Housing Support - Sunshine House Inc. - Emergency shelter to begin operations starting March 24, 2025 to May 24, 2026/


The McLaren House
Location: 554 Main Street, Winnipeg, MB
Developer: Rubi Gill | The Equal Housing Initiative
Architect: Verne Reimer (Tower) | Brook McIlroy (Heritage building)
Status: In Development
Media: Renderings
Description: As part of the renovations to the historic McLaren Hotel a new 12-storey mixed use residential building is proposed. Plans are to have one-third of the 108 suites designated as affordable housing. Equal Housing Initiative will begin a $12-million retrofit of the McLaren Hotel, The retrofit will be separated into three stages ” two floors at a time.
Permits:



Global Agriculture Technology Exchange (Gate)
Location: Westbrook St
Developers: Cereals Canada
Architect:
Status: In Development
Documents: -
Media:Project Thread
Description: Cereals Canada is advancing its visionary $102-million Global Agriculture Technology Exchange (GATE) facility, a state-of-the-art hub set for construction in downtown Winnipeg's historic Exchange District at the corner of Lombard Avenue and Westbrook Street—on land contributed in-kind by James Richardson & Sons, Limited—with groundbreaking anticipated in the near term and completion targeted for 2027. Designed to strengthen Canada's position as a premier exporter of high-quality wheat and other cereals amid global trade volatility, GATE will feature advanced research laboratories, including specialized spaces for baking, pasta production, and a grain mill capable of replicating international processes, far surpassing the limitations of the organization's current downtown offices. Supported by provincial funding, grower commitments, and international partners such as UK-based Warburtons, the project underscores a strategic focus on market diversification, innovation, and technical expertise to sustain long-term competitiveness in the global grain industry.


1131 Nairn Ave.
Location: 1131 Nairn Ave.
Developer: Progressive Real Estate Group
Architect: Affinity Architecture Inc
Status: U/C
Documents: Rezoning-April 8, 2024 | Variance – January 5, 2026
Media: Mixed-use rezoning on Nairn approved-Winnipeg Free Press
Renderings
Description: Proposed is a six story mixed use building. The building will encompass 99 residential units and commercial units on the ground floor.
Permits: #25-127163 MU-2025-08-18, Construct New. Construct new 6 storey, 123,864 ft² (99 units multi-family dwelling and 3 SHELL ONLY units retail sales CRU) mixed-used building.


600 River Ave Apartments
Location: 90 Wellington Cres
Developer: Progressive Real Estate Group
Architect: Affinity Architecture Inc
Status: U/C
Documents: Subdivision and Rezoning-April 25, 2023 | Variance-April 25, 2023
Media: Affordable, supportive housing proposed for Osborne Village-Winnipeg Free Press
Renderings
Description: The development is planned to include a 4 storey, 51 unit residential development, composed of two buildings. A third floor walkway will span the rear public lane, connecting the two new buildings. 20 units in the development are proposed to provide supported housing. The development will contain an onsite kitchen to serve the needs of those living in the supported housing.
Permits: 90 Wellington-Demolish, 586 River Ave-Demolish, 588 River Ave-Demolish
#24-142123 DP-2024-09-16, Permit. 600 River Ave. - Development permit for Construction of 8,772 square feet four storey, 40-unit multifamily building with accessory underground parking. 580 River Avenue - Development permit for Construction of 3,392 square feet four storey, 10-unit multifamily building with accessory covered surface parking. Scope of work also includes third-floor walkway over the public lane to connect both buildings, landscaping and associated site work.


670 McMillan Avenue
Location: 670 McMillan Avenue
Developer: Paragon Living
Architect: Affinity Architecture Inc
Status: Development permit
Documents: McMillan Avenue Redevelopment May 5th, 2021 | Subdivision and Rezoning-September 5, 2024 | Variance-September 5, 2024
Renderings
Media:
Description: A proposed four-storey rental apartment building by Paragon Living at 670 McMillan Avenue in Winnipeg's desirable Crescentwood neighbourhood—tapering to three storeys along the eastern façade for sensitive integration with adjacent properties—will deliver 40 modern residential units complemented by underground parking and additional lane-accessed stalls. This infill development enhances housing options in a vibrant, walkable area just steps from Corydon Avenue's renowned dining and community amenities, blending contemporary design with thoughtful neighbourhood scale
Permits: #25-178358 DP-2025-09-05-Development permit for a 4 storey apartment building with 45 units.


65 Kirkbridge
Location: 65 Kirkbridge Drive
Developer: Paragon Living | Thorwin Properties
Architect: -
Status: U/C
Documents: -
Media: -
Description: A 7 storey, 78 residential unit rental building with underground parking.
Permits: #24-148938 MU-2024-07-19, Construct New. Construct a 6 storey, 69,102 ft², 65 units new multi-family residential building. #25-148682 MU-2025-06-03, Construct Addition. Thorwin Properties - Construct a new 7th floor addition (898 m²) to an existing 6-storey apartment building (65 units), adding 13 residential units.


The Chancellor
Location: 939 Chancellor Drive
Developer: Paragon Living | Roseau River Anishanabe First Nation
Architect: Affinity Architecture Inc.
Status: Completed-Fall 2025
Documents:Media: Roseau River members to get first dibs on affordable units near U of M-Winnipeg Free Press
Description: Constructed is a 7-storey, 95-unit apartment building in Winnipeg, designed for First Nations students attending the University of Manitoba, will feature 40% affordable units priced at less than 80% of the median market rent. The building, reaching a height of 76 feet, will include a mix of studio, one-bedroom, and two-bedroom units, with its main entrance connected to Chancellor Drive via a walkway. Vehicular access will be provided through a bidirectional approach from Gaylene Place, with 60 parking stalls (25 underground and 35 surface) and 18 indoor bicycle parking spaces located in the underground parking area.
Permits: #23-228348 MU-2023-11-23, Construct New. Optional Professional Certification Program Permit. Construct new 7 storeys, 95 units, 94,821 sqft. multi-family dwelling with underground parkade. This development is a recipient of the Affordable Housing Now program.



126 Sherbrook St
Location: 126 Sherbrook Street
Developer: Paragon Living
Architect: Affinity Architecture Inc.
Status: In development
Documents: Subdivision and Rezoning April 4, 2024 | Variance April 4, 2024
Media: Community groups line up against proposed Sherbrook development-Winnipeg Free Press
Renderings
Description: A mixed use development with 102 dwelling units and 7 individual commercial spaces on the ground floor.
Permits:


2675 Portage Ave
Location: 2675 Portage Ave
Developer: Shoal Lake 40 First Nation | Paragon Design Build
Architect: Affinity Architecture Inc.
Status: Partial Permit-Foundation
Documents:Media: RNR Restaurant (Formerly Perkins) on Portage Avenue Closes to Become Apartments-Access Winnipeg
Description: A proposed seven-storey mixed-use development led by Shoal Lake 40 First Nation at 2675 Portage Avenue in Winnipeg's St. James neighbourhood—on the former site of a long-standing restaurant—will deliver approximately 150 residential units, with around 40% designated as affordable to support community members and broader residents. The project includes one ground-level commercial unit, transforming a prominent Portage Avenue corner into a vibrant hub that enhances housing options, promotes affordability, and contributes to sustainable urban growth along this key corridor.
This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive & this development is a recipient of the Affordable Housing Now program.
Permits: 25-181757 DP-2025-08-21, Permit. Housing Affordability Fund - Development permit for the seven storey apartment building with 150 residential units and 752 sq. ft. of commercial space on the main floor.


Bridge Lake Drive
Location: Bridge Lake Drive
Developer: Paragon Living
Architect: Affinity Architecture Inc.
Status: In development
Documents: Subdivision and Rezoning & Variance - November 20, 2025
Media:
Renderings
Description: Manitoba Housing and Renewal Corporation is selling a large parcel of land to developer Paragon Living, which plans to split it into two new lots and build a pair of seven-storey apartment buildings near Bridge Lake Drive. The first new lot will cover about 2.1 acres and hold a 72-foot-tall building with 246 homes “ 101 of them affordable and the rest at regular market prices. It will have 216 car parking spaces (slightly fewer than required, with a separate request to allow the reduction) plus 15 visitor spots and 137 bike parking spaces, most of them indoors and secure. The second lot will be roughly 1.9 acres and also feature a seven-storey, 72-foot building containing 204 apartments “ 84 affordable and 120 market-rate units. This building will offer 197 car parking spaces (a few more than required), 18 visitor spaces, and 163 bike parking spaces, again mostly indoors. Both buildings will be reached by driveways off Bridge Lake Drive, with no direct access planned from Kenaston Boulevard or South Town Road. The project also changes the zoning to allow larger multi-family buildings on the site. Once the buildings reach construction phase, Opaskwayak Cree Nation (OCN) and Marcel Colomb First Nation (MCN) will each take ownership of one of the completed properties.


