^If you read the above posts, the city will be issuing an RFP for the hotel within the next 30 days, so it's in the works.

On another note, City Manager Mike Hein remains convinced that Tucson can't support (or afford) a new arena that would hold more than 12,500, saying that construction costs would nearly double if a second concourse were added for more seats:


Hein letter spells out one reason Cats won't move downtown
Tucson Citizen
by Teya Vitu
04.18.2007


Tucson City Manager Mike Hein's letter issuing a "qualified yes" to a scaled-back University of Arizona science center at Tucson Origins also discussed a new downtown arena and university housing in forthright terms. Tuesday, Hein sent a letter to UA President Robert Shelton giving initial acceptance to the university's idea to build a combined science center and Arizona State Museum for $130 million.

In the letter, Hein directly addressed community musings about why the new arena will have only 12,500 seats and why UA doesn't intend to move its sports events to a downtown arena. "As we both know," Hein wrote to Shelton, "the cost of an arena above 13,000 seats almost doubles because of the required second concourse. Although 12,500 seats may cost $130 million, 17,000 seats would cost over $250 million."

Hein acknowledged Shelton and UA Athletic Director Jim Livengood's desire to keep arena sports on campus. Even if UA men's basketball home games were to move downtown, Hein sees little justification for a larger arena. "From the city's perspective, our market analysis does not suggest that a 17,000-seat arena would be well utilized by our community outside of Wildcat games," Hein wrote. "There would be a cavernous feel for all events outside of those 16 UA Wildcat home games."

Hein also said new student housing scattered across town puts "significant stress on some of our most cherished and historic neighborhoods." "I continue to suggest that now is the time to explore dense faculty, graduate and other student housing in a downtown environment linked to the campus by the modern streetcar," Hein wrote. "I believe there is a unique partnership to be made in this respect."

Hein suggested students and university employees living downtown would help increase tax increment financing funds - the lifeblood of the Rio Nuevo project. Hein's "qualified yes" for the science center-state museum hinges upon working out financing, land and other infrastructure-related issues as well as winning a City Council majority vote, set for May 8.

Although Hein is "inclined to recommend to the City Council to commit $130 million" to the science center complex, he also is inclined to ask for a university match, perhaps in the 3-to-1 range, meaning the city's $130 million results in more than $300 million in development around the science center at Tucson Origins. Hein wrote: "We should convene to discuss mutually beneficial financing structures, including third-party participation through ground leases and other mechanisms to take advantage of the opportunities for additional commercial, retail, housing and other facilities" at Tucson Origins, south of Congress Street and west of the Santa Cruz River.
 
So..........is the hotel proposal still being discussed or what? Why hasn't any new information been put out! Everything is so slow in Tucson!

I saw the mayor on PBS this week and he agreed with the obvious: EVERYBODY says the hotel is the critical component. So yes, it's definitely still part of the current plan.
 
The city wants developers to submit their creative, TOD solutions for a 14-acre parcel just west of I-10, which will include the western terminus of Tucson's new streetcar line:


Streetcar line, vibrant hub envisioned on now-vacant lot downtown
by TEYA VITU
Tucson Citizen
04.25.2007

They are 14.3 acres of packed dirt and scrappy brush, not eye candy in any way. Yet Rio Nuevo planners bank on this acreage becoming a gem for Rio Nuevo in the next four to six years.

This city-owned plot, south of Congress Street and west of the Santa Cruz River, is destined to become a mixed-use marvel if developers can dream up some creative way to marry housing, shopping, entertainment, open space and a streetcar line. Creativity and innovation is just what the city's downtown housing planner, Ann Vargas, wants as she looks for developers to step forward with ideas. June 27 is the deadline to submit a request for qualifications.

The RFQ process goes far beyond determining if a developer has the capability to carry out a 14-acre project. Whoever ultimately wins the project will have to nail the spirit of Rio Nuevo and get really chummy with the Menlo Park Neighborhood Association. Incorporating the neighborhood's desires - which hinge on reflecting its historic architecture and affordability - is required, Vargas said.

For its part, the Menlo group has drawn up a five-page, single-spaced position statement liberally sprinkled with the word "shall." Additionally, the project has evolved into a "definite transit-oriented development," which will be bounded on the south and west by the modern streetcar linking the West Side with the University of Arizona.

The submitted RFQ will detail capabilities and also include a conceptual plan of what the developer intends to propose. In other words, a rough, rough draft of a formal proposal. But with all these requirements comes a mostly blank slate for what the city wants built on this land, neighboring the Tucson Origins project.

"The objective is fairly undefined," Vargas told a group of developers last week. "We are deferring to the innovations of the developer community. We are not prescriptive of how the land needs to be laid out." Vargas elaborated in an interview: "Isn't that how you get the best and brightest? You give them parameters and opportunities at the same time. You're inviting evolution."

