Tucson Development Thread


Although it won't affect next month's gem show, the discovery of some missing caissons at TCC will delay the opening of the new east entrance by two months:


Somebody forgot load-bearing pillars at TCC
By Roger Yohem
Inside Tucson Business
January 15, 2010

Tucson (Convention Center) we have a problem: Contractors working on the facilities’ new $4.3 million grand entrance have discovered that five weight-bearing pillar structures were never installed as required 20 years ago, despite the fact that city inspectors signed off on the project. Among other things, it will delay the project by at least two months into April. The good news, relatively speaking, is that contractors Garfield Traub have figured out a fix that shouldn’t cost any more than $280,000.

Stephen Moffett, division president for Garfield Traub, said case of the missing caissons, as they’re called, was discovered during excavation. “The as-built drawings from 20 years ago show five caissons there, in place, supporting the structure. The project was signed off by the city but the as-built drawings are not correct,” he said. As-built drawings are supposed to reflect all changes made during construction. In this case, instead of caissons, a load-bearing beam was installed. “We are adding weight to the building,” Moffett said. “We were counting on those caissons being there.”

Tommy Obermaier, deputy director of the convention center, said city officials are aware of the issue and have confidence in Garfield Traub’s recommendation for a fix. Although the plan was to have the new entry completed in time for February’s Gem & Mineral Shows, the delay will not impact events at the site, Obermaier said. “The reality is, neither gem show we have lets people use that entrance,” he said. “They forced people to use the west entrance.

Despite the added expense, Moffett said that it doesn’t look as if the city will be on the hook to pay it. Instead, the repair money likely will come from Garfield Traub’s “guaranteed maximum price” budget that includes allowances for unforseen expenses. “Some positives have actually come of this,” Moffett said. “We’ve already identified a Tucson contractor as our preference to do the repair.” And they’re also “proactively looking” for other possible structural defects around the building. Garfield Traub has a $200 million contract with the city to construct the new south entry, demolish the west entrance, develop a 525-room hotel, and build a 950-space parking garage.
 
Even with construction beginning in 2011, the $166M widening of approximately five miles of Grant Rd. isn't scheduled to be complete until 2024:


Grant Road construction to start two years early
Inside Tucson Business
January 15, 2010

Two years ahead of schedule, work will get started by the middle of next year on the $166 million, widening to six lanes of five miles of Grant Road from Oracle to Swan roads. The “extreme makeover” of the arterial is the largest project in the $2 billion Regional Transportation Plan approved by voters in May 2005. Basically, the plan calls for starting the project on the west side, at the Grant and Oracle intersection, building eastward through the First Avenue intersection. After that, work will be on the east side, east of Swan Road and go west.

Here is the planned timetable:

• Mid 2011-2012 - Oracle segment, the intersection of Grant and Oracle roads east to Castro Avenue, $11 million.

• 2014-2015 - Stone Avenue/First Avenue segment, from Castro Avenue eastward through First Avenue intersection to Fremont Avenue, $19 million.

• 2015-2016 - Swan segment, from Arcadia Avenue west to Bryant Avenue, $16 million.

• 2018-2019 - Alvernon segment, from Bryant Avenue west to Sparkman Boulevard, $15 million.

• 2021-2022 - Campbell segment, from Fremont Avenue east to Plumer Avenue, $16 million.

• 2023-2024 - Country Club segment, from Plumer Avenue east to Sparkman Boulevard, $18 million.

Transportation officials plan to hold meetings this month to explain the plans and answer questions. Details are online at www.grantroad.info or by calling (520) 624-4727.
 
The recently completed UA Student Recreation Center Annex is hoping to achieve LEED-platinum certification:


UARecCenterAnnex2.jpg

Is there such a thing as playing sand volleyball in an environmentally friendly way?
Perhaps so. UA student Melissa Montoya handles a ball on a sand court that sits atop
8 feet of broken rock designed to percolate the site's roof water into the aquifer.
(photo: Dean Knuth)


Inside, out, rec center annex steps up to high, sustainable, 'green' standards
By Tom Beal
ARIZONA DAILY STAR
01.18.2010