1510 Main Street
Location: 1510 Main Street
Developer: Inuka Community Inc.
Architect: Affinity Architecture Inc.
Status: U/C
Documents:Media: Affordable apartments on Main Street clear first hurdle-Winnipeg Free Press
Description: 1510 Main Street, a groundbreaking seven-storey energy-efficient apartment building at 1510 Main Street in north Winnipeg, spearheaded by Black- and women-led non-profit developer Inuka Community Inc.—whose name means "to rise" in Swahili—delivers 72 mixed-income rental units (30 one-bedroom, 30 two-bedroom, and 12 three-bedroom suites), with approximately 40% deeply affordable and heavily discounted rents prioritized for Black newcomers and equity-seeking groups. Featuring modern masonry, stucco, and corrugated metal cladding, the project includes on-site tenant support services to aid residents in thriving, alongside pre-tenancy programs for financial coaching and stability, marking a significant step in community-owned housing and pathways to homeownership for underrepresented communities. This development is a recipient of the Affordable Housing Now program.
Permits: #24-199748 MU“2024-10-25, Construct New. Construct a 7 storey, 75500 sqft multi-family dwelling building, with 72 units.


97-105 St. Annes Road
Location: 97-105 St. Annes Road
Developer:
Architect: Affinity Architecture Inc.
Status: In development
Documents:Media:
Description: The developer plans to demolish existing structures and build a six-storey mixed-use building with two ground-floor commercial units (750 and 1,059 square feet) and 45 residential units above. It will include 32 parking spaces (with two accessible spaces and one car-share vehicle), 10 indoor and 15 outdoor bicycle parking spaces, five new trees, one preserved tree, and 35 shrubs. Access to the site and garbage pickup will be via a rear public lane, with a 6-foot-tall fence proposed along the property line next to the lane.


391, 397 & 401 Provencher Boulevard
Location: 391, 397 & 401 Provencher Boulevard
Developer:
Architect: Affinity Architecture Inc.
Status: In development
Documents: March 20, 2025 - Stakeholder Presentation | Subdivision and Rezoning-October 29, 2025
Media:
Description: A 6-storey mixed-use building with commercial unit at grade and 45 dwelling units


1269 St. Annes Road
Location: 1269 St. Annes Road
Developer: Progressive Real Estate Group.
Architect: Affinity Architecture
Status: In development
Documents: Plan Approval-January 8, 2025 | Submitted Plans
Media:
Description: Proposed are two buildings on site. Building one is a five storey œL-shaped mixed use building comprised of 8 commercial units at grade and 102 dwelling units above. Building two is a two-storey commercial building comprised of 3 commercial units.


Gurdwara Kalgidhar Darbar Sikh Temple
Location: 2762 and 2788 King Edward Street
Developer: Gurdwara Kalgidhar Darbar Inc.
Architect: Affinity Architecture Inc.
Status: In development
Documents: Plan Approval-January 7, 2025 | Submitted Plans
Media: City committee approves new Sikh temple for northwest Winnipeg-CBC News Manitoba
Description: The applicant is proposing to construct a new 21,172 square foot Sikh Temple on the existing place of worship site, to serve as the primary gathering space. The existing 7,832 square foot building will be maintained for supporting uses. The proposed building will be three storeys, 36 feet in height to the parapet, with three onion domes.


LeParc I & II
Location: 3280/ 3290 Pembina Highway
Developer:
Architect: Affinity Architecture Inc.
Status: In development
Documents:
Media:
Description: Standing at the threshold St. Norbert, Manitoba this 2 phase luxury condominium development boasts spacious layouts and river views for the majority of its suites. Each phase features 5 residential floors, and 33 suites, along with 2 levels of below grade parking.


Post Street Estates
Location: 25-55 Post Street
Developer: Paragon Living
Architect: Affinity Architecture Inc.
Status: U/C
Documents: Plan Approval-June 21, 2024 | Submitted Plans
Media: Engagement builds Whyte Ridge growth-Winnipeg Free Press
Description: This project reconciles the contrast between an existing single-family residential area and a large-scale retail site by introducing a 7-storey apartment building and multiple 3-storey stacked townhouses to harmonize these differing land uses. The development will include 280 dwelling units, with 228 units in a seven-storey multi-family building positioned at the front of the property and 52 units in three separate three-storey stacked townhouses situated at the rear.
Permits: #24-222154 MU-2024-11-19, Construct New. Construct a 7-storey (plus 1 underground parkade) multi-family 228 residential units and indoor parking apartment complex building and three 3-storey (plus 1 below ground residential) townhouse buildings (contains 52 units).
  • 25 Post Street
  • 55 Post Street


1811 John Brebeuf
Location: 1811 John Brebeuf Place
Developer: Paragon Living
Architect: Affinity Architecture Inc.
Status: U/C
Documents: Appeal - Variance-October 23, 2024
Media: River Heights residents say 40-unit townhouse complex raises traffic, noise concerns-CBC News
Description: This boutique collection of three 3-storey townhouses has a total of 40 dwelling units located on a decommissioned railway corridor east of Kenaston Boulevard in River Heights.
Permits: 25-170025 DP-2025-10-16: Permit. Development permit for the construction of 3 buildings. One 16 unit building and two 12 unit buildings. Each building is four storeys. The development will feature landscaped areas and the parking lot will be finished with asphalt.


Tuxedo Heights North & South
Location: 669, 645, 655, and 639 Sterling Lyon Parkway
Developer: Paragon Design Build | Forster Harvard Development Corp.
Architect: Affinity Architecture Inc
Status: In development
Documents: Subdivision and Rezoning-January 7, 2025 | Variance-January 7, 2025
Media:Project post-renderings
Description: The applicant is proposing to rezone and subdivide four properties located in the parking lot of the outlet mall into five separate lots. Two of these—Lots 2 and 4—would be dedicated to multi-family residential development and collectively accommodate a total of 439 dwelling units. Lot 2, covering roughly 2.7 acres, would be rezoned to the CMU (Commercial Mixed Use) district. It would feature a seven-storey residential building positioned at the northeast corner of two proposed private streets, with a maximum height of approximately 71 feet. The structure would contain 255 dwelling units in a mix of one-, two-, and three-bedroom configurations, supported by 298 on-site parking stalls. Similarly, Lot 4, encompassing about 1.7 acres and also rezoned to CMU, would host a seven-storey building at the southeast corner of the same two private streets, reaching a comparable height of around 71 feet. This building would include 184 units—again offering a combination of one-, two-, and three-bedroom layouts—along with 185 dedicated on-site parking spaces.
Permits:
  • Tuxedo Heights South (2028)
  • Tuxedo Heights North (2029)


Tuxedo Heights East & West
Location: 457 Sterling Lyon Parkway
Developer: Paragon Design Build | Forster Harvard Development Corp.
Architect: Affinity Architecture Inc
Status: In development
Documents: Variance-September 4, 2024 | Subdivision and Rezoning-September 4, 2024
Media:
Project post-renderings
Description:The rezoning application for the east side property along Sterling Lyon Parkway has been successfully approved. Construction has now started on the project, which involves subdividing the site into two lots—Lot 1 and Lot 2—while Lot 1 has been rezoned to the CMU (Commercial Mixed Use) district to support multi-family residential development.Lot 1, covering approximately 1.5 acres, now features a seven-storey building with a maximum height of 74.6 feet. The structure contains 162 dwelling units, offering a diverse mix of one-, two-, and three-bedroom layouts, supported by 121 on-site parking stalls—including 44 underground spaces. Access to the site continues via the existing private street approach from the west, with shared circulation between the lots facilitated by a cross-access agreement. No new access points directly from Sterling Lyon Parkway have been introduced. Complementing this development, the west side of the road—already zoned CMU—is seeing construction of a twin seven-storey building, furthering the mixed-use character envisioned for the corridor
Permits:
Permits: 25-190359 DP 2025-10-16, Permit. Development permit application for the construction of a7-storey residential building containing a total of 162 dwelling units
  • Tuxedo Heights West (2027)

Location: 615 Sterling Lyon Parkway
Status: In Development
Documents: Plan Approval – January 26, 2026 | Submitted Plans | Submission
Permits:


444 Grassie Boulevard
Location: 444 Grassie Boulevard
Developer: Alia Custom Homes Inc.
Architect: Affinity Architecture Inc
Status: In development
Documents: Secondary Plan Amendment-June 23, 2025 | Rezoning-June 23, 2025 | Variance-June 23, 2025
Media:
Description: The applicant seeks to rezone a property to the RMF-M Residential Multi-Family (Medium) District to develop a three-story, 16-unit multi-family building. The proposed site plan includes balconies and entrances on the east and west facades, access from Grassie Boulevard, parking and a drive-aisle along the west and south sides, and a garbage enclosure near Grassie Boulevard at the north end of the site.
Permits:


448 Grassie Townhouses
Location: 470 Grassie Boulevard
Developer:
Architect: Affinity Architecture Inc
Status: In development
Documents: Subdivision & Rezoning-June 23, 2025 | Variance-June 23, 2025
Media:
Description: The applicant proposes to subdivide and rezone a property to create two RMF-M Residential Multi-Family (Medium) District lots for multi-family development and extend Williamson Crescent to connect with Grassie Boulevard. The site plan includes three multi-family buildings. Proposed Lot 1 (southerly) will have one 16-unit, three-story townhouse building with balconies and entrances on the north façade, accessed via the extended Williamson Crescent, with parking, a drive-aisle, and a garbage enclosure at the south. Proposed Lot 2 (northerly) will feature two three-story townhouse buildings: one parallel to Grassie Boulevard with balconies and entrances on the north and south facade, and another at the southeast corner fronting Williamson Crescent with balconies and entrances on the east and west façades. Both buildings on Lot 2 will share central parking, a drive-aisle, and a garbage enclosure, accessed via the extended Williamson Crescent.
Permits:


520 Grassie Apartments & Townhouses
Location: 520 Grassie Boulevard
Developer: Alia Custom Homes Inc.
Architect: Affinity Architecture Inc
Status: In development
Documents: Secondary Plan Amendment-June 23, 2025 | Subdivision & Rezoning-June 23, 2025 | Variance-June 23, 2025
Media:
Description: The applicant seeks to subdivide and rezone properties to create a single RMF-L Residential Multi-Family (Large) District lot for a multi-family development featuring six buildings. Building 1, located at the northwest corner along Grassie Boulevard, will be six stories tall with 70 units, while Building 2, along the eastern side, will be seven stories with 132 units. Both will have balconies, entrances, and structured parking access. Buildings 3 through 6, situated centrally and southward, will each be three stories with 20 units and balconies. The development includes surface and indoor parking, with garbage enclosures at the southern end, accessible via an internal drive aisle.
Permits:


1918 SMR - Phase 1
Location: 1918 St. Mary's Road
Developer: Carrington Real Estate
Architect: Verne Reimer Architecture
Status: U/C
Documents: Plan Approval - April 24, 2023 | Submitted Plans
Media: Multi-family development on St. Marys gets OKWinnipeg Free Press
Renderings
Description: Proposed are two multi-family residential buildings, one eight-storey building containing 168 units (1918 SMR-phase 1) and one six-storey building containing 102 units (1920 SMR-Phase 2).
Permits: #22-223734 MU-2024-05-06, Construct New. Construct, 8 storey, 190980 sqft, multi-family dwelling building, with 164 units.


1920 SMR - Phase 2
Location: 1920 St. Mary's Road
Developer: Carrington Real Estate
Architect: Verne Reimer Architecture
Status: U/C
Documents: Plan Approval-April 24, 2023 | Submitted Plans
Media: Multi-family development on St. Marys gets OK-Winnipeg Free Press
Renderings
Description: Proposed are two multi-family residential buildings, one eight-storey building containing 168 units (1918 SMR) and one six-storey building containing 102 units (1920 SMR).


Dumoulin Apartments
Location: 158-160 Dumoulin Str
Developer: 10173049 MANITOBA LTD.
Architect: Verne Reimer Architecture
Status: U/C
Documents: Design Review - February 21, 2025 | Submitted Plans
Media:
Description: 6-storey multi-family residential building encompassing 20 self-contained units and 8 single room occupancy units. The 8 single room occupancy units will be located on the second floor and have access to a shared kitchen/lounge room.
Permits: #25-178005 MU-2025-12-15, Construct New. Concurrent Development Permit Review - Construct a 6-storey, 24323 ft², 32-unit multi-family residential building with 18 indoor parking stalls


Ka Ni Kanichihk Expansion
Location: 455 McDermot Ave
Developer: Ka Ni Kanichihk Inc.
Architect: Verne Reimer Architecture Incorporated
Status: Completed - Fall 2025
Documents: Variance-22-200744/C-August 30, 2022 | Permanent sweat lodge structure-February 5, 2025
Media:Description: The applicant is proposing an expansion of the day care centre located on the property with a building addition to the northwest of the site. The property is currently known as Ka Ni Kanichihk, a cultural centre and day care centre for indigenous adults and youth. The new addition is proposed to have two-storeys, a footprint of 6,200 square feet. The primary use of the new building will be for the expansion of the day care centre on site, as well as a small office for administrative use.
Permits: #23-197501 EH-2023-09-21, Construct Addition. Ka Ni Kanichihk Inc. - Construct a two-storey addition (1578.1 sq meter) to existing one-storey Indigenous Cultural Centre and Daycare building. The scope of work also includes demolition and site removals. Structural, mechanical and electrical work being done.




36 Roslyn Road
Location: 36 Roslyn Road
Developer: 6571574 MANITOBA LTD.
Architect: Verne Reimer Architecture
Status: In development
Documents: Rezoning & Variance - November 24, 2025 | Appeal – Variance – January 14, 2026
Media:
Renderings
Description: A new eight-storey apartment building with 72 units is proposed for the vacant lot at the southwest corner of Roslyn Road and Bryce Street in Winnipegs Osborne Village. The modern building will feature Tyndall stone and brick on the outside, a rooftop patio, and a welcoming main entrance at the corner with big floor-to-ceiling windows facing both streets. It will sit right at the sidewalk with no front or corner setbacks (except a small 2-foot step-back on part of Bryce Street), 5 feet from the neighbouring property on the west side, and tight to the back lane.The project includes 21 vehicle parking spaces (six of them accessible) in covered parking on the ground floor, plus a generous 52 secure indoor bike parking spots and a garbage enclosure at the rear southwest corner. While no trees are planned, the landscaping will include 44 shrubs. The development is designed to fit the high-density residential vision for Osborne Village and the citys Complete Communities guidelines for mature neighbourhoods.


The Mayfair
Location: 109 Mayfair
Developer: WRE Developments
Architect: Otto Cheng Architect Incorporated
Status: Completed Winter 2026
Documents: Subdivision and Rezoning – November 5, 2019
Project Thread: 109 Mayfair
Description: WRE Developments is constructing a 15-storey, 96 unit residential apartment building located at 109 Mayfair across from downtown along the Assiniboine River.
Permits: #22-142534 MU-2024-04-29, Construct New. Construct a 15 storey, 181458 sqft Residential building, with 96 Residential units, and underground parkade. The Main, 2nd & 3rd floors are also parkades.



Hyatt Centric Winnipeg Downtown
Location: 325 Broadway
Developer: Kothari Group
Architect: Otto Cheng Architect Incorporated
Status: Under construction
Documents: HEDI program June 12, 2023
Media:
Western Canadas first Hyatt Centric hotel to open on Broadway-Winnipeg Free Press
Hyatt Centric expands in Canada with new properties in Victoria and Winnipeg-STAY
Project post
Description: A vacant six-story building at 325 Broadway will be converted into a 140-room Hyatt Centric hotel, the first of the Hyatt Centric brand in Western Canada. The modern, upscale property will host a wealth of amenities including a dramatic atrium, a restaurant, lounge and coffee shop and a spa and a fitness centre. This upscale lifestyle hotel is slated to open in Spring 2026.

Permits: #24-114524 PE-2024-05-13, Construct Addition. Hyatt Centric Winnipeg - Interior and exterior alterations to convert office building into hotel. All floors to be converted with basement with amenities/staff space and future spa space, main floor for lobby with interior parkade and restaurant, 2nd to 6th floor for guest rooms, and new addition on rooftop to consist of stairwells and lobby leading out to bar / patio space. New atrium space from main floor to roof with rooftop skylight to be constructed in the middle of building. Exterior work includes sitework, new patio space on front of building wrapping around to the side of restaurant space, new structural canopy on the side and front of building, and new windows and facade.


