City Council has given final approval to The Bridges, a controversial South Side development that will allow an exception to the city's big-box ordinance (i.e., a Wal-Mart Supercenter), and includes 1 million s.f. of retail space, an upscale housing development on 110 acres, and a 65-acre bioscience park developed by the UofA:


Huge South Side project OK'd
Council allows big-box store but adds conditions

By Rob O'Dell
ARIZONA DAILY STAR
3.28.07

A big-box store, a biosciences park and an upscale housing subdivision on 350 acres on the South Side were given final approval by the City Council on Tuesday. The vote ended two years of torturous negotiations and controversy over the development, which is likely to feature Wal-Mart as its main tenant.

Most council members lauded the project as an example of what can happen when the developer, council members and the community work together. Councilwoman Karin Uhlich, the lone dissenter in the 6-1 vote, had a different view, saying the big-box store would have negative effects far beyond the neighborhood where it's located.

About a half-dozen neighborhood residents spoke in strong favor of the project, saying it would bring jobs and shopping to an area that needs both.
Councilwoman Nina Trasoff, who expressed concerns identical to Uhlich's, said she wrestled with the decision so much that she didn't know how she was going to vote as she began speaking. In the end, because the area's residents wanted it so badly, Trasoff said she would "hold my nose and vote yes."

Dubbed The Bridges, the project calls for a big-box store as part of 110 acres for a "power center" — to include 1 million square feet of retail space. The big-box store will likely be a Wal-Mart, but that is not specified in the plans. It also proposes 110 acres for an upscale KB Home housing development and a 65-acre biosciences park to be developed by the University of Arizona. The site is bounded generally by South Kino Parkway, East 36th Street, Interstate 10 and South Park Avenue.

Trasoff said the big-box has to be a Wal-Mart because no other company negotiates in the way this developer, Eastbourne Investments Ltd., did with the city. She said Eastbourne turned the negotiations into "hardball and manipulation." Trasoff said Target Corp. has agreed in at least two Tucson sites to abide by the big-box ordinance, which limits the size of a grocery section to no more than 10 percent of a retail store larger than 100,000 square feet. Eastbourne, by contrast, sought an exception to the ordinance as a condition for the company to even submit its proposal to the city for review.

Councilman Steve Leal, who was the lead negotiator because the project is in his ward, laid out six criteria for not enforcing the city's big-box ordinance in Eastbourne's planned area development. Those are: The project is vital and has extraordinary benefits to the community; the surrounding area is depressed economically; the area is a federal empowerment zone and a state enterprise zone; the site is the single most important development location for the area; the site has stood unused for decades; and it's next to a major highway. Leal said those criteria would be used when deciding other development requests to ensure the city's big-box ordinance stays intact, despite this approval.

Leal touted the extra conditions put on Eastbourne, which included $2 million to pay for job training, business-assistance programs, neighborhood improvements, economic-improvement grants to area nonprofit organizations and improvements for pedestrian access and roads. That money will be matched with $4.5 million the city expects from construction sales taxes at the site. Jim Portner, the project's representative, said the vote makes the project a reality.
 
A few days after a private downtown landowner proposed an arena and hotel on his property, the city reveals its plan to spend $194M for a new 12,300-seat arena next to I-10 and convert the old arena at TCC into additional meeting space:



rendering-DTarena.jpg

rendering - new downtown arena


City unveils $194 million arena plan
TCC arena would be revamped in project

By Rob O'Dell
Arizona Daily Star
03.31.2007

Tucson brought out mammoth and detailed plans for a nearly $194 million Downtown arena and a revamped Tucson Convention Center on Friday, just two days after a private developer released his own plans for an arena and hotel complex in the same area.

One study calls for a new $130 million arena oriented north-south along the Interstate 10 frontage road just south of West Congress Street, with a capacity of more than 12,300. The remaining $64 million would go toward expanding the TCC and converting the existing arena to convention space. The arena's design was inspired by a desert tortoise shell, with a roof that rises from only 24 feet high on its east and west sides to 91 feet at its apex. The lower bowl of seating would be 29 feet below ground, reducing the overall building height.

The plans also detail a revamp of the TCC to turn it into a proper convention center — adding new meeting rooms to the east and south of the current TCC arena, which would be transformed into an exhibit hall for $18.7 million. The city also unveiled a second study showing it would cost $108 million if the City Council chose to renovate the existing TCC arena to contemporary standards.