Attending the conference Vargas put on last week to spell out the RFQ process were developers:
● Ron Schwabe of Peach Properties, involved in the Martin Luther King Jr. Apartments rehabilitation and the 44 Broadway Lofts
● Roger Karber of Centro Nuevo Partners, involved in Hotel Arizona expansion
● Jerry Dixon and Adam Weinstein of Rio Development, involved with the Mercado District of Menlo Park, next door to these 14 acres
● Scott Brown of Western Housing Solutions, new to downtown
● Tom Capp of Gorman Co. of Madison, Wis., another downtown newcomer
● Ian Stuart at Tucson Realty & Trust, representing an unnamed out-of-state developer

About as many Menlo Park residents attended. "We're really looking forward to creating a vibrant public space for the community," said Matt Skroch, who chairs Menlo's vacant land committee. The Menlo Park Neighborhood Association played an integral part in shaping the Mercado District project, which has 16 houses under construction out of 240 planned just east of these 14.3 acres. The association will play just as active a role here with three neighborhood residents evaluating the requests for qualifications alongside four city staffers.

Bob Rodriguez, the neighborhood's special projects coordinator, encouraged developers to stroll through Menlo to get a feel for what's there. "Take half a day. Get to know us. I want you to know we care," Rodriguez said.

Vargas expects to have a short list of qualified developers in August. Formal proposals will be presented in November and, in December, she intends to present the preferred development team to the City Council.
 
The city's latest study says that needed infrastructure improvements for downtown and Rio Nuevo could total $381 million, but City Manager Mike Hein says it won't all come from TIF monies and can be spread over 20 years:


Run-down Downtown to cost $381 million
Upgrades needed to lure 1st-class development

By Rob O'Dell
ARIZONA DAILY STAR
04.27.07

Upgrading Downtown's aging streets, sewers, water and utility lines, and sprucing up the buildings and sidewalks to a standard that would attract world-class development will cost $381 million. That's the conclusion of a public-private panel commissioned to recommend how to make Downtown more accommodating to the development envisioned for Rio Nuevo over the next 20 years. That new development, including a new arena and hotel, numerous condo and retail developments and a new museum district on the West Side, carries its own $1 billion price tag in taxpayer and private investment.

Although construction on most projects is still years off, the proposed Downtown infrastructure upgrade would pretty much tap out the $550 million the city expects to get from the from the Rio Nuevo special taxing district. Projects the city is known to be actively working on total about $535 million, not including interest on any bonds the city must sell. Michael Keith, the Downtown developer heading the panel, and officials in the city manager's office stressed the numbers are preliminary, and will likely be revised before going to City Council on May 15. City Manager Mike Hein said while he feels the $381 million is on target, not all the money would come from the city's Rio Nuevo redevelopment district.

Keith said he thinks infrastructure improvements — which include parking, upgrading electric and sewer lines, moving overhead electric lines underground, funding a building rehab program for Downtown business owners and adding untold amounts of landscaping, lighting and other amenities — could ultimately be done for less. Hein anticipates about $170 million of the total $381 million would come from Rio Nuevo, with about $70 million of that going for parking structures and the rest for streets and other infrastructure. The spending would be spread over 20 years. Hein said the rest of the money would come from construction sales taxes generated by Downtown development, revenue bonds issued from parking structures, city general funds and from the private sector. He said some of the upgrading costs will be borne by the utilities, including Tucson Electric Power and the Pima County Wastewater Department. Joe Salkowski, spokesman for TEP, said if Downtown develops the way some envision, "We will need to upgrade our infrastructure."

The cost of upgrades would be borne by TEP and its customers, Salkowski said, but the cost of moving overhead wires underground would most likely be paid for by either developers or the city. Additionally, he said the cost of moving wires for the proposed Modern Streetcar would be paid by whoever pays for the streetcar to be built. "The facilities we have in place are nearing their design capacity," he said. "With significant growth Downtown we would need to upgrade to fill needs."

Hein said the private sector needs to step up as well. In the $381 million plan given to the city Thursday, Hein said only $1 million would come from private developers, an amount he said is "inadequate." While the Keith plan is still in draft form, subject to revision, Hein said $381 million is a real number. "I don't think the $381 million as a total number is unreasonable at all," he said. Keith said the plan calls for $100 million to improve the streetscape, to create a Downtown that will become an attractive destination. He said that need is demonstrated by the absence of families with children walking down Broadway and Congress, something he said he hasn't seen in decades.

In addition to a massive makeover of the Downtown everyone now sees, Keith said the plan would focus on rehabbing the city's alleys with landscaping and lighting to make them pedestrian walkways that can be used all day and night. Cecilia Campillo, a South Side resident with a keen interest in Rio Nuevo, said the plan sounds wonderful but she questioned who would pay for it all. Campillo said the rehab of existing buildings should be done quickly to add energy, color and cleanliness Downtown, so it stops being a "ghost town" and Rio Nuevo starts happening. However, she said, some of the expenditures such landscaping can wait several years before being completed. "Infrastructure, as a lay person, means some of these things but not all of these things," Campillo said of the wish list.

Keith said the study was funded by $40,000 in private sector funds, augmented with staff time and materials from the city and county. "As a private sector guy, this is the first time in a long time I've thought the the public/private partnership is really going to pay off," Keith said. "There is a lot of work that needs to be done."



Current Rio nuevo spending plans
Tentative plans for how the anticipated $550 million in Rio Nuevo Tax Increment Financing funding should be spent. The figures represent only Rio Nuevo funds. Another $475 million will be needed to complete the projects — about half of which will come from other taxpayer funds and half from private fundraising.