Lee & Waverly Lot 3 Mixed-Use
Location: Southwest Corner Lee Boulevard & Waverley Street
Developer: Irwin Homes Ltd.
Architect: Otto Cheng Architect Incorporated (OCAI)
Status: In development
Documents: [/B] Variance-May 26, 2025
Media:
Description:In phase 1 of the new neighborhood Bison Run plans are to construct a six-story mixed-use building featuring commercial and residential spaces. The ground floor will house eight commercial units, ranging from 2,172 to 2,940 square feet, accessible from Lee Boulevard or the interior parking area. The upper floors will contain 80 residential units, including a mix of one-, two-, and three-bedroom apartments. The building will reach a height of 60 feet to the roof parapet. Parking provisions include 152 stalls, with 98 underground and 54 surface spaces.
Permits


Lee & Waverly Lot 2 Apartments
Location: Southeast Corner for Lee Boulevard and Frontier Trail
Developer: Irwin Homes Ltd.
Architect: Otto Cheng Architect Incorporated (OCAI)
Status: In development
Documents: [/B] Variance-May 26, 2025
Media:
Description: In phase 1 of the new neighborhood Bison Run plans are to construct two separate seven-story multi-family buildings, labeled Building A and Building B, each containing 96 dwelling units, for a combined total of 192 units. These units will consist of a mix of one-, two-, and three-bedroom configurations. The buildings will reach a height of 78.2 feet to the top of the roof parapet, as indicated in the elevation drawings. Additionally, the proposal includes 250 accessory parking stalls, with 160 of these located indoors.
Permits:


St. Mary's Road Multi-Family Development
Location: St. Mary's Road at Redview Drive
Developer: Irwin Homes Ltd
Architect: Otto Cheng Architect Inc.
Status: In development
Documents: Plan Approval- January 3, 2024 | Submitted Plans | Submission
Media:
Description: The applicant proposes constructing a 4-story, 44-unit multi-family residential building in south St. Vital, 50 feet tall at its highest point, with most of the structure at 44 feet. The L-shaped building steps down to 34 feet (3 stories) on the south and northeast corners to reduce massing impacts on a neighboring single-family home to the south and the proposed Redview pathway to the north. The 3-story section on the south aligns with the adjacent dwelling's height and includes a rooftop deck with an 8-foot landscape buffer, as requested by the Urban Planning and Design Division, to minimize views into the neighboring property.
Permits:


Canterbury-2 Multi. Housing
Location: 311 Ravenhurst St
Developer: Novamet Development Corporation
Architect: Otto Cheng Architect Inc.
Status: In development
Documents: Variances-April 11, 2025 | Conditional Use-April 11, 2025
Media:
Description: The applicant plans to develop a site with 3, three-storey townhouse buildings. Buildings 1A and 1B, located on the west side fronting Ravenhurst Street, will be stacked townhouses and feature entrances, balconies, and attached garages with access to an interior parking area on the east facade. Building 2, a townhouse at the southeast corner, will include entrances and balconies on the east facade facing single-family homes, with garages and parking access on the west facade. The proposal complies with Winnipegs landscaping requirements with trees and shrubs along property lines, and features earth bins for garbage collection at the northeast corner.
__________________
Winnipeg Act II - April 2024

Winnipeg Developments

In The Future Every Building Will Be World-Famous For Fifteen Minutes.

Last edited by Wpg_Guy; Mar 3, 2026 at 2:04 AM. Reason: fix DIMS links|385 Henderson|179 McDermot|NACM|RAILSIDE|1820 De Vries Ave|Portage Place
Reply With Quote
     
     
  #2  
Old Posted May 14, 2025, 2:43 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,216
Quote:
Man. There sure is a lot of development going on. It's tough to conceptualize it honestly.
Winnipeg Developments

Post 3 of 3

University of Manitoba’s Master Capital Plan
Location: 65 Chancellors Circle
Developer: University of Manitoba
Architect:
Status: In development
Documents:
Project Post
Media: Building Bold: UM's Capital Plan for People, Place and Possibility
Description: The University of Manitoba has launched Building Bold: UM's Capital Plan for People, Place and Possibility, a comprehensive 30-year master capital plan extending to 2055 that serves as a strategic roadmap for renewing, enhancing, and expanding its campuses. Unveiled in January 2026, the plan addresses major and minor capital projects, learning space modernizations, and a significant backlog of deferred maintenance (estimated at around $600 million) across approximately 3 million square feet of facilities on the Fort Garry and Bannatyne campuses, plus various satellite sites. It aligns closely with UM's MomentUM strategic plan, Truth and Reconciliation Framework, Climate Action Plan (targeting net-zero emissions by 2050, including the university's first zero-carbon building), and Strategic Research Plan. Core guiding principles include advancing academic excellence and student experience, embedding Indigenous design concepts, prioritizing sustainability and accessibility, promoting walkability with green networks and river connections, ensuring safety and belonging, preserving heritage, fostering vibrant community spaces, and practicing responsible stewardship. The plan unfolds in six five-year phases, with tailored visions for each campus. The Fort Garry campus master capital plan sets a roadmap for developing the campus core, emphasizing sustainable core development, walkability, green spaces, and integration with neighboring communities. Key components of the plan include addressing urgent priorities and future needs while supporting UM’s operational, cultural, and community goals; building for sustainability, accessibility, and walkability with green networks, high streets, river nodes, and East and South gateways; and considering impacts on neighbouring communities, including the future Southwood Circle development. Bannatyne campus focuses on coordinated renewal with minimal disruption, an iconic entrance, central quad, and blended healthcare, education, and research ecosystem.


UM’s Master Capital Plan Major Capital Projects - Fort Garry Campus:

Description: New integrated research space for soil, crops, entomology, livestock, and engineering to accelerate sustainable agriculture, field trials, and food security.

  • Dafoe Library Replacement
Description: A modern, inclusive, sustainable facility to replace the aging Elizabeth Dafoe Library, creating outdoor green space and incorporating connectivity, sustainability, and Indigenous design.


The Refinery District (Bishop Grandin Crossing)
Location: Bishop Grandin Boulevard and Newmarket Boulevard, Winnipeg, MB
Developer: Hopewell Development
Cost: $500+-million
Status: U/C
Media: Bishop Grandin Crossing will have it all; $500-M development will tie in with city's rapid transit corridorWinnipeg Free Press
Description: The Refinery District in Winnipeg, built on the former Manitoba Sugar Beet Factory property is a 102-acre mixed-use infill development located in the citys southwest, designed to integrate living, working, and recreational spaces. Situated between Abinojii Mikanah (formerly Bishop Grandin Boulevard) and Newmarket Boulevard, its surrounded by some of Winnipegs fastest-growing and affluent neighborhoods, like Bridgewater Forest, Whyte Ridge, Linden Ridge, and Waverley Heights. The district is a Transit-Oriented Development (TOD), with a designated station on the Southwest Rapid Transit Corridor (Plaza Station), offering a five-minute walk to rapid transit connecting to destinations like the University of Manitoba and downtown Winnipeg though it remains car-dependent for most errands. The area features a blend of residential, commercial, and industrial spaces. Residential options include luxury townhomes, modern apartments. Commercially, the district is anchored by a two-storey GoodLife Fitness (the citys largest), alongside retail, office, and flex-industrial spaces.


  • Crossings 2 - The Refinery District
Location: 405, 411, 415 Ballantrae Drive
Developer: Ironclad Developments Inc.
Architect: Robert Garvey, Architecture 77 Inc.
Status: U/C
Documents: Plan Approval, September 23, 2024 | Submitted Plans | Submission
Media:
Project post
Description: Proposed are three multi-family apartment buildings of six storeys each, with a total of 208 dwelling units. This development is Phase 2 of a development project, which includes the property to the south at 425/435 Ballantrae Drive as Phase 1.
Permits: #25-111050 MU-2025-04-02, Construct New. 405/411 Ballantrae Permit. Construct a two 6-storey, 5,589 m² Building A and 6,183 m² Building B, 121 units multi-family wood-framed buildings with shared parkade.
#25-111192 MU-2025-04-02, Construct New. 415 Ballantrae Permit. Construct 6-storey, 9,181 m², 87 units multi-family wood-framed building with underground parkade.

Location: 225 Newmarket Boulevard
Developer: Porchlight Developments and Marwest Management
Architect: Raymond S C Wan Architect Inc
Status: U/C
Documents: Plan ApprovalMay 30, 2022 | Submitted Plans | Submission
Media:
Project post
Description: The applicant wishes to construct, in two phases, a residential building older adults.
Phase 1 is proposed to include: 135 Assisted Living Units in a combined 4 and 6 storey building on the westerly portion of the property. 115 vehicle parking stalls including 78 underground and 37 outdoor.
Phase 2 is proposed to include: 115 independent apartment units for older adults in a combined 4 and 6 storey building on the easterly portion of the property. 84 vehicle parking stalls including 51 underground (with room for possible 73 additional stalls) and 31 outdoors.
The site plan includes a large courtyard, several pedestrian entrances and ground level routes/connections, bike parking and a wide range of landscaping throughout the site including trees and outdoor seating. The building includes, shared and private dining options, a large glazed entrance off the courtyard, multiple lounges, a theatre, workshop and dog washing station and Individual entrances, balconies and ground level outdoor patios.
Permits: #25-149387 MU-2025-06-09, Construct New. Optional Professional Certification Program Permit. Six storeys with a below grade parking garage and a building area (footprint) of approximately 5,580 m². The building is not considered to be a high building. THE WILLISTON REFINERY LTD. - Construct a six-storey,209,430 ft² new apartment building (Phase I) with 138 units and an underground parkade. An additional 112 units will be constructed in Phase II. The WRRF will function as a Group C (Residential) major occupancy with subsidiary Group D (Business and Personal Services), Group A, Division 2 (Assembly) and Group F, Division 3 (Low-Hazard, Industrial) occupancies.