The glass-walled addition to the University of Arizona's Student Recreation Center across East Sixth Street from Arizona Stadium is the first fulfillment of the university's pledge to build certifiably "green" buildings. The points haven't been totaled and verified, but UA planners expect the building to keep and possibly exceed President Robert Shelton's promise to meet the "silver" standard set by the U.S. Green Building Council, whose LEED (Leadership in Energy and Environmental Design) ratings have become the touchstone for sustainable architecture. The rec center's Web site prematurely boasts an even higher "gold" rating. Peter Dourlein, director of planning, design and construction for the UA, won't predict, but he'll be surprised, if the building misses that mark. The UA has submitted enough LEED points to qualify for "platinum," the highest rating available. "Silver" is a fairly easy mark to hit, Dourlein said. He said the university's first foray into LEED certification proved to him what he already knew — that the UA had been building to LEED standards long before it signed on to prove the point.

LEED provides third-party verification that a building is "green" in six categories: sustainable sites; water efficiency; energy and atmosphere; materials and resources; indoor environmental quality; and innovation and design. The first category is a slam-dunk, he said. The entire university is a sustainable site — urban in character and served by mass transit, along with routes for bicycles and pedestrians. The building easily earns points for energy use by tying into the UA's underground heating-and-cooling network, which, among other innovative techniques, uses melting ice made during off-peak hours to cool buildings during the day. Those savings are augmented with good design by M3 Engineering and Technology Corp., Dourlein said. The extended rooflines combine with vertical fins to allow the north wall — thick slices of special glass sandwiching a gas layer — to convey light but not heat. Glass walls on the south will heat in winter but be shaded in summer. The east and west walls are mostly solid masonry to block the rising and setting sun. The result is nonglaring illumination of an airy space divided by a mezzanine level where 237 exercise stations fill 30,000 square feet of space.

More innovation lies behind the building. Outdoor seating areas and gathering spots are shadowed by huge overhangs. A pair of sand volleyball courts sit atop 8 feet of busted rock, designed to percolate the site's roof water into the aquifer. A multiuse indoor sports court and a deployment center for the Outdoor Adventures program complete the 55,000 square feet of added indoor recreation space. Rainwater that isn't collected underground will be directed to planting areas on the north and east sides of the building by students in a UA water-harvesting class. Water retention was the most significant added expense, Dourlein said. "That 8-foot pit under the volleyball court really doesn't buy us anything," he said. "It's the right thing to do, a good thing to do, but it doesn't have a payback." Dourlein said the site could have met code requirements by allowing as much water to run off into nearby streets and storm sewers as its previous use — an asphalt parking lot. That asphalt, by the way, was ground up and made part of the compacting soil beneath the slab.

Kurt Wadlington of Sundt Construction said that is one procedure his company wouldn't have done if this were not a LEED project. It's easier and cheaper to rip up asphalt and haul it to the dump, he said. But Wadlington said Sundt, which has built a number of LEED buildings, including a platinum building at Arizona State University, has incorporated many LEED practices in everything it builds. Recycling leftover construction materials has become standard, he said, though his company is probably not as scrupulous about it when LEED points aren't available. For the rec center, more than 75 percent of the waste was recycled, he said. The floors in the exercise area are spongy surfaces made from recycled rubber products. All coverings and cabinets use paint, carpet or adhesives low in off-gassing, volatile organic compounds. Most surfaces are unadorned. Floors are uncovered, polished concrete, except in a couple of offices where recycled carpet was installed.

LEED certification, now a goal for every campus building, will give the UA bragging rights, an area in which it lags behind its partners in the state university system. Both Arizona State University and Northern Arizona University have buildings built to LEED platinum standards, the highest rating. In addition, ASU has five buildings with gold certification. The UA had resisted signing up for LEED certification because of the additional cost, Dourlein said, relying instead on its own sustainability guidelines to deliver the same results. But the cost of LEED certification has come down, he said, and it has become more important for the university. Dourlein said he took a hard look at buildings recently added to the campus in the past 20 years and assured himself that just about all of them would meet LEED standards, given allowances for the unavailability of products and techniques. Dourlein even cited the oldest building on campus as a good example of sustainable building. Longevity alone makes Old Main special, he said. Year after year, for 118 years, it has made use of what green designers call its "imbedded energy cost" — the amount of energy used to create materials and build it. It also employs architectural techniques that might be called innovative today. Old Main's builders couldn't count on air conditioning, so it was given a "big hat" — an expansive roofline to shade its porches and brick facade.