$130 million - UA Science Center and State Museum

$100 million - Streets, water lines, sewers and utilities

$72 million - Hotel and arena

$70 million - Parking garages

$54 million - Tucson Origins Historic Park

$45 million - Arizona Historical Society Museum

$30 million - Tucson Convention Center remodeling

$11 million - Fox Theatre restoration

$10 million - Administration and planning

$7 million - Depot Plaza

$3 million - Presidio Wall restoration

$3 million - Rialto Theater and block restoration

GRAND TOTAL (so far): $535 million*

* Not including interest on bonds, Tucson Children's Museum or the Town West brew-pub and condo project.
 
^all these projects remind me of Phoenix's long-term strategy to simply throw as many projects as possible into a pot, bake, and then wait for the mouth-watering result. The problem is that Phoenix is still waiting 35 years later.

Force-feeding downtowns with lollapalooza projects can't by itself substitute for a vibrant city center. There has to be a reason people want to be there apart from an arena, or expanded convention center. For the person on the sidewalk, there's not much reason at all. Tucson is now paying the price for its attempt at a wholesale makeover from the 1960s when it destroyed much of its historic barrio. Now instead of Santa Fe-like charms, there are downtown Phoenix-like dead zones.

The irony is that for all its shortsightedness, Tucson still has some wonderful architecture in and around downtown. But the learning curve here seems nearly flat. So Aviation Blvd threatens the nascent warehouse district while overpriced condo projects fail to lure new residents.

My recommendation would be for Tucson to concentrate on one street (probaby Congress) and knit together the fragments into one real urban streetscape. Combine that with 4th Avenue and let downtown shows its true strength. As Tempe showed on Mill Avenue, a pedestrian-scaled street will do much, much more for a downtown than Build-It-And-They-Will-Come mega-projects. Indeed, Mill Avenue is now reinventing itself upward, not from government inducements but from private-market demand.

City government usually does not do urban curating very well so instead we get the usual suspects of urban "revitalization". There will be the customary invocation of "synergy" and the typical reality of inertness. But the seeds of magic are already there if the city fathers would only look. They're in the still extant storefronts - mostly abandoned - along with the crooked streets and historic artifacts. Yes, it's bad now but that's because Tucson wanted to play Big City more than a real place. The real place is not much but it's where the heart is. Nurture that, and the patient may recover.
 
Thank you Soleri, your perspective is always refreshingly frank, and definitely correct with Tucson. I went to school there, and Tucson is SO incredibly frustrating for having all the elements Phoenix doesn't have in terms of a soul. However, it feels as though the goverment there intentionally neglects this and looks to its neighbor to the north for inspiration. If it really wants to succeed, rather than looking to Phoenix and complaining about what it doesn't have, it should just nurture the distinct aspects which make it unique, and people would come in droves to see a unique city and one that reflects the true heart of the Sonoran desert and Arizona.

The downtown has a ton of potential, and if UofA had the vision of ASU and made moves to expand into downtown(while respecting the urban structure and history), Tucson could within 5 years have a true heart, Rio Salado or no.
 
It is sad to watch Tucson follow in Phoenix's footsteps, thinking that a few mega-projects are the key to jump-starting its moribund downtown, rather than weaving together the already-existing elements that would make people want to spend any significant time in the area, rather than just attend a concert or go to a museum, then quickly drive home to the foothills. The gems are right under their noses, but seem to be habitually ignored.

A troubling but recurring pattern in downtown redevelopments is that the actual street-level experience tends to be overlooked, somehow expected to come together as if by magic. Whereas with the proper planning--particularly incentives for small businesses--an organic and vibrant growth can evolve naturally, attracting new businesses and developments, thereby avoiding big financial handouts to lure developers into the urban renewal process. However, politicians love to back the big, splashy projects as a panacea for what ails central cities; but in and of themselves, they cannot deliver the goods. And for metropolises that continue touting their single-family-home suburban lifestyle to attract residents, public support for Smart Growth and a more urban fabric will be a tough sell for a long time to come.
 
I have been following your threads for awhile now, and wonder what opinions you may have on the recent proposal for COT to lease property along the 6th Avenue Corridor and sublease back to the organization that lost the YMCA to make way for the Lofts at 5th Avenue.
The properties in question are on a highrise footprint and adjacent to the Pennington Garage. The Arizona (1928)to The Sears (1940)
The plan includes an approved 200ft TRE, providing outdoor seating along the Eastcape.
 
What is going on with the lofts on 5th AVE? I was driving around that area about a week ago and I see nothing happening? It's been a big hole in the ground for 6 months (maybe more??) and I've heard zero on when or if construction would happen. The project is dead. Also, has anyone found any renderings for the new court complex on Stone Ave?? Just what Tucson needs huh...another court building.
 
Last heard, most of the permits have expired on the Vantage Point/Long Realty project. Not sure about the grading one, but it's easy enough to re-instate.
The ad seems to be running with an 11 m plus pricetag.
Mr Walker has indicated the grading will start in June. This year?
 