The advantages to renovation, the study says, include the closer proximity to other venues Downtown such as the Music Hall and restaurants, and preserving the new arena site for other development. Downsides to renovating included the loss of events and revenues for 18 to 24 months while the work is being done.

The figures released Friday do not include the cost of a Downtown hotel, which the city wants to couple with the TCC expansion and the new arena. Officials in the City Manager's Office said the hotel plan could cost upwards of $100 million, but contend the money generated from the hotel once it is finished will help write down the debt for a new arena. "All three are together," TCC director Rich Singer said. "Financially ... you can't divorce them and make it work." There have been talks about the city's buying out the Hotel Arizona, owned by Humberto S. Lopez.

The plans released Friday have been anticipated for more than a year and have been repeatedly pushed back. But two days after longtime Downtown property owner Allan Norville released his own plan for an arena and hotel development between the TCC and Interstate 10 — and Councilman Jose Ibarra put it on the council agenda — the city released its mass of information. "If we're taking a look at Allan Norville's project, shouldn't we hold ours up side by side?" Singer asked. "If he's going to roll his out, we might as well say what we're thinking." Norville said he didn't want to comment on the city's plan until he sees it, but said he's happy the city is moving because "they've been sitting on it. Maybe what we did will be moving them on," Norville said.

At least two council members said the arena plan is the result of a competitive request for proposals the council voted on in 2004. "There was a formal competitive process and this is the result of it," said Councilwoman Nina Trasoff. "It is a well-conceived plan. It's an exciting concept." Councilwoman Carol West said she was "very disgusted" because developers have called her often now that Ibarra has put Norville's plan on the council agenda. "If we're going to open it up to Allan Norville then we'll have to open it up for all developers," said West, who added that she favors the city's arena plan.

The most enthusiastic proponent of the arena plan was Mayor Bob Walkup. "I'm 110 percent behind it," Walkup said. "The time has come, and this is the right project." Councilwoman Shirley Scott said she felt the city's proposal was intriguing, well-thought-out and well-planned. She said it will be interesting to compare Norville's and the city's plans.

But the arena plan has its critics, beginning with Lillian Lopez-Grant, a community activist who lives on the West Side. A new arena would use up much of the Rio Nuevo tax increment financing money, leaving little for the West Side, Lopez-Grant said. She said she opposes a new arena because it wasn't in the list of projects voters approved in 1999. "They're going to eat up all the TIF money," Lopez-Grant said of the city. "And then they'll tell us it's all gone, too bad. We've been screwed so many times you almost accept it." Councilman Ibarra, who represents the West Side and pushed forward Norville's plan, didn't return calls for comment.

While the city's studies didn't detail how the project would be financed, the studies for the first time project the new arena's bottom line. The new arena is projected to make $1.6 million to $2 million a year — not including the cost of paying off construction bonds. The TCC now operates at an overall loss, but those losses include convention facilities, the music hall and the little theater. Officials expect the new arena to be more profitable because it will be able to provide hospitality suites, box seats and club seats, which are expected to net between $1 million and $1.2 million a year. The city also expects net income from sponsorships and naming rights to be between $600,000 and $700,000 annually.

TCC director Singer said he expects the number of events to jump from 80 currently at the TCC to about 130 to 150, from increased concerts and minor league hockey and arena football league games. He said he expects those numbers to pan out based on CS&L International's feasibility study, which examined 31 newly built venues across the country. "We're the third-largest city in the nation without a contemporary arena," Singer said. "We're not pioneering. We're not cutting edge."


By the numbers

New arena:
$130 million
for a 12,300-plus capacity arena that would offer hospitality suites, box seats and club seats.

Revamping TCC:
$64 million
Plan would add meeting rooms and convert current arena into an exhibit hall.

Hotel Cost:
$100 million
Or more to buy an existing Downtown hotel and expand it to serve larger conventions.

Rio Nuevo FUNDS:
$550 million
Amount approved by the Legislature for Rio Nuevo in 2006.
 
Last edited:
Why the hell would you replace a 9,500 seat arena that reflected an metro population of less than 400,000 when it was built with an arena that seats just 12,500 and the metro area is now more than twice the size?! This town is really stupid. Argh. Can't wait to get out. Zero vision on display again in the (very) Old Pueblo. You want real concerts/events? 17,000 seats minimum. Get a clue of fearless civic leaders...
 