  • 250 Newmarket Boulevard - The Refinery District
Location: 250 Newmarket Boulevard
Developer: Hopewell (Bishop Grandin) Development Inc.
Architect: Raymond S C Wan Architect Inc
Status: In Development
Documents: Plan Approval, June 24, 2025 | Submitted Plans
Media:
Description: The applicant proposes a single-storey commercial building with four commercial rental units (CRUs), each ranging from 1,374 to 1,500 square feet. The development includes a 548-square-foot outdoor patio and uses concrete unit paving as the patio surfacing material, the building will be constructed using brick veneer and EIFS materials. Additionally, the proposal incorporates four bicycle parking spaces and a landscaping plan featuring ten new trees, 111 new shrubs, and 13 new perennials and grasses.
Permits:



Naawi-Oodena - Kapyong Barracks Redevelopment
Location: Route 90/Grant Avenue, Winnipeg, MB
Developer: Treaty One Development Corporation & Canada Lands Company Limited
Architects (Master plan): Scatliff+Miller+Murray
Status: Phased development - U/C
Media: Everything is on track and going quite well’: Naawi-Oodena takes shapeWinnipeg Free Press
Documents:Project Thread: Kapyong Barracks Discussion
Description: Naawi-Oodena, meaning "centre of the heart and community" in Anishinaabe, is Canada's largest urban reserve, located in southwest Winnipeg, on the former Kapyong Barracks site. Spanning 160 acres near the Tuxedo and River Heights neighborhoods, it is a joint project led by seven Treaty One First Nations alongside the Canada Lands Company. The site, once a military base decommissioned in 2004, was repatriated to Treaty One Nations in 2022 after a nearly two-decade legal battle over treaty land entitlement claims. The development, managed by the Treaty One Development Corporation (T1DC) for 68% of the land and Canada Lands Company for the remaining 32%, aims to create a vibrant mixed-use community. The master plan, released in 2021, includes 2,300 to 3,000 residential units, 915,000 to 1.2 million square feet of commercial space (retail, office, and institutional), and areas for cultural, educational, recreational, and community purposes. It emphasizes Indigenous design, incorporating traditional elements like Anishinaabe-inspired patterns, native plants, and cultural spaces, while fostering economic growth and reconciliation. The project, expected to take 10-15 years and generate over $2 billion in economic impact, is designed to integrate with surrounding neighborhoods, offering housing, retail, and services for both Indigenous and non-Indigenous residents. The City of Winnipeg provides municipal services like policing and fire protection under the 2022 Gaawijijigemangit Agreement, with Treaty One collecting taxes mirroring city rates, remitting 65% to the city and retaining 35% for community development. The city of Winnipeg does not have jurisdiction to approve or regulate development on the treaty 1 lands that make up approximately 108 acres of the site, the 51 acres to be developed by the Canada Lands Company is subject to the city of Winnipeg bylaw regulations.
  • Master Plan:



Video Link

  • Naawi-Oodena T1N- Phase 1 (Block A)
Status: U/C
Media: Naawi-Oodena: A vision for the future of Winnipeg-Winnipeg Regional Real Estate News | Good Neighbors, Better Development-Manitoba Inc.
Description: Construction on Block A began in April 2024, with the entire parcel expected to be completed by 2028. This phase is part of a broader master plan for Naawi-Oodena, aiming to create a vibrant mixed-use community on the former Kapyong Barracks site, led by the Treaty One Development Corporation. Phase One of Block A in the Naawi-Oodena development, located at the northeast corner of Kenaston Boulevard and Taylor Avenue, consists of the following key components:
  • Oodena Gas Bar, 1871 Taylor Ave, A 24-hour gas and convenience station (Completed June 2025).
Media: Naawi Oodena gets first business–CTV Winnipeg YouTube

  • The Treaty One Development Corporation Business Park, Planned as a commercial mixed-use zone with up to 130,000 square feet of commercial space, including a 95,000 square foot commercial centre. It supports retail, services, and other business uses, emphasizing Indigenous-led economic development.



  • Block D Apartments
Location: Naawi-Oodena
Developer: Treaty One Development Corporation
Architects: Number TEN Architectural Group [Building] | HTFC Planning & Design [Courtyard]
Status: U/C
Media:
Documents:
Description: 260 unit apartment complex

  • Naawi-Oodena - Canada Lands Company - Phase 1
Developer: Canada Lands Company Limited
Status: Subdivision and Rezoning application
Media: Naawi-Oodena takes another step toward development of 300-plus homesCBC News Manitoba
Documents:Description: As part of the first phase of the Naawi-Oodena redevelopment on the Canada Lands Company portion of the former Kapyong Barracks site in southwest Winnipeg, the applicant has proposed subdividing the property to establish 32 new lots, one dedicated public reserve, and new public streets and lanes. This initiative supports the creation of a vibrant, mixed-use community through rezoning the land from its current “RR5” Rural Residential designation to a Planned Development Overlay (PDO), which will provide a tailored regulatory framework to guide future building and land use. The subdivided lots comprise 27 “R2” Residential Two-Family parcels suitable for duplexes or similar low-density housing, four “RMF-M” Residential Multi-Family (Medium) lots intended for mid-rise apartments or townhouse developments, one “CMU” Commercial Mixed Use lot to accommodate retail, office, or service-oriented businesses, and one “PR1” Parks and Recreation (Neighbourhood) lot designated as a public reserve to enhance community green space. This phase, for which municipal rezoning and subdivision approvals were granted in June 2025, lays the groundwork for initial residential and supporting development, including ties to federal efforts like Build Canada Homes to deliver approximately 320 affordable units on a prioritized parcel using modern construction methods. Subsequent phases of the broader Naawi-Oodena project on the Canada Lands side will involve additional subdivision applications, rezoning requests, and potential PDO amendments to realize the full vision of up to around 2,000 homes across the entire 160-acre site, alongside substantial commercial, cultural, and recreational elements in partnership with Treaty One First Nations.




Water Tower District
Location: St. Boniface, Winnipeg, MB
Developer: Olexa Developments | Shindico Realty Inc.
Status: In development
  • Construction of essential infrastructure, including roads, water, and sewer systems, began in 2023, with internal roads expected to be completed by 2025.
Media: SHINDICO on the horizon: The Water Tower District-Winnipeg Regional Real Estate News
Project Thread: St. Boniface | Water Tower District
Documents:
Description: The Water Tower District is a 165-acre mixed-use development in Winnipeg’s St. Boniface neighbourhood, led by Calgary-based Olexa Developments and Winnipeg’s Shindico Realty. Located on a former brownfield site, previously home to meat-packing plants, the project aims to revitalize one of the city’s oldest areas into a vibrant, transit-oriented community. Approximately 70 acres are designated for light-to-medium industrial use, offering nearly one million square feet of shovel-ready employment space. Another 25 acres are dedicated to multi-family residential development, providing over 1,200 rental units. Commercial and retail spaces occupy 21 acres, fostering local business and services, while 22 acres are reserved for parks and green spaces, enhancing livability and recreation. This thoughtful land use plan supports the project’s vision of a sustainable, 15-minute city, with completion expected by 2033. The site includes the historic St. Boniface Water Tower, built in 1936 and enlarged in 1945, though decommissioned in the 1970s. The tower now houses communication infrastructure for the city’s water system.



Southwood Circle (University of Manitoba development)
Location: 230 University Crescent-North Campus Lands
Developer: UM Properties
Architects (Master plan): DIALOG | Scatliff+Miller+Murray
Status: In development
  • Recent activities include site servicing, road construction, and riverbank stabilization, with some active transportation routes closed for safety during construction.
Documents:Media: Project Thread: UofM | Southwood Circle
Description: Southwood Circle is a major mixed-use infill development project in south Winnipeg, located on approximately 110.67 acres of former Southwood Golf and Country Club land, adjacent to the University of Manitoba’s Fort Garry campus. It aims to transform the area into a sustainable, walkable urban community, often described as Manitoba’s first “UniverCity” and the largest infill project in Winnipeg’s history. The $6-billion development, managed by UM Properties (an arm’s-length entity of the University of Manitoba), will be built in four phases over 20 years, with construction starting in 2024 and will include over 11,000 residential units (apartments and townhouses) to house up to 20,000 people, and 300,000 square feet of commercial retail space. The development emphasizes on sustainability and renewable energy, LEED Gold buildings, geothermal energy, carbon capture, on-site recycling, composting, and EV sharing. Over 5,000 mature trees (some 300 years old) will be preserved, with two trees planted for every one removed, and 21 acres of parkland, including 9 acres of Red River waterfront, will be developed. A Living Lab Research Consortium will involve developers, faculty, and students in data-driven research to enhance sustainability and community wellness. Southwood Circle aims to integrate the university with Winnipeg’s urban fabric and connect to downtown via rapid transit. With a projected daily campus population of 60,000, it’s set to become Manitoba’s second-largest urban centre after Winnipeg.
Permits: #24-264287 DP-2025-02-04, Permit. Development permit for an underground site servicing/riverbank stabilization works.