One thing people often overlook in designing and building to LEED standards is the improvement in air quality and the aesthetic feel of the building, Dourlein said. The open, sunlighted spaces, outside views and generous introduction of fresh air in the new rec center should be a welcome change for the center's users, Associate Director Richard Romero said. The now-abandoned work-out space in the original building would get humid and a bit rank at times. The new addition increases fresh-air introduction by 30 percent, and the air is moved around by six Big Ass Fans (yes, that is the name of the manufacturer) with 4-foot blades.


Architects adopt LEED standards
Architects for two Tucson firms, one that advocates for and specializes in LEED buildings and another that has reluctantly embraced LEED certification because of client demand, say the movement is beginning to achieve its goals. "The whole premise of the U.S. Green Building Council is market transformation in the construction industry, in the way people buy and in the way people manufacture," said David Shambach, principal of DESA Architecture.

Shambach said he has talked several clients into going LEED and last year earned gold and silver certification for fire stations built for the Corona de Tucson and Rincon Valley fire districts. "The overall quality of the buildings are better," Shambach said, "and sometimes the added construction costs are almost nothing." In the long run, especially in settings that get 24-hour use such as fire stations, the energy savings of LEED construction pay back any additional cost quickly, Shambach said.

Henry Tom of Line and Space Architecture said his firm resisted certifying its architects as LEED practitioners for years, while winning national awards for sustainability. Last year, Line and Space was named Sustainable Architecture firm of the year by the Arizona chapter of the American Institute of Architects without a single LEED-qualified building, though its Cesar Chavez Library, cited by the national AIA as one of Top Ten Green Projects of 2008, is awaiting certification. "We've been doing sustainable projects without having a LEED program in place for many, many years," said Tom. It is a philosophy adopted by founder Les Wallach 30 years ago, he said, and it hasn't changed, though the firm now has four LEED-certified architects. "It's quite a bit of effort. It costs money to get a building certified, and sometimes you are taking dollars away from the project," Tom said. But he credits the movement with forcing change. "One of the things LEED did do is it made more people aware of creating more-efficient facilities. It is a good avenue for getting the word out to the public," Tom said.

Sundt Construction, which built the Campus Recreation Center and two Tucson fire stations with LEED rules, has found that abiding by LEED construction techniques forces it to do things it should be doing anyway, said Kurt Wadlington, senior project director. Wadlington said the overall cost of meeting LEED standards has also been reduced. Many practices have become industry standards, and green materials are cheaper and more readily available, he said. "The industry is building more wisely overall," he said.
 
A $32M solar power plant is coming to the new UA Science and Technology Park:


Bell Power to build 5MW solar generation plant
Bringing new solar technology to Tucson

By Joe Pangburn
Inside Tucson Business
January 19, 2010

Bell Independent Power Corp., of Rochester, New York, is coming to build and operate a 5MW solar plant with a thermal storage system that will be the first of its kind in the world. The company was announced today (Jan. 19) as the first tenant of the University of Arizona Science and Tech Park's Solar Zone - 200 acres of the park set aside for solar generation, manufacturing and education - announced last week. This solar generation plant will take up 45 acres and will be built at a cost of $32 million. Construction of the plant is expected to begin in late spring or early summer this year depending on the permitting process. The construction of the solar plant will create 75 jobs and the facility will require seven full-time employees for operation. The plant will have the capacity to power 1,500 typical Tucson homes and will begin supplying power to Tucson homes in 2011.

This is a concentrator plant, meaning it will use mirrors to concentrate the sun's rays to heat a tower with oil in it. The new technology, developed by Bell over the last five years, allows for increased production after the sun goes down due to the ability to store the heated material. Tucson Electric Power has asked the Arizona Corporation Commission to approve its plan to purchase power from the plant over a 20-year period. It expects to receive the approval this quarter.
 