^I was scratching my head on this one too, especially since Albuquerque, with a slightly smaller metro. population, is planning a 17,000-seat arena for their downtown. Go figure. What I have heard is that making an arena larger than the one currently proposed would add an extra tier of seating that is substantially more expensive. But if they are truly looking at long-term needs and population growth, it could certainly end up being a "penny-wise, pound-foolish" decision if they build the smaller version.
 
Last edited:
Building freeways is also expensive but, um, necessary as well. You can count on Tucson to be cheap upfront on pretty much anything. We always prefer to pay the "hidden" costs which are always much greater but peacefully amortized over the future (education, freeways, economic development). It just boggles the mind, really, how ass-backwards this town is in terms of leadership. If I thought it'd make a difference, I'd be more upset :)
 
In Tucson's defense, they compete with Phoenix for events, whereas Albuquerque is not only the largest city in the state, but the largest in a 700 mile radius.

They probably ran the numbers and realized they could support a 17,000 seat arena.
 
I went to the TCC arena a few weeks ago..............and what a piece of junk. It is out of date with a low ceiling, so it is time for a major update. I hope TOOL doesn't cancel their show in May because of the venue. I guess the plans for the new one is better than nothing:shrug:
 
Interesting article by Talton. I am certainly no expert on Tucson, but it seems to me that Tucson really needs to find (and market) its identity better. Right now it competes with Phoenix for everything and thats tough. With the major airport in Phoenix, tourists fly into Phoenix and have little reason to take the 2 hour drive south (unless they are coming to see Rockies or White Sox spring training). Golf? Can be done in Phoenix. Conventions? Phoenix. Sports? Phoenix. Resorts? Phoenix.

Talton is right, let Phoenix become the big city, if Tucson can keep growing but hold onto its small town/Old West charm, I think that would be very beneficial for it.
 
Council approves new Downtown arena
Arizona Daily Star
Tucson, Arizona | Published: 04.04.2007

The City Council unanimously approved building a $130 million arena Downtown this afternoon.
The plan, unveiled by City Manager Mike Hein just last week, also includes a $60 million makeover for the 37-year-old Tucson Convention Center.
The plans were approved with almost no public discussion at the council meeting, and no opportunity for public hearings or comment.
The motion approved by the council also instructed city staff to come back in 30 days with a request for proposals from developers to build a Downtown convention hotel.




040407stadium.jpg
 
They approved the Arena and TCC renovation. Now this....


'Four diamond' Hilton proposed for downtown
TEYA VITU
Tucson Citizen
Hilton has been lined up to operate today's downtown Hotel Arizona and a planned 30-story neighboring tower that will produce a 712-room hotel complex within steps of the Tucson Convention Center.
Centro Nuevo Partners are done with pre-construction development on a proposed $130 million project that would renovate the existing 14-story Hotel Arizona tower, add a new 30-story hotel tower and replace the existing garage with a new garage topped with an eight-story office building.
"We can start immediately once the funding is in place," said Tom Tracy, a hotel consultant for Centro Nuevo.
The funding involves winning City Council approval for a tax-exempt bond that depends on a $4 million guarantee from the city. The partners are presenting the concept to the council at a study session today with hopes to get a council commitment within 30 days.
Tracy said the publicly guaranteed financing model is the common downtown hotel financing method that has been used to build hotels in Denver, Baltimore, Austin, Texas, and Portland, Ore. He said the hotel's operation would service the debt with no need for public funding.
Once a bond is in place, remodeling of the existing tower should start in late summer, with construction of a 30-story tower following in 18 months and ready for guests three years from now, Centro Nuevo's managing member Roger Karber said today.
Using the public financing model reduces interest rates by up to 80 percent, Tracy said, adding that it also passes deed of ownership to the city. Projections estimate the city's Rio Nuevo coffers could see $1.9 million in new tax-increment funding from the Hilton in its first year of operation.
Tracy said the city could see as much as $9.7 million from the first year, including the projected "free cash flow" after debt-service payments are made.
"We're asking to retain the air rights above the garage," Tracy said.
Centro Nuevo Partners would own the eight-story office building and garage that would be built where the current garage is. This would include a retail component, but not a mall that was proposed a year ago.
Centro Nuevo Partners brings together apartment magnate Humberto S. Lopez's HSL Properties, which owns the Hotel Arizona, and Karber's Centro Nuevo Development, which will manage and arrange the capital for the project. Piper Jaffrey will issue the bond, and Kansas City, Mo.-based JE Dunn Construction, the nation's sixth largest general building company, will build the complex, Tracy said.
The project has undergone significant changes since first announced two years ago, when condos were supposed to fill a new, 22-story tower. The condos now are gone and the tower has a much sleeker look and eight more stories.
The existing tower will remain, but the interior will be entirely rearranged and the present 307 rooms cut to 246 larger rooms. The main entrance will move from Congress Street to face the TCC.
An 11,000-square-foot ballroom will be added to the lobby level. Presently, the Hotel Arizona has only one ballroom, on the garage level below the lobby.
Centro Nuevo also plans a smaller 9,000-square-foot ballroom two floors above the lobby. It would have a retractable room to become an open-air space.
The lobby level plans call for a specialty restaurant, a three-meal atrium-style restaurant and an island lobby bar that feeds toward the convention center, and six retail outlets. The mezzanine level that overlooks the lobby is slated to get a two-story, 10,000-foot spa, Tracy said.
"They should be a Four Diamond hotel," said Tracy, referring to AAA's Five Diamond rating system.
Tracy said this project is ready to build once a bond is in place.
"We've spent $1.3 million to bring the project to this point," Tracy said. "We have every member of the development team in place."