Downtown hotel fuels interest from 25-30 developers
City wants project built on public land in TCC complex

by TEYA VITU
Tucson Citizen
05.04.07

Owners of major sports facilities and hotels around the country have called City Hall in the past month about possibly building a downtown hotel in the Tucson Convention Center complex. Jaret Barr, assistant to City Manager Mike Hein, fielded calls from 25 to 30 developers from Los Angeles, New York, Hawaii, Hong Kong and elsewhere across the country and globe, he said. He would not name any of the interested parties beyond describing some as "sports-oriented, involved with teams and facilities."

The city put out a request for qualifications (RFQ) April 27 to find the most suitable developers to submit a full proposal. Local newspaper accounts about the City Council's commitment a month ago to build a hotel were electronically distributed far and wide, generating calls from developers. "We've been fielding more and more calls as it spirals out on the Internet and through consultants," Barr said.

The RFQ deadline is June 1 and the city expects to have a short list of preferred developers by June 15, at which time a request for proposal will go out. The deadline for proposals is Aug. 17 with City Council approval slated for September or October. Along with demonstrating the ability to build a hotel, the RFQ also calls for a preliminary concept plan from developers. The city is offering 40.8 acres to work with that includes the TCC and its parking lots, along with the parking strip along Interstate 10.

Other than asking for a "four- or five-star" hotel, the request is somewhat open-ended about whether the proposal should include arena or convention center concepts. "People are asking, 'What are you really expecting to see? Just the hotel?' '' Barr said. "People can propose what they want."

For example, Tucson developer and gem show owner Allan Norville a month ago offered his own proposal including an arena, exhibition hall, retail areas and possibly a hotel, much of it on land he owns between two city parcels outlined in the city RFQ. And the Hotel Arizona expansion proposal has a head-start with an initial proposal to add a 30-story tower and more than double capacity with a preliminary commitment from Hilton. "We're not worried about competition," said Tom Tracy, a consultant to the Hotel Arizona project. "We are assembling the strongest team imaginable and we're prepared to compete at the highest level."

The request for qualifications/proposal comes into play because the land is city-owned and the hotel proposal will likely ask for public financing. How little or how much public financing is requested will be considered when proposals are ranked by preference, Barr said.
 
In addition to the three-year project to widen I-10, the 4th Ave. underpass will be closed for rebuilding through December 2008, adding to Tucson's traffic woes:


4thAveUnderpass-rendering.jpg

This illustration shows how the Fourth Avenue underpass,
looking south to downtown, will look after work is completed December 2008.



Underpass work will overload commuters
Fourth Avenue, I-10 projects to cause hassles

by GARRY DUFFY
Tucson Citizen
05.05.2007

If you're planning to use the Fourth Avenue underpass to bypass the hassles that will start with the Interstate 10 widening project next month - fuhgeddaboudit! The long-delayed city project to build a new Fourth Avenue underpass that will accommodate motor vehicles, the Old Pueblo Trolley and cyclists is to get under way later this month - complete with detours on downtown streets that will have motorists fuming about the simultaneous timing of two major road projects. "If we waited until Interstate 10 was completed, no work would be done on the new underpass for three years," Jim Glock, director of the Tucson Department of Transportation, said Friday.

The work will be done in three phases starting May 14 with relocation of utilities and rephasing of traffic signals that will take four to six weeks. After that, demolition of the old overpass will begin - as will the major detours of traffic away from the Toole Avenue, Fourth Avenue and Congress Street areas. The Fourth Avenue underpass will be closed until December 2008. When it reopens, the new underpass will accommodate two-way motor vehicle traffic, the trolley which will be extended into the downtown area, cyclists and will have sidewalks on both sides for pedestrian safety, Glock said.

Atop the underpass will be a cycling and pedestrian crossing that will link the downtown bicycle and pedestrian pathway that crosses Broadway at the Diamondback Bridge. That pathway is being connected all the way east to the Pantano Road area, work that includes a new Basket Bridge over Euclid Avenue south of Broadway. The pathway will be extended west from its current terminus downtown to the Ninth Avenue area.

The $26 million projected cost of the underpass project is $5 million less than a previous design, Glock said. The previous design was abandoned for two reasons: skyrocketing costs mainly because of explosive materiel prices and merchant complaints that the design would eat up valuable real estate better suited for development as part of the city's Rio Nuevo downtown rejuvenation project.

The earlier design also called for steep grades for streets and sidewalks extending to the Congress Street area. It raised hackles among downtown business leaders and developers. "We did not realize what the implications of those grades would be," Donovan Durband, executive director of the Tucson Downtown Alliance, said Friday. "This design has more land for development," he said.

The timing of the work to coincide with the Arizona Department of Transportation's three-year I-10 widening is unfortunate, Durband said. "But it has to happen. Let's get it over with," he said. The city will recoup some of the underpass project cost by selling valuable land set aside for the previous design but no longer needed for the project, Glock said. Project progress and costs will be checked under a contractor-at-risk deal with Sundt Construction that provides both rewards and penalties for the contractor as an incentive to stay on schedule and budget, Glock said.

Another reason for starting the Fourth Avenue underpass replacement involves another major project on the boards: completion of the Barraza-Aviation Parkway from its current terminus at Broadway, north on Stevens Avenue, to connect with Sixth Street via Fifth, Sixth and Seventh avenues. That project, part of the city's overall Downtown Links traffic circulation plan, is to disperse traffic heading to Interstate 10 from downtown streets that currently are clogged, especially during morning and evening peak drive times. The parkway completion project won't start until 2012, Glock noted. "The underpass needs to be completed before we begin Downtown Links," Glock said.
 