Fulton Grove Development
Location: Fulton Grove (Parker Lands)
Developer: Gem Equities
Status: In development
Documents:Media: Parker Lands project moving forward–Winnipeg Free Press
Project Thread: Fulton Grove Development
Description: Fulton Grove is a significant transit-oriented residential development in Winnipeg’s Parker Lands, a 19-hectare site in Fort Garry, led by Gem Equities under developer Andrew Marquess. The project aims to create a dense, walkable, mixed-use neighborhood with 1,918 housing units, including 23 mid-rise apartment towers, townhouses, duplexes, triplexes, and single-family homes. Designed to align with the city’s Our Winnipeg plan, it emphasizes sustainability and affordability, featuring geothermal heating and proximity to the Southwest Transitway. The development promotes a 15-minute city model, offering condos and rentals alongside public green spaces. The project has faced a complex history since its inception in 2009, marked by a controversial land swap, protests over forest clearing in 2017, and prolonged legal disputes. A 2018 court ruling mandated public hearings, and while a $5-million judgment was awarded to Marquess in 2023 for city delays, this was overturned by Manitoba’s Court of Appeal in 2025. After 11 years of challenges, Winnipeg’s city council unanimously approved rezoning in April 2024, paving the way for construction to begin soon. Fulton Grove represents a transformative step for Winnipeg, addressing housing shortages, enhancing urban connectivity, and advancing sustainable development.


Location: Parker lands
Developer: Carrington Real Estate
Architect: -
Status: In Development
Documents: -
Media: -
Description: Fulton Grove Phase 1 features a luxury apartment complex with a total of 190 units. The estimated completion date is Fall 2027.

Location: Parker lands
Developer: Carrington Real Estate
Architect: -
Status: In Development
Documents: -
Media: -
Description: Fulton Grove Phase 2 features a luxury apartment complex with a total of 215 units. The estimated completion date is Fall 2028.


Polo Park (mall parking lot redevelopment)
Location: 1485 Portage Ave, Winnipeg, MB
Developer(s): Shindico & Cadillac Fairview Corporation Limited.
Status: In development
Media: Project Thread: Polo Park Expansion
Renderings
Description: Cadillac Fairview and Shindico are spearheading a $1 billion redevelopment of the 84-acre Polo Park Mall, the largest shopping centre in Manitoba, including the former Canad Inns Stadium site, to create a mixed-use, pedestrian-friendly community. The Master Plan vision includes up to 4,000 residential units in high-rise and mid-rise buildings, new retail zones like The Commons and The Hub, office spaces, and potential assisted living facilities, alongside parks, cycling paths, and improved transit connections. Surface parking will be replaced with underground or multi-level parkades, and infrastructure upgrades will address traffic concerns. The decade-long project, with the first phase targeting the stadium lands, aims to house 5,000 people and revitalize west Winnipeg, pending city council approval.
Master Plan Vision:

Stadium Lands:

The Market:

The Hub:

The Commons:


CentrePlan 2050
Location: Downtown
Developer: City Of Winnipeg
Status: On September 26, 2024 Council adopted CentrePlan 2050 as a secondary plan by-law for Downtown Winnipeg.
Documents: CentrePlan 2050 By-law 72/2024
Media: CentrePlan 2050 aims to revitalize downtown Winnipeg
Description: CentrePlan 2050 is a secondary plan by-law that sets out five strategic moves to create a resilient and thriving downtown Winnipeg:
  • Create great urban neighbourhoods
  • Re-envision streets to foster urban life
  • Grow a greener Downtown
  • Create a lively Downtown
  • Improve Downtown governance and implementation

Location: Graham Avenue
Developer: City Of Winnipeg
Status: 2025 start
Documents: CentrePlan 2050 - May 2024 | CentrePlan 2050 - Re-imagining Graham Avenue
Media:Project Post
Description: The City wants to create a signature street in Downtown. A place to meet-up on a patio, attend a market, gather for events, read a book in the shade, or walk a dog. In June 2025, bus routes will begin moving off Graham Avenue as planned in the Winnipeg Transit Master Plan. This gives Winnipeg an incredible opportunity to re-imagine how we use Graham Avenue.




Portage & Main Revitalization
Location: Portage & Main
Developer: City Of Winnipeg
Status: Phase 1 - open to pedestrians completed June 2025
Thread: Winnipeg | Portage and Main
Documents:Media:Description: Winnipeg’s iconic Portage & Main intersection is undergoing a transformative revitalization, with plans to restore pedestrian street-level crossing by July 1, 2025. The project, spurred by the need to replace the aging waterproofing membrane of the underground concourse, aims to enhance accessibility and revitalize the public space at this historic civic landmark.

Since 1979, barriers have blocked pedestrian crossings at street level, funneling foot traffic through the underground concourse. The city now plans to decommission this concourse, with ongoing studies assessing its condition, closure costs, and potential traffic impacts. Public engagement in 2023 has shaped the project’s vision, prioritizing safety and inclusivity for the intersection.

The 2024-2025 construction project is the first step in revitalizing Portage & Main, in the future, a study will be commissioned to determine how best to decommission and close the concourse and will focus on implementing the longer-term recommended design vision. Additional streetscaping design work will be included in the upcoming Rapid Transit (Downtown Corridors) Preliminary Design Study which is expected to begin in 2025 and will integrate Winnipeg Transit infrastructure into the final design of the intersection. With significant infrastructure investment, the city aims to reimagine Portage & Main as a vibrant, pedestrian-friendly hub, reinforcing its status as a cultural cornerstone of Winnipeg.




Video Link


Winnipeg Transit Master Plan
Description: The Winnipeg Transit Master Plan, adopted on April 29, 2021, outlines a long-term strategy to transform public transit in Winnipeg by introducing a new, resilient transit network designed to adapt to the city's growth. The plan emphasizes a frequent transit network, significantly increasing the number of households within a short walk of frequent transit services. At its core is an expanded Rapid Transit system, featuring six corridors forming three lines, with downtown infrastructure, including an elevated transitway and Union Station as a central mobility hub, as the top priority. Additionally, the plan enhances Winnipeg Transit Plus, integrating it with conventional and On-Request services to create a more seamless, accessible, and interconnected transit network.
Media:Documents:Union Station | Central hub of the rapid network:


Video Link
Location: Oak Point Highway and Selkirk Avenue
Developer: City Of Winnipeg
Consultants: Dillon Consulting
Status: U/C
Documents:Media:Description: Winnipeg Transit is set to build a new, state-of-the-art $200M bus garage in the Point Douglas Ward at the intersection of Selkirk Avenue and Oak Point Highway to replace the outdated North Garage at 1520 Main St., which is too small to accommodate future growth. The new facility, designed to house approximately 250 buses at it's full build out, including 60-foot articulated buses, buses with bike racks, roof-mounted air conditioners, and zero-emission buses, will feature an energy-efficient storage, service, and maintenance facility. The project, funded through the Public Transit Infrastructure Stream’s Investing in Canada Infrastructure Program, includes contributions of up to $73.0 million from the Government of Canada, $60.8 million from the Province of Manitoba, and $48.7 million from the City of Winnipeg. The design phase is currently underway and expected to be completed by the end of 2024, with construction slated to begin in 2025 and finish by 2027, ensuring Winnipeg Transit can continue meeting riders' needs with modern, sustainable infrastructure.


Video Link

Location: Sutherland Avenue through Point Douglas, across a new Louise Bridge, and along Nairn and Regent avenues
Developer: City Of Winnipeg
Status: In Development
Documents:Media:Description: The Eastern Corridor Study, initiated in 2017 following the 2011 Transportation Master Plan's recommendation, aims to determine the optimal route, design, and infrastructure for rapid transit between Downtown and eastern Winnipeg, while also exploring replacement options for the Louise Bridge. With the route now approved to utilize a new Louise Bridge, the study focuses on developing new rapid transit infrastructure and replacing the bridge and surrounding roadway. The study does not cover transit service details, such as lines and frequencies, which are outlined in the Winnipeg Transit Master Plan adopted in 2021, designating the Eastern Corridor’s service as the Rose Line. The corridor is divided into three priority segments: Stage 1 (Harkness Station to Main Street CP Railway underpass, shared with Blue and Orange Lines), Stage 2 (Main Street CP Railway underpass to Watt Street), and Stage 3 (Watt Street to Plessis Road). Stage 1 is deferred to the upcoming Rapid Transit Downtown Corridor study, Stage 3 to a future Northeast Corridor study, and Stage 2 is the current focus of engagement. Details on the preferred alignment and decision factors are provided in an appendix to the Winnipeg Transit Master Plan.