A $32M solar power plant is coming to the new UA Science and Technology Park:


Bell Power to build 5MW solar generation plant
Bringing new solar technology to Tucson

By Joe Pangburn
Inside Tucson Business
January 19, 2010

Bell Independent Power Corp., of Rochester, New York, is coming to build and operate a 5MW solar plant with a thermal storage system that will be the first of its kind in the world. The company was announced today (Jan. 19) as the first tenant of the University of Arizona Science and Tech Park's Solar Zone - 200 acres of the park set aside for solar generation, manufacturing and education - announced last week. This solar generation plant will take up 45 acres and will be built at a cost of $32 million. Construction of the plant is expected to begin in late spring or early summer this year depending on the permitting process. The construction of the solar plant will create 75 jobs and the facility will require seven full-time employees for operation. The plant will have the capacity to power 1,500 typical Tucson homes and will begin supplying power to Tucson homes in 2011.

This is a concentrator plant, meaning it will use mirrors to concentrate the sun's rays to heat a tower with oil in it. The new technology, developed by Bell over the last five years, allows for increased production after the sun goes down due to the ability to store the heated material. Tucson Electric Power has asked the Arizona Corporation Commission to approve its plan to purchase power from the plant over a 20-year period. It expects to receive the approval this quarter.

Between this and the Vail Academy, there should be some major construction going on this year in that area. They would be smart to put a retail center or something near that area. I wonder which homes will be powered, Rita Ranch? Sycamore park?
 
So what do you guys hope for Tucson in terms of development in the coming years?

Anything to do with downtown...I think the best and quickest thing to revitalize that area right now is have UA somehow integrated. Have a "downtown campus"... triggering high rise educational and student residential buildings as well as influence local businesses and research firms to complimentary migrate nearby. That will ideally kick start office buildings, retail, entertainment venues, etc...
 
Anything to do with downtown...I think the best and quickest thing to revitalize that area right now is have UA somehow integrated. Have a "downtown campus"... triggering high rise educational and student residential buildings as well as influence local businesses and research firms to complimentary migrate nearby. That will ideally kick start office buildings, retail, entertainment venues, etc...

I agree that UA's presence would make an impact. I would love to see the proposed Sheraton get built. We all know that's not going to happen.
 
So what do you guys hope for Tucson in terms of development in the coming years?

In light of the current and projected economic conditions, it appears that the best immediate prospects for downtown center around the new streetcar, which will encourage denser development, new retail and entertainment businesses, as well as provide a direct link to the UofA campus. It's probably one of the few proposed projects that will secure the necessary funds for construction. The streetcar should also jumpstart more retail and housing development in the Menlo Park/Convento area west of I-10, although the numerous proposed Rio Nuevo cultural attractions surrounding it may be significantly scaled back, if they get built at all.

The current plan for the TCC Sheraton is looking doubtful, but to stop the TCC's perpetual hemorraging of red ink will necessitate its expansion and updating, and an accompanying convention center hotel is crucial for it to be at least marginally profitable. So I'm guessing that a hotel will be built, though perhaps as a scaled-down version.

Other than the new UniSource headquarters, there certainly won't be any new office towers built in the near future, but downtown could see a fair amount of affordable housing construction, particularly around Depot Plaza and the proposed Plaza Centro on the east end of Congress St., as well as other areas along the streetcar route. (Thankfully, all those luxury condo proposals never got off the ground, since the demand for that product never really existed.)

Now that the sprawl machine has bit the dust for awhile, we are already seeing growth in other industries such as biotech and solar, which are capitalizing on the synergy between UA and companies already in the area. Future expansion will be centered mostly in Oro Valley and around the new UA Science and Technology Park on the southeast side.

Also, we shouldn't underestimate the impact that the enormous state and municipal budget deficits will have on both Tucson and Arizona over the next several years. Expected spending cuts will make it challenging to provide the necessary infrastructure and favorable business climate essential to attracting the types of companies that will provide better wages and diversify the mostly one-note economy of growth and housing.
 
Thankfully, all those luxury condo proposals never got off the ground, since the demand for that product never really existed.

What a typical stupid Tucson comment. This is exactly the type of residential development necessary, not only for Tucson, but for all downtown redevelopments. Do you think large numbers of "affordable housing" projects are going to contribute to revitalization of downtown? Are all of those subsidized housing tenants going to be dining in the restaurants, attending entertainment venues, populating the clubs and bars, or shopping at any small retail establishments that might be foolish enough to open downtown?