ThePost-rendering.jpg

Prices at The Post will start at $230,000 for a 650-square-foot condo.


Construction of The Post set to start in July
by TEYA VITU
Tucson Citizen
05.16.2007

The Post loft project downtown is expected to begin construction in July on Congress Street between Scott and Stone avenues. The deed of ownership for the former Thrifty Block passed Monday from Tucson to Bourn Partners, project manager Oscar Turner said. First, a 10-foot hole will be dug and then downtown's first crane in the 21st century will arise. The six-story, 52-unit The Post should be ready for residents before the end of 2008, Turner said.

Bourn obtained the Congress Street site for $100 as part of a Rio Nuevo development agreement to encourage downtown housing. Bourn had to fulfill several requirements since April 2006 to acquire the land. This included delivering a concept plan, doing preliminary marketing, building a list of interested loft buyers, getting financing approved, obtaining a foundation permit and leaving a $15,000 deposit with the city. Bourn expanded the plan from five stories and 40 units.

Turner has collected an undisclosed number of reservations from potential buyers. He said Bourn will go under contract with buyers in June. The Post, 20 E. Congress St., will have lofts ranging in size from 650 square feet to a 2,200-square-foot penthouse. Prices will start at $230,000 and escalate to $1 million-plus. "What we're trying to do is have a bunch of units under $300,000 and a bunch of units under $400,000," Turner said.

He described the design as "crisp, contemporary, that's sympathetic with the traditional design of the street." That means a brick presence at street level with "lots of glass" above. The architect is Tucson-based Gromatzky Dupree & Associates, and the project will be built by Lang Wyatt Construction, based here.
 
With the $350M Rainbow Bridge concept a distant memory, City Manager Mike Hein's latest proposal to spend Rio Nuevo's TIF monies has the city picking up the whole $130M tab for the UA Science Center and Arizona State Museum. Will this be the plan that finally gets approved and built? Stay tuned....



UAScienceCenterAZSt.jpg

The proposed 125,000-square-foot combined UA Science Center/Arizona State Museum project
as part of Rio Nuevo. Putting the two institutions together makes sense, the UA says.


Rio Nuevo's latest: $100M Science Center
By Tom Beal
ARIZONA DAILY STAR
05.18.2007

A $100 million Science Center with planetarium, Imax-style theater, permanent exhibits and space for traveling national exhibits would anchor the cultural plaza of Rio Nuevo under the latest plan sent to the Tucson City Council by City Manager Mike Hein on Thursday. The Science Center would share space with a $30 million Arizona State Museum of anthropology on the east side of the cultural plaza, along the banks of the Santa Cruz River south of West Congress Street. The city would foot the entire $130 million cost.

On the west side of the cultural plaza the city would build:
● An $80 million Arizona History Museum, which would house historical exhibits, the offices of the Arizona Historical Society and an "e-library" with 100-150 computer terminals and some books and other materials. The city would contribute $50 million to those two programs.
● A $20 million Tucson Children's Museum, with the city footing half the cost.

Hein also asked the council to commit:
● $102 million for an arena, expansion of the Tucson Convention Center and a convention hotel.
● $170 million for parking, infrastructure and streetscape improvements Downtown.

The plan was given a unanimous and enthusiastic endorsement Thursday by members of the City Council's Rio Nuevo/Downtown Subcommittee, which includes council members Jose Ibarra, Steve Leal and Nina Trasoff. The full council will review the plan Tuesday. Leal said he was never sure he would be in his seat when Rio Nuevo's musical-chair game stopped. "I'm relieved," he said, "and I'm so excited."

Ibarra said he had favored the grander plans for a Science Center but was happy that "we're finally going to bring the U of A to the neighborhood." Interesting the children of Tucson in math and science is the most important aspect of the plan, he said. "All of a sudden it's like it's all coming together," said Trasoff. She added that "it's important to note we're not committing every penny," after Rio Nuevo Director Greg Shelko told the council that about 9 percent of the total remained to be doled out.

Leal said he already has plans for that money — a Latino Cultural Center and Downtown arts district, utilizing the Carnegie Library that the Children's Museum will abandon. Trasoff said she'd like to save the Steinfeld Warehouse, which houses a number of artists, but said after the meeting that those decisions will wait for later.

Coupled with $66 million already spent or obligated to projects such as the Depot Plaza and the Tucson Origins Park, Hein's plan would leave only $53 million of the $581 million the city expects to be able to spend from tax-increment-financing money available to it from the Rio Nuevo district. The district, enabled by the Legislature and approved by local voters in 1999, allows the city to keep increased state sales taxes and use them for redevelopment of the area.

The Science Center, at one time proposed as a $350 million "rainbow bridge" that spanned the river and Interstate 10, had been the major impediment to planning the rest of the cultural attractions. It has now been whittled down to the smallest possible size that would allow the university to break even on operating costs and admissions revenue, said Leslie Tolbert, UA vice president whose duties include economic development. Putting it next to and under the same roof as the Arizona State Museum, she said, will "make ties from the past to the present to the future in a way we wouldn't have done under the old scheme."