Hilton in downtown TUCSON!!! Now we're talking....as long as Paris isn't in town. VERY NICE
 
I wonder if this picture is the actual design. This would be awesome! :cheers: Hopefully the height doesn't change because I am sure the NIMBY's will want this changed to about three or four stories.:koko:
Lets keep our fingers crossed about this proposal.


1175719501.jpg
 
Yeah,

I'm guessing the NIMBY's will want to turn the 30 stories into 10 acres and make it a wildlife resort.....sorry folks...IT'S DOWNTOWN....IT'S HILTON!!!! Let them build the hotel......30 stories and close to a renovated TCC and New ARENA!!! This is good...and this could be the progress that Tucsonans have been waiting on with RIO NOGO!!! This would be great and since the Hilton brand can afford a private developer.....this will make money to spruce up other parts of down town.
:tup: :tup: :tup: It's not a boom like Phoenix...but 30 stories is a Monster in TUCSON...NO TO NIMBYS
 
Yes, after all the interminable plodding with Rio Nuevo, the City Council is acting with uncharacteristic lightning speed to get a new convention center hotel built, which will supposedly pay down some of the construction debt of the newly approved arena and expanded TCC to follow. However, this latest update from the Star says the city will ask for RFP's for the hotel, in spite of new proposals from two developers to build it (one of which was mentioned in a previous post):


Conv.jpg

Rendering of new 30-story convention center hotel tower proposed by developer Roger Karberer (Tucson Citizen photo)


City expands search for developer to build luxury Downtown hotel
By Rob O'Dell
ARIZONA DAILY STAR
04.05.2007

Tucson is looking for a developer who can use the city's favorable financing to build a posh Downtown hotel. On Wednesday the City Council voted to give city staffers 30 days to come back with a plan to make it a reality. The decision left two local developers who have recently pitched large hotel proposals wondering where they stand. In fact, both of those developers pitched their plans to the council on Wednesday, immediately before the council decided to go in a different direction.

All the proposals would be able to use the city's ultra-low tax-exempt financing and have one of the four top hotel chains in the country manage the property. Earlier on Wednesday, developers Roger Karber and Tom Tracy pitched a $110 million expansion of the Hotel Arizona, using the city financing to remodel the current hotel, add a new 30-story tower to expand the hotel to more than 700 rooms and add a spa, retail stores, restaurants and convention/ballroom space to the aging hotel. The total cost of the deal would be $20 million higher, Karber said, when you factor in the existing $20 million in debt currently on the Hotel Arizona.

The expansion would create the tallest building in Tucson by eight stories, Karber said, and would also allow Karber and hotel owner Humberto S. Lopez to build an eight-story mixed-use office and retail center at the corner of Broadway and Granada Avenue that would have the new modern streetcar run either through it or adjacent to it.

Tracy said the developers would take a standard development fee for developing the project. Tracy said development fees are typically 4 percent to 7 percent of the total construction cost, which is estimated to be about $110 million — leaving the hotel developers between $4 million and $7.7 million for their services.

Karber originally said his company would build the hotel using the city's low-interest financing and using Rio Nuevo money to secure the debt, and then sell the hotel back to the city for $130 million. However, later, Karber's lawyer and consultant Larry Hecker offered a different version of the proposal, which had the city buying the hotel prior to the renovations and expansion, which he said was needed to be eligible for low-cost tax-exempt financing. This is similar to a deal City Manager Mike Hein talked about doing before the council went in another direction.