It's that mentality, shared by the eternally clueless City Council members, that will keep downtown Tucson the abandoned, moribund, decaying place that it currently is.
 
What a typical stupid Tucson comment. This is exactly the type of residential development necessary, not only for Tucson, but for all downtown redevelopments. Do you think large numbers of "affordable housing" projects are going to contribute to revitalization of downtown? Are all of those subsidized housing tenants going to be dining in the restaurants, attending entertainment venues, populating the clubs and bars, or shopping at any small retail establishments that might be foolish enough to open downtown?

It's that mentality, shared by the eternally clueless City Council members, that will keep downtown Tucson the abandoned, moribund, decaying place that it currently is.

Decent points, but why would any person who could afford luxury condos live in Tucson today, or in the last five years when those projects were to be completed? There is no demand because there is nothing complimentary or accommodating for those type of residents. The last residential project downtown were Rodondo Towers back in the 70's I believe...so there isn't much of a residential base to begin with. Students and artists are very important in downtown life after 5pm and a large number of them live in these types of housing. Although not the long-term answer, affordable housing right now for Tucson is something that kicks start life even if it doesn't mean spending $35 a plate. Downtown Tucson has nothing luxury about it today, and until there are 'high-end' bars, restaurants, shopping, and whatnot there wont be the proper clientele.

It's sometimes a story of the chicken or the egg...do you establish luxury living first and then follow with luxury retail and services, or vice versa? With Tucsonans' bleak perception of downtown, you need to show them that there is activity and things to do there before they cough up $500k for a studio.
 
With no bidders at the foreclosure auction, 44 Broadway Lofts--the only downtown luxury condo project that saw any construction--has been returned to the lender:


Bank of the West gets 44 E. Broadway in auction
January 22, 2010
by Teya Vitu
Downtown Tucsonan

Bank of the West, which held the debt on the former U.S. Courthouse Annex at 44 E. Broadway, acquired the skeletal building with no outer walls on Jan. 22 after no bids were made in an auction. Bank of the West, 7225 N. Oracle Road, was ruled the highest bidder through a credit bid of $3,005,063, appointed trustee Mark Barker said. Bank of the West officials were not at the auction held outside the Pima County Superior Court.

This foreclosure sale on a defaulted $2.86 million loan ends a four-year chapter for developer James LeBeau, who has tried to convert the former federal court annex into luxury lofts since buying the fortified four-story structure in 2005. LeBeau’s 44 Broadway Lofts never got beyond designs and stripping off the outer walls on the Broadway and Jackson Street sides.
 
MonteVCorporateCenter.jpg

The first Class A office space to be built in Tucson in over a decade
is rising at 3501 E. Speedway Blvd., with half of it already leased.
(photo: Roger Yohem)


Class A rising
By Roger Yohem
Inside Tucson Business
January 23, 2010

More rare than snow in the desert these days, a crane is flying around a construction site at 3501 E. Speedway. Even more rare is the fact that the crane is feeding steel girders to crews constructing the first Class A office building in Tucson in about a dozen years. The new 40,000 square-foot, three-story office, called Monte Vista Corporate Center, is due for completion in August. It is owned by brothers Al Kivel and Daniel Kivel, two members of the Kivel family, who have a long history of commercial property development in Tucson.

Almost half the space in the new office building already has been leased, said Michael Gross, executive vice president for Tucson Realty & Trust, who is handling the listing. The entire third floor and about one-third of the second floor have been rented to an engineering firm. “We have a landmark tenant, a global engineering firm that wants to remain confidential at this time,” said Gross. “Despite this economy, the timing made sense. The Kivels owned the land free and clear. They are strong financially and local. They’ve had the plans ready for about three years.” Each floor is about 13,000 square feet. Rates begin at $26.50 per square-foot. Chestnut Construction is the general contactor and Eglin/Cohen is the architect.
 