Transportation Master Plan (Transportation 2050)
Description: Transportation 2050 is a comprehensive plan to transform Winnipeg’s transportation system into a sustainable, accessible, and safe network by 2050, emphasizing walking, cycling, transit, and ridesharing while acknowledging the continued role of cars. The plan aims to achieve four key targets: supporting economic prosperity through efficient goods movement, achieving a 50% mode share for sustainable transportation, reducing fatal and serious injury collisions by 20% by 2026, and ensuring an accessible and equitable transportation system. It outlines seven key directions, including integrating land use with transportation, prioritizing infrastructure maintenance, and enhancing active transportation and transit reliability. The plan supports complete communities, improves pedestrian and cycling networks, investigates future light rail transit, and addresses goods movement through a dedicated study, promoting efficient truck routes, intermodal connectivity, and low-carbon freight options. By fostering regional collaboration and strategic investments, Transportation 2050 seeks to balance economic growth, safety, and sustainability while enhancing mobility for all Winnipeggers.
Documents:Media:
Location: Arlington Bridge
Developer: City Of Winnipeg
Status: In Development
Documents:Media:Description: The century-old Arlington Bridge, a vital link in Winnipeg’s infrastructure, is nearing the end of its lifespan and will be replaced with a modern design to meet the city’s growing needs. Closed since late 2023, the bridge’s replacement project has taken a significant step forward with the completion of its preliminary design and a $22 million budget amendment approved by the city council’s executive policy committee for demolition and redesign. The new bridge, spanning from McDermot Avenue to Selkirk Avenue, will address the limitations of the existing structure, which struggles to accommodate modern traffic demands and accessibility standards. With Winnipeg’s population projected to grow by 200,000 over the next 25 years, the redesigned bridge aims to improve connectivity for commuters, transit users, cyclists, and pedestrians while enhancing emergency access and traffic flow. Key improvements include gentler inclines and wider sidewalks for easier walking and cycling, dedicated pedestrian and bike paths, and support for transit buses, which are currently rerouted due to the bridge’s restrictions. The new design will also accommodate commercial trucks and add an extra traffic lane to reduce congestion. Emergency vehicles, previously unable to cross, will gain direct access, improving response times. Beyond functionality, the project promises local enhancements, including connections to the city’s cycling network, upgraded roads and intersections, and public art to beautify the area. Surplus land near the bridge may also open opportunities for future development. The City of Winnipeg is collaborating with technical experts and the public to finalize the design, with a map of proposed improvements now available. As the city prepares for a growing population, the new Arlington Bridge is poised to become a cornerstone of improved urban mobility and community connection.



Video Link

Location: Route 90 between Taylor Avenue and the St. James Bridges.
Developer: City Of Winnipeg
Status: In Development
  • On June 27, 2024 Council approved the preliminary design. The project was referred to the 2025 Investment Planning process. The City will move forward with an independent value for money assessment. The assessment will evaluate the business case and alternative project delivery methods. Detailed design and funding is required before construction begins.
Documents:Media:Description: The 2018 Route 90 Improvements Study builds on the 2012 Transportation Planning Study by developing a $737-million preliminary design for Route 90, incorporating three travel lanes in each direction, modifications to the St. James bridges, ramp structures, and the Portage Avenue and Academy Road interchanges. The design prioritizes enhanced traffic flow, safety, and accessibility for pedestrians, cyclists, and transit users while maintaining two lanes of traffic in both directions during construction. Key improvements include roadway enhancements to reduce congestion, safety measures to minimize collisions and ensure safe crossings, infrastructure to support walking and cycling, and place-making features like landscaping, green spaces, and public art. These upgrades aim to address current and future traffic demands, accommodate new developments, and enhance the surrounding communities.


Video Link

Location: Main Street to Brookside Boulevard
Developer: City Of Winnipeg
Status: In Development
  • June, 2019 - An administrative report was presented to council at the June 20, 2019 meeting, with a recommendation that the Chief Peguis Trail Extension West project be considered and prioritized amongst other major unfunded capital projects through development of a City Infrastructure Plan. This recommendation was accepted by council. The project timing projection has been updated as part of the Transportation Master Plan review, and presented as part of the final document of that study.
Documents:Media:Description: The Chief Peguis Trail (CPT) Extension West, approved in 2012 as an amendment to the Transportation Master Plan, involves constructing a four-lane divided roadway from Main Street to Brookside Boulevard in Winnipeg, spanning approximately 10 kilometers. The project includes overpasses at Main Street and McPhillips Street, four intersections, three pedestrian and cycling overpasses, and improvements to the Kildonan Settlers Bridge to enhance intersection and pathway connectivity. The estimated cost for the full extension was $486.6 million in 2019 and is now $755 in 2025, with a phased approach costing $262.3 million for the Main Street to McPhillips Street segment, and the remaining section to Brookside Boulevard to be completed later based on need. These 2020-based estimates require a 3% annual inflation adjustment if delayed. Traffic projections suggest the Main Street to McPhillips segment may not be needed until after 2031, with further analysis pending in an upcoming Transportation Master Plan review. A Functional Design Study informed the project’s scope, aiming to support economic and residential development by as many as 15,000 new homes, reduce neighborhood traffic, and enhance transit, walking, and cycling. A cost-benefit analysis in the report estimates the net economic and social benefits from building the extension to be $98 million over 50 years. A Preliminary Design Study is underway to finalize the design, ensuring it accommodates traffic flow, connects neighborhoods, includes pedestrian and cycling infrastructure, supports public art, and minimizes environmental impact. The project’s prioritization among other unfunded capital projects will be addressed through a City Infrastructure Plan.


Video Link

Location: Marion Street between St. Mary’s Road and Lagimodiere
Developer: City Of Winnipeg
Status: In Development
  • The recommendations will be considered by Standing Policy Committee on Public Works on July 3, 2025.
Documents:Media:Description: In 2014, the City of Winnipeg conducted the Marion Grade Separation and Widening Study to enhance traffic flow and capacity along Marion Street from its east limit to Goulet Street, concluding in 2016 with five proposed options, including a costly and intrusive interchange at the CPR Emerson line and Archibald Street, which was ultimately shelved due to community concerns and excessive costs. In response to the narrow focus of the initial study, the City launched the Moving on Marion Street project in 2019, starting with Phase 1 community pre-engagement to refine objectives and engagement methods. The redefined project now addresses safety, traffic flow, and livability, expanding its scope to cover three interrelated neighbourhood areas: the West Segment (Marion-Goulet couplet, a mixed-use main street, and a transitional zone from Youville Street to Archibald), the East Segment (a manufacturing and industrial corridor from Lagimodière to Archibald), and the broader Marion corridor as a vital city route. The project incorporates stakeholder input, public feedback, and statistical data to develop cost-effective solutions tailored to the diverse needs of the community.

Location: Assiniboine River crossing, McFadyen Park and Fort Rouge Park, Winnipeg, MB
Developer: City of Winnipeg
Architect: TBD
Contractor: TBD
Size: TBD
Cost: Unfunded
Status: design Stage
Media: 3 designs pitched for new pedestrian bridge over Assiniboine River
Renderings
Description: A preliminary design for a new pedestrian and cycling bridge over the Assiniboine River will be developed to connect Osborne Village to Downtown via McFadyen Park on the north side of the river and Fort Rouge Park on the south side of the river. Considerations for this project include pedestrian and cycling connectivity throughout Osborne Village to Osborne Rapid Transit Station, Norwood Bridge, bike lanes on Nassau Street, and the riverwalk, upgrades to both McFadyen Park and Fort Rouge Park, crime prevention through environmental design (CPTED), and riverbank stabilization.
Bridge Option 2 of 3: Cable-Stayed Bridge:
Landmark double curved bridge:



Lagimodiere Twin Overpasses Rehabilitation Project
Location: Lagimodiere Overpass
Developer: City Of Winnipeg
Status: U/C
Documents:Media:Description: The City of Winnipeg has launched a major rehabilitation project on the Lagimodiere Twin Overpass bridges at Concordia Avenue, where Lagimodiere Boulevard crosses over Concordia Avenue and the CPKC rail line. With a budget of approximately $51 million, the initiative aims to extend the bridges' service life by an additional 50 years while enhancing overall infrastructure safety and accessibility in this critical transportation corridor. The work encompasses bridge repairs, road and ramp rehabilitation, improved drainage, and pavement restoration along Lagimodiere Boulevard from Almey Avenue to Grassie Boulevard, as well as along Concordia Avenue from Molson Street to Peguis Street. A key enhancement includes new multi-use pathways for pedestrians and cyclists: one along Concordia Avenue from Molson Street to Panet Street, and another on the east side of Lagimodiere Boulevard connecting Reenders Drive to Ravelston Avenue West, bolstering the city's active transportation network. Construction spans 2026 and 2027, with phased work to minimize disruption. In 2026 (Phase 1, focusing on the southbound bridge and lanes, expected through late October or November), traffic shifts to the northbound bridge, reducing Lagimodiere Boulevard to one lane per direction. In 2027 (Phase 2), the process reverses to the northbound bridge. Interchange ramps to/from Concordia Avenue may close for 6-8 weeks at times for pavement repairs. Transit services remain unaffected, and the sidewalk along Concordia Avenue stays open for pedestrians.