Karber said that in the latter scenario, he and Lopez are asking for $25 million for the hotel. They would still get the millions in development fees and the opportunity to develop the corner of Broadway and Granada. Either way, their hotel deal is on hold, as the council has voted to put out a request for proposals for hotel developers.

Also put on hold is Downtown landowner Allan Norville, who is pitching plans for an exhibit hall for the Tucson Gem & Mineral Show and a 250-room hotel, which falls far short of the city's goal of a 700-room hotel. However, Norville can modify his proposal to meet city expectations after the Request For Proposal is released.

Wednesday's move also opens the door for other potential bidders, who could take advantage of potential low-cost city financing assistance and being able to build on city land. The city has been offering similar incentives to hotel developers for at least 25 years, however, with no takers.


SOME DETAILS

Within 30 days the city is expected to put out a request for proposals soliciting a Downtown hotel developer. Prospective bidders will be expected to build:

• What: A 700-room-minimum convention-quality hotel.

• Where: Within a very short walk of the existing Tucson Convention Center and a planned new Downtown arena.

• Cost: Expected to be between $80 million and $120 million.

• Where the money will come from: Loan guarantees from Rio Nuevo redevelopment money and other Rio Nuevo funds and tax-exempt low-interest bonds issued as a result of the city's involvement in the project.
 
Last edited:
The full Daily Star article of the new arena approval mentioned previously:


Council gives speedy OK to $130M arena
TCC expansion approved, also with little input

By Rob O'Dell
Arizona Daily Star
04.05.2007

Seemingly out of nowhere, a Downtown arena became Rio Nuevo's top project Wednesday, as the City Council voted unanimously to approve the $130 million project. In addition, the council voted to back a $60 million expansion of the Tucson Convention Center and to put out a request for proposals in 30 days for companies to bid on the opportunity to build a new Downtown hotel.

Only five days after a feasibility study detailing the design and cost of the arena was released on Friday, the project took a giant step toward becoming a reality with a minimum of public input. In fact, the arena and the TCC plan themselves were not listed on the agenda. The vote happened only after a discussion about a competing hotel and arena plan submitted by Downtown landowner Allan Norville.

While the public had a say on the selection of the consultants to study the cost and viability of an arena and create a proposal to build it in 2004, since those costs and other figures came out last week, no public comment has been taken. Mayor Bob Walkup called it a "fairly historic vote." The packed council chamber broke out in applause after the vote was taken.

Most of the council members had glowing words for the arena proposal, calling it a new beginning for the much-criticized Rio Nuevo Downtown Redevelopment District. Councilwoman Shirley Scott said the arena would "make Downtown dazzling, exciting and new. It's a new energy and a new place," she said. Other council members who opposed the arena in the past — Steve Leal and Jose Ibarra — both voted for the arena.

Leal said the way City Manager Mike Hein proposed staging the deal — using the cash from a new or renovated Downtown hotel to write down the debt from the arena and the TCC — creates more tax increment financing (TIF) years down the line that could be used for future projects. "That's why the hotel stuff is so critical; it carries the arena," Leal said. "It's important the arena doesn't crowd out other projects like the science center and museums." Ibarra said after the meeting that the arena's $130 million price tag was less than he expected and leaves money for projects on Rio Nuevo's West Side, such as a new science center by the University of Arizona.

After the meeting, Hein said using Rio Nuevo redevelopment money, the hotel cash flow and bonding would allow the city to build the hotel, the arena and the TCC for $102 million in TIF money. Hein said the council's approval of the arena allows the city staff to focus on the hotel component of the hotel-arena-convention center proposal. He said the reason for its approval Wednesday, even though the arena was not on the council agenda, was an "evolution in the discussions" after Norville's arena plan was put on the agenda by Ibarra.

After sitting on the arena studies and repeatedly pushing back their release for months, the city released the studies en masse on Friday in an attempt to combat Norville's proposal for an arena. They were the first studies released on the arena in more than a year. The studies called for a $194 million Downtown arena and a revamped TCC — with $130 million to an arena oriented north-south along the Interstate 10 frontage road just south of West Congress Street and the remaining $64 million going toward expanding the TCC and converting the existing arena to convention space.

The council voted, however, to cap the TCC funding at $60 million instead of $64 million. Councilwoman Karin Uhlich noted there is also $30 million in state funds that could be put toward revamping the TCC that was allocated in a 2003 bill giving money to