Walgreens.jpg

The old downtown Walgreens building is getting a facade redo that should be finished this summer.
The county is in talks with the university to convert it to space for architecture and urban design students.
(photo: Jill Torrance)



Idle building downtown weighed as UA class space
by Becky Pallack
Arizona Daily Star
January 27, 2010 12:00 am

University of Arizona students could be taking classes in a downtown Tucson architecture and urban design studio as soon as this fall. The UA is in talks with Pima County for a deal that would put the university in the former Walgreens space with a $1- per-year lease. Architecture college Dean Janice Cervelli called the space at North Stone Avenue and East Pennington Street a "fabulous building in a good location." It's near bus stops, and someday streetcar stops, and there are parking garages nearby, she said. "It's a natural for us because we teach urban design, urban revitalization, sustainable design," Cervelli said. "It's a great opportunity for the students to watch the revitalization process occur and be part of it. We can lend a lot of our expertise, as we have for many years, in the revitalization efforts downtown."

Ideally, Cervelli said, subject experts who already work downtown would teach the classes as adjunct faculty. But some faculty members on campus also are interested in teaching downtown, she said. "We think that would be a huge benefit to the downtown," said Reid Spaulding, facilities management director for Pima County. The UA is assessing the costs of operating the building and looking at security considerations, said Bob Smith, the university's associate vice president of planning, design and construction. If the deal goes through, the UA would take over operations and maintenance of the building without having to buy it. The building needs renovations. Smith said the old mechanical and electrical systems are problematic, though Spaulding said they are acceptable. The exterior facade is in bad shape, but the county wants to "restore that building to prominence," Spaulding said. Scaffolding is up as a contractor works on installing a glass-reinforced concrete facade that will look like the original cast stone. The work should be finished this summer, Spaulding said. The county bond project is not part of Rio Nuevo.

While the building has some historical significance, it doesn't meet historical registry requirements because it's been changed too many times through the years, Spaulding said. No private tenants have expressed interest in the space for two years. So if the UA doesn't take the deal, the county probably would put the building back on the market, Spaulding said. The Walgreens closed in 2004. The move is part of a larger plan for the UA to have a presence downtown. But that's barring any more major state budget cuts. The economy will dictate the moves the UA can make, said Cervelli, a master planning specialist who is leading the downtown discussion for the university. "Were we in better financial times, heck yeah, we would be moving on it much more quickly," she said. "Downtown's got incredible potential."

The UA's master plan identifies some departments that could fit well downtown. Public administration is a natural choice because downtown is a center for government employees, Cervelli said. There also is talk of creating a media and communications center downtown by locating several groups in one space. Ideas include Arizona Public Media, Cox Communications, the public access channels and some film production programs. The combination would create synergy for investment and creativity that would help all of the groups advance, Cervelli said. Other options include continuing education programs in demand by those who work downtown. The UA has been looking for other downtown locations but isn't actively reviewing any facilities other than the former Walgreens, Smith said. The UA doesn't have the money to take advantage of available space downtown right now, he said.


DID YOU KNOW
The 1928 Spanish Colonial Revival building at North Stone Avenue and East Pennington Street was designed by noted architect Roy Place. Place also defined the look of the University of Arizona campus as its chief architect.
 
Regents approve Arizona Stadium renovation
By Becky Pallack and Patrick Finley
Arizona Daily Star
January 28, 2010

The $85.7 million renovation of Arizona Stadium's north end zone was approved today by the Arizona Board of Regents, allowing the Wildcats to begin raising private funds to pay for it. The three-pronged plan will move the scoreboard from the north end zone to the south, clearing the way for a structure that will hold football offices, about 5,000 seats and a luxury loge area. Arizona Stadium's lights will also be replaced, and Jimenez Practice Field will be enlarged.

Construction ideally would begin in spring 2011, UA officials said last week. Private donations will pay for the project. In November, the UA received a $10 million gift from Jeff and Sharon Stevens, and that money has been earmarked for the stadium project.
 
RFP's are out for four more ADOT-owned downtown warehouses, as local artists prepare for new landlords and higher rents:


Proposals, Please
Plans to save the Steinfeld Warehouse remain on track—but some are not convinced that's a good thing

by Dave Devine
Tucson Weekly
January 27, 2010

Plans to rehabilitate and re-occupy the historic Steinfeld Warehouse are back on track after a brief derailment. But once restored, will the building be affordable for artist tenants? Last October, the City Council approved requests for proposals (RFPs) on four buildings in Tucson's downtown Warehouse District: the Steinfeld building; the Citizens Transfer warehouse across west Sixth Street from the Steinfeld; and the structures at 191 and 197 E. Toole Ave., the former currently occupied by Skrappy's youth collective. The RFPs called for selling the two buildings on Toole and the Steinfeld warehouse to a "nonprofit arts-related organization" for "arts-related" uses. The Citizens building would be turned over to a similar group to be the master leaseholder.