CentrePort Canada
Location: CentrePort Canada Way
Developer: CentrePort Canada
Status: U/C
Documents: Agreement for Services with Winnipeg Airports Authority – January 20, 2026
Media:Thread: Winnipeg | CentrePort Canada
Description: CentrePort Canada stands as North America's largest trimodal inland port and Foreign Trade Zone, encompassing approximately 20,000 acres of prime, affordable industrial land in northwest Winnipeg and the Rural Municipality of Rosser, Manitoba. Strategically positioned adjacent to Winnipeg James Armstrong Richardson International Airport, it offers seamless integration of rail (via three Class I railways: CN, CPKC, and BNSF), air cargo (with 24/7 global operations handling thousands of freighter flights annually), and trucking networks, providing efficient access to North American markets and beyond. Home to over 1,000 tenants—including major players like Boeing, StandardAero, FedEx, MacDon, and Paterson GlobalFoods—CentrePort has developed more than 2,300 acres since its inception around 2009, driving significant economic growth in sectors such as aerospace, agribusiness, advanced manufacturing, logistics, and life sciences. As of early 2026, the inland port is experiencing robust momentum amid global supply chain shifts. Key 2026 developments include the near-completion of major water and wastewater infrastructure in CentrePort South by mid-year, unlocking 1,800 acres for development (including 1,100 acres of industrial land and a 500-acre mixed-use residential community). The Winnipeg Airports Authority's new multi-tenant air cargo facility is set to become operational by summer, while ongoing expansions, land sales, and private investments continue at a record pace. Recent initiatives, such as the January 2026 "Ports Manitoba Project"—a landmark Memorandum of Understanding uniting CentrePort with the Port of Churchill, Winnipeg Airports Authority, and federal/provincial partners—aim to enhance inland, air, and Arctic trade corridors, diversifying routes and attracting further investment. With vast remaining land, supportive government funding (including a recent provincial investment), skilled workforce programs, and its central location offering low costs and FTZ benefits, CentrePort Canada holds strong future growth potential. It is poised to solidify Manitoba's role as a key North American logistics and supply-chain hub, fueling job creation, business expansion, and economic diversification in the years ahead.


Video Link

Last edited by Wpg_Guy; Mar 3, 2026 at 8:04 AM. Reason: fix DIMS links|Lagimodiere Overpass|UM’s Capital Plan|Block D Apartments|continue Wpg Developments w/permission frm FactaNV
Reply With Quote
     
     
  #3  
Old Posted May 14, 2025, 2:50 PM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,469
Winnipeg on a roll! Thanks for the comprehensive overview.

Exciting stuff.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-25]
Reply With Quote
     
     
  #4  
Old Posted May 14, 2025, 3:12 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,038
Quote:
Originally Posted by Echoes View Post
Winnipeg on a roll! Thanks for the comprehensive overview.

Exciting stuff.
Yea I was scrolling and thought at about halfway that this would be more than enough exciting development, but I wasn't even done yet.

I'm hoping the Polo Park redevelopment starts moving soon!
Reply With Quote
     
     
  #5  
Old Posted May 14, 2025, 4:24 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,216
Quote:
Originally Posted by WildCake View Post
Yea I was scrolling and thought at about halfway that this would be more than enough exciting development, but I wasn't even done yet.

I'm hoping the Polo Park redevelopment starts moving soon!
That and Southwood Circle. They could be huge for the city.
Reply With Quote
     
     
  #6  
Old Posted May 14, 2025, 3:16 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,667
Amazing work Wpg_Guy.

Thank you
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #7  
Old Posted May 14, 2025, 4:54 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,647
taht 1141 St Mary's with a new George's is new to me, never heard of that. Love how a small business owner is spearheading it
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
Reply With Quote
     
     
  #8  
Old Posted May 14, 2025, 4:54 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 14,697
Thank you for the great work. amazing!

The first big residential project for Kapyong should be made public soon....as well as the Portage Place residential tower.
Reply With Quote
     
     
  #9  
Old Posted May 14, 2025, 4:58 PM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,216
Quote:
Originally Posted by trueviking View Post
Thank you for the great work. amazing!

The first big residential project for Kapyong should be made public soon....as well as the Portage Place residential tower.
Wicked! Thanks for the heads up!
Reply With Quote
     
     
  #10  
Old Posted May 14, 2025, 5:41 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,155
I am most intrigued by the project at 187 Garry, any word on when that might start?
__________________
"Enlightened statesmen will not always be at the helm."
Federalist #10, James Madison
Reply With Quote
     
     
  #11  
Old Posted May 15, 2025, 12:46 AM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,618
Quote:
Originally Posted by optimusREIM View Post
I am most intrigued by the project at 187 Garry, any word on when that might start?
Yea that caught my eye two hope it gets done
Reply With Quote
     
     
  #12  
Old Posted May 14, 2025, 7:17 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 14,697
What about the Hampton Inn hotel tower?
Reply With Quote
     
     
  #13  
Old Posted May 15, 2025, 3:57 AM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,356
Quote:
Originally Posted by trueviking View Post
What about the Hampton Inn hotel tower?
Might you be referring to the 18 floor, Hilton Garden Hotel, proposed in a couple of years @ York & Donald adjacent to Hampton Inn?
Reply With Quote
     
     
  #14  
Old Posted May 15, 2025, 3:39 PM
neutroniks neutroniks is offline
Registered User
 
Join Date: Nov 2022
Posts: 722
Quote:
Originally Posted by BAKGUY View Post
Might you be referring to the 18 floor, Hilton Garden Hotel, proposed in a couple of years @ York & Donald adjacent to Hampton Inn?
I liked the design of this tower especially with how desolate Donald looked. Hope this one is still on the table, as it really spreads out the concentration of the towers. And when they do move forward, hoping its more than 18 floors haha.
Reply With Quote
     
     
  #15  
Old Posted May 14, 2025, 7:29 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 14,697
I like the one on Dumolin....Verne is a good architect.

I hadn't seen the latest renderings of the McMillan project.....it's better than it used to be....not real brick I assume though.
Reply With Quote
     
     
  #16  
Old Posted May 15, 2025, 1:09 AM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is offline
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 679
Great work Wpg_Guy!

This will be fun to revisit 10 years from now and see what was built and what wasn’t.
Reply With Quote
     
     
  #17  
Old Posted May 15, 2025, 2:00 AM
James Bond Agent 007's Avatar
James Bond Agent 007 James Bond Agent 007 is online now
Posh
 
Join Date: Aug 2003
Location: Kansas City, MISSOURI
Posts: 23,238
Should we split this page off into a new thread so that the project overview at the top of this page goes on the first page of a new thread?

EDIT: Nevermind I went ahead and did it.
__________________
You fill me with inertia.
Reply With Quote
     
     
  #18  
Old Posted May 15, 2025, 2:04 AM
FactaNV FactaNV is offline
Registered User
 
Join Date: Sep 2023
Posts: 2,216
Lovely. Here's to construction 11!
Reply With Quote
     
     
  #19  
Old Posted May 15, 2025, 2:05 AM
James Bond Agent 007's Avatar
James Bond Agent 007 James Bond Agent 007 is online now
Posh
 
Join Date: Aug 2003
Location: Kansas City, MISSOURI
Posts: 23,238
I also added a link to the old thread in the (new) OP above in case anyone wants to refer to something there. I'll close the old thread and sticky this one.
__________________
You fill me with inertia.
Reply With Quote
     
     
  #20  
Old Posted May 15, 2025, 2:15 AM
James Bond Agent 007's Avatar
James Bond Agent 007 James Bond Agent 007 is online now
Posh
 
Join Date: Aug 2003
Location: Kansas City, MISSOURI
Posts: 23,238
I also added a Google maps link to the Refinery District project, since it was missing one.
__________________
You fill me with inertia.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:08 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.