Bob Smith, director of Facilities Design and Construction for the UA, said the Science Center will be ready to open by summer of 2011. The Flandrau Planetarium on campus will close between now and then, with its programs transferred to the Science Center, he said. The Arizona State Museum will retain its venerable brick buildings just east of the campus Main Gate but transfer many of its exhibits to the Rio Nuevo site, he said. Many of the museum's artifacts are stored rather than displayed, and Smith said the move will allow the museum to "more than quadruple its exhibit space."

The Arizona Historical Society will sell its museum and headquarters at East Second Street and North Park Avenue to raise money for the new museum, said Bill Ponder, the society's chief administrative office. Ponder said the society hasn't gotten an appraisal of the site, adjacent to the UA campus, but Tolbert said it would be very valuable to the university. Ponder said the current museum's entryway, the 1883 stone portal from the first St. Agustín Cathedral, will be moved. "It goes where we go," Ponder said. "It has an exhibit number," said AHS Executive Director Anne Woosley, "and everybody asks about it." Woosley said the goal is to open the museum in time for the state's 100th anniversary on Feb. 14, 2012.

The Tucson Children's Museum would move from its present home in the old Carnegie Library on South Sixth Avenue Downtown, said Michael Luria, president of the museum's board. The museum needs to expand, he said, and that historic structure, designed by noted architect Henry Trost and opened in 1901, won't allow it. Luria said the new museum would be 40,000 square feet with 24,000 square feet of exhibit space, more than double the 11,000 square feet currently devoted to exhibits. Luria said the museum's attendance grows yearly, hitting 85,000 visitors last year. With a new building and the draw of the other attractions at the Rio Nuevo site, he said, they expect to attract 150,000 annually.
 
Last edited:
A UofA professor argues that the reconstruction of the Convento and Presidio wall, as part of the new Tucson Origins Heritage Park, is an inauthentic way of representing the historic structures. (FYI: the dedication ceremony of the partially rebuilt Presidio San Agustin del Tucson was held downtown on May 19; the groundbreaking of the San Agustin Mission Complex and Gardens on the west side of downtown, where the Convento is to be rebuilt, will be held on June 2.)



PresidioReconstruction.jpg

partial reconstruction of original Presidio



ConventoandGardens-2.jpg

rendering - new Convento and gardens


Guest Opinion: Convento reconstruction inauthenic, inadvisable
By R. Brooks Jeffery
Arizona Daily Star
05.23.2007

I am against the reconstruction of the Convento (and the Presidio wall) because it is inauthentic. The exact location of the Convento is not known, the building materials and construction systems will not be authentic to the original 18th-century building, and the spatial experience of the building will be compromised due to contemporary accessibility standards, not to mention other code requirements, such as fire sprinklers and air conditioning. All that will be left is a full-scale model of the building — a Disneyland-esque icon representing the political and economic values of the 21st century more than the cultural and technological values of the 18th century.

David Yubeta, the pre-eminent adobe restoration expert who works for the National Park Service's Tumacácori National Monument and who coined the term "designer ruin," was asked to work on these projects for the city of Tucson. He told me that he chose not to, because the projects were not incorporating authentic building materials, nor construction techniques appropriate for their historic period.

He's not the only person who feels this way. The National Park Service and the International Council on Monuments and Sites (ICOMOS) have codified standards that dismiss reconstruction outright due primarily to issues of authenticity. If these internationally recognized agencies don't support the reconstruction of historic monuments, why should the city of Tucson?

I am a dedicated preservationist and I do want to honor the Convento site in a way that is appropriate to interpret Tucson's pluralistic heritage. In this site's richly layered history, I'm also afraid that the story of the Convento's slow demise and ultimate demolition by a generation more concerned with city building than the preservation of our heritage will not be told, thus condemning future generations to repeat its action (e.g., Marist College and Tumamoc Hill).

I don't believe you need to rebuild a full-scale model of a building to interpret and honor that history. In the same way that, thanks to the Vietnam Memorial, we don't need to build statuary monuments to honor the casualties of war. The architectural firm for the Convento project is more than capable of creating a contemporary landscape that honors, informs and interprets this complex site without reconstructing a building. Do we have so little confidence in contemporary design that we restrict ourselves to only reconstructing historical monuments as a solution for this site?

Heritage tourism is a significant component of Tucson's economy, but will not be sustainable when authenticity is compromised to an unsuspecting tourist. Tucson has one of the most authentic monuments to its Hispanic and Native heritage in Mission San Xavier. In addition to its internationally significant architecture, it represents the continuity of place for the O'odham people that the Convento complex will never achieve with its site.

Authenticity is proven worldwide by a general rule of heritage tourism: If it is an authentic experience for the local population, the tourists will come. This is what makes San Xavier a successful destination rather than the failed "build it and the tourists will come" proposed mega-projects that have defined Rio Nuevo's eight-year history. As the city of Tucson transitions out of Rio Nuevo and into a new identity as Downtown Redevelopment, let's remove the hype and make authenticity the new standard.