After the City Council approved the process, all that remained before the RFPs went out for public response was for the city to finalize some property-transfer paperwork with the Arizona Department of Transportation (ADOT), which owned the buildings. Then Steve Kozachik, the new Ward 6 councilman, got involved. On Jan. 5, he asked that the RFPs not be issued until the new City Council could discuss them, a proposal the rest of the elected officials approved. "I wanted to open up the process as a way to maximize our revenue," Kozachik says. But then Kozachik changed his mind. "I'm not interested in bumping the kids from Skrappy's," he remarked early last week. "I'd be an asshole if I did." As a result, at the Jan. 20 meeting, the City Council directed the RFP process to proceed.

The city hopes to get $91,000 for the Skrappy's building, and $160,000 for the structure next door. The Citizens building will be leased for around $4,000 per year, with the vacant Steinfeld Warehouse sold for $1. The catch behind that $1 price tag: It could take $1.5 million or more to renovate the Steinfeld Warehouse into an acceptable condition for occupancy. Built in 1907, the structure is in need of numerous repairs. Despite the high rehab costs, City Councilwoman Regina Romero defends the decision for the city to acquire the Steinfeld building from ADOT. "We thought about bookends on Toole Avenue," she explains of the choice, "and looked at leveraging private investment in between." Despite the high rehab price, Marvin Shaver, president of the Warehouse Arts Management Organization (WAMO), believes the Steinfeld Warehouse can be restored, with rents kept reasonable. "The rents (artists) are paying now (to ADOT) are unrealistic," Shaver says of low rents at other downtown warehouses owned by the state. "They'll have to go up but can still be affordable. ... I'm comfortable WAMO can do the (Steinfeld) renovations necessary and keep rents affordable, which means below market rates."

David Aguirre was the master leaseholder for the Steinfeld Warehouse until he and other artists occupying the building were forced to leave in 2007. He is also the longtime manager of the Citizens building and the warehouse immediately north of it. Aguirre agrees the Steinfeld building can be restored based on the revenue stream that future rents would generate. He's developed a possible layout for the huge structure that would include 30 artist studios, a café, performance space and three galleries. "It would be a higher concentration (of tenants than before)," Aguirre suggests, "and the entire use of the basement." If that's done, he believes rents for the property can be kept affordable.

Congressman Raúl Grijalva and Councilwoman Romero are also exploring other funding options for the Warehouse District. In a December letter, Grijalva outlined several possible federal revenue sources while writing: "My office is prepared to request additional funds to assist in making the Historic Warehouse Arts District a reality." Grijalva's Washington, D.C., office confirms that he will sponsor a congressional earmark to obtain money to rehabilitate the Steinfeld Warehouse. However, the city must submit information supporting the request by the end of February in order to have it considered.

Irrespective how that effort turns out, Shaver says WAMO plans on submitting responses on all four RFP properties. "We'd be an umbrella organization," he explains. For his part, Aguirre indicates he'll probably work with WAMO on its Steinfeld proposal—but he adds that he'll submit his own response on the Citizens building. Aguirre says he wants to include the warehouse just north of the Citizens building in his response to the RFP. Even though it is slated for eventual demolition to make room for the proposed downtown Links roadway, Aguirre hopes to make improvements to it in the interim.

Meanwhile, Dwight Metzger, of the Gloo Factory print shop, is renting his space on Toole Avenue from ADOT and is worried about his future. He's aggressively trying to raise enough money to find a permanent, affordable space before his present location is sold by the state. A member of WAMO's board, Metzger questions whether the city's decision to acquire the Steinfeld building from ADOT was correct. Another option, he explains, was to obtain another building that is presently occupied: "Solar Culture has lost control of its destiny," he's says of the building on Toole Avenue that was recently sold to businessman Steve Fenton (See "Toole Avenue: For Sale," Currents, Nov. 12, 2009), "and other artists are facing eviction (from ADOT owned buildings)." As a result, Metzger concludes: "I'm speculating (the city's decision) was regrettably a mistake."
 