R. Brooks Jeffery is associate dean and preservations coordinator for the UA College of Architecture and Landscape Architecture. Last week, Mr. Jeffery received Tucson's highest preservation award, the 2007 Alene Dunlap Smith & Paul C. Smith Award from the Tucson-Pima County Historical Commission, for his "high level of dedication and long-term commitment toward historic preservation in our community." Contact him at [email protected]
 
Part of me agrees that rebuilding historic sites are a waste of time. That's valuable land and all and I'm sure we could remember this as sacred and historic ground, but we can put something else there instead of a replica of what we "thought" was there 300 years ago. It's not like the Mission San Xavier, which has been preserved for the 300 years + since it was built...I can understand preserved. You want to remember the San Agustin grounds and the Convento???? Put it in the museum...where most of this shit belongs. That area is now prime ground for a new building or something. Call me anti-Historic...but you want history???? Go to the Museum!!

Sorry folks but that's why we build history museums....to relive history!!!
 
Planned expansion at both El Con and Park Place malls will contribute additional funds for Rio Nuevo, which currently has only $53M uncommitted of its projected $581M TIF revenues:


Tucsonmallsexpansion.png



New businesses will light up Broadway
Park Place, El Con file plans with city for expansions

by B. POOLE
Tucson Citizen
05.26.2007

Park Place and El Con Mall plan to bring in new businesses along Broadway, but only El Con will say what it is adding: an Office Depot. Park Place owners wouldn't name a fourth anchor department store shown on a plan filed with the city and wouldn't confirm what another plan says about a hotel: That it's a Hilton Garden Inn.

El Con, 3601 E. Broadway, has a lease for the office supply store under construction at the southwest corner of the mall parking lot, said El Con spokeswoman Susan Allen. Office Depot spokeswoman Melissa Pearlman declined to confirm, saying that typically the company announces new stores a few months before opening.

Park Place owners applied for permits to expand Macy's and add a 136,000-square-foot department store, a 748-space parking garage and a hotel at the mall, 5870 E. Broadway. But without signed deals, Park Place owners won't confirm. "The plans speak for themselves," said Jim Graham, public affairs director for Chicago-based General Growth Properties. The company last month applied for a permit to build the department store and the three-level parking garage. That plan would also add 40,000 square feet to the 160,000-square-foot Macy's. Another permit would cover the four-story, 150-room Hilton Garden Inn behind LA Fitness at the mall's east end. A spokeswoman for the hotel chain, a self-described "midprice" brand that has 284 hotels across the nation, did not return telephone calls this week. The company has announced the 2008 opening of a Hilton at 6575 S. Country Club Road.

The new department store would open into Park Place near Macy's and from a hallway running west from the food court, the development plan shows. Graham confirmed that the mall is negotiating with another major retailer to join Macy's, Dillard's and Sears. Park Place is prospering, he said. "The mall is, indeed, doing very well, and we think there is tremendous potential for increased retail and other activity there," he said. General Growth, which also owns Tucson Mall, has steadily improved Park Place since buying it in 1996. A major renovation was completed in 1999, and in 2001 the mall got a food court and 20-screen movie theater.

Growth at El Con has mostly been on its perimeter while the inside has struggled in recent years. Target, The Home Depot, Claim Jumper restaurant, Starbucks, In-N-Out Burger and a multiscreen movie theater have opened outside the mall. But there are 29 empty storefronts and fewer than a dozen businesses inside. The next to leave will be RadioShack, which will move in coming months to the building outside the mall that houses Starbucks, Allen said. A Krispy Kreme doughnut shop built outside the mall in 2003 closed unexpectedly in August. Fast-food chain Chick-fil-A bought the Krispy Kreme building in November. The building remains unused. El Con management hopes a Ross Dress For Less store under construction will stimulate new businesses inside the mall. "We certainly hope that Ross will be a catalyst," she said.

Construction at Park Place would be at least months and maybe more than a year away. The city Development Services Department will review the plans and order changes needed to get them in line with city requirements, said Planning Administrator Glenn Moyer. After the permit is approved, construction would have to start within six months, though the mall could apply for extensions, he said. The Park Place expansion would be a big boost, said Paula Stuht, vice president of business development at the Tucson Metropolitan Chamber of Commerce. "I think a fourth anchor will make a huge difference for them," she said.

New stores at the malls would also mean more cash for downtown development because some sales taxes from growth at both properties boost Rio Nuevo. Park Place contributes two-thirds of the revenue for the tax increment financing district that starts downtown and extends along Broadway to Park Place, said City Finance Director James Cameron.

Rio Nuevo's projected revenue through 2025 is $581 million, but that can go up if more businesses are lured into the district. Building the Rio Nuevo pot opens the door to more downtown projects. The City Council this week essentially committed the full $581 million to current projects, except for $53 million set aside for the future. "Feed the TIF," said Rio Nuevo Director Greg Shelko. "That means the ability to fund future projects we haven't even thought of."
 
El Con looks like a mortuary inside. Outside, it's evolving into a power center but with no overarching conceptual design that unifies the disparate buildings. Back in the 1970s, there were a couple of local department stores - Levy's and Steinfeld's, a Montgomery Ward's and lots of smaller stores that resembled the old Park Central. Today, it resembles Chris-Town except the interior mall hasn't been scrapped yet. Still, the surrounding demographics are good enough to support a Dillard's and Macy's.

Central Tucson seems pretty good overall. In contrast to Phoenix, the city didn't gut itself looking for some pot of gold in office high-rises far outside downtown. There's no way, however, it can reconcile growth with a transportation system based on one person/one car. There's simply no room left.
 
OmniTucsonGolfResort.jpg

Omni Tucson National Golf Resort & Spa


Omni Tucson National starts work on remodeling project
Inside Tucson Business - Real Estate Section
May 25, 2007

A $57 million, 18-month, renovation and expansion project is underway at Omni Tucson National Golf Resort & Spa, 2727 W. Club Drive.

The intent is to transform the 45-year-old facility into a premier boutique resort. Another 112 new guest rooms are to be added, to bring the total to 279, including 28 suites. The renovations will incorporate new courtyards, gardens, patios and a 7,500-square-foot ballroom, along with a remodeled 15,000-square-foot spa and complete a nine-hole expansion, to give the resort a third 18-hole championship golf course
, designed by 2006 Ryder Cup Captain Tom Lehman, which was opened in 2005.

Seaver Frank Architects is the lead designer for the project, working in collaboration with Zebrowski Design Group, based in Culver City, Calif., and the E-Group, based in Phoenix.

First opened in May 1962 as the private Tucson National Country Club, the original 18-hole course and facilities have seen several transformations over the years. In 1986 it was opened to the public as Tucson National Resort. In 1990 it was acquired by the Shoreline Operating Co. and is operated by the Omni Hotels Group.
 
^^There may yet be hope to revive El Con Mall, Tucson's oldest enclosed shopping center:

ElConrendering.jpg

Rendering of a promised Spanish Colonial-style renovation of El Con


Signs of Life
Could burgers and cheap clothes be El Con's salvation?

By Kelli Hart
Tucson Weekly
May 24, 2007

Many Tucsonans will tell you that El Con Mall is doomed, a failure as an establishment. The interior of Tucson's oldest mall is nearly vacant, with the desolate halls of each wing holding only a speckling of open stores. The only activity inside the mall seems to be generated by longtime anchors Macy's and JCPenney.

However, there are actually some honest-to-goodness signs--after years of false promises and overstated claims by mall management--that El Con Mall proper may finally see some sort of revival.

Since In-N-Out opened on April 24, a distracting amount of traffic has come to the exterior of El Con Mall, as a mass of burger-loving followers flocked to the chain. El Con Mall spokeswoman Susan Allen said mall management expected In-N-Out Burger to draw large crowds. And believe it or not, In-N-Out has consequently created more business for the handful of shops remaining inside the mall.

Carol's Yogurt Shoppe is one of those veteran stores inside El Con Mall. Owner Carol Mendelson, who has been in business at El Con Mall almost 23 years, says she has already noticed a great deal of change, thanks to In-N-Out's opening. "I have all these people coming from In-N-Out to get dessert," says Mendelson.

The traffic that In-N-Out has generated inside El Con Mall's interior is not to be taken lightly: Mendelson says that she has not been this busy at her yogurt stand in years. "I came in at 10 a.m., and I walked out at 5:30 p.m., and I never sat down," says Mendelson about one recent day. "Those tables were never empty." On one recent Monday, Mendelson had eight customers approach her stand to purchase a cone in the span of 15 minutes. (This may not sound like a lot, but if you've been inside El Con at any time within the past couple of years, you know that number is significant.)

Allen says she's positive that another addition to the mall--a Ross Dress for Less--will bring in more customers. "You need a large store that acts like a traffic generator," says Allen. "Small retailers will catch on eventually." The Ross Dress for Less, which will take 30,000 square feet of space, is already under construction on El Con's west wing.

Robert Lusch, department head and professor of marketing of the UA Eller College of Management, thinks that one hope for El Con Mall is to strive to be a unique shopping center and offer specialty services. "The best option would be not to duplicate Tucson or Park Place Mall," says Lusch. "They should try not to go head to head with other malls, and should focus on intangibles and services."

Lusch remembers the last time he visited El Con Mall. That was 25 years ago, years after the mall was built in 1960, before there was such a thing as Park Place Mall. "It was a great big hit at the time; it was quite the buzz, very vibrant with lots of activity," he recalls.

The official Web site for El Con Mall promises plans to renovate the shopping center, with a variety of unique retail shops, the opportunity to purchase fresh produce, art galleries and a Spanish Colonial-style design. Of course, that part of the Web site carries a 2001 copyright date.

While the main portion of the mall has languished, the exterior of the mall has seen a lot of construction, and now offers chain stores such as Target, Home Depot, Starbucks, Claim Jumper, Rubio's and, of course, In-N-Out, as well as a popular movie theater. Krispy Kreme, which closed down after the franchisee filed for bankruptcy, will soon be replaced by a Chick-Fil-A.

Mendelson thinks that the Ross Dress for Less will add to the increased customer traffic that has surfaced in In-N-Out's successful wake. She compares El Con to Foothills Mall, noting that Foothills Mall had practically nothing happening in the interior before new businesses on the outside brought customers back. "Everything that is happening now is a positive," she says. "I have no doubt in my mind that within the next year, it will be a whole different feeling."
 


Back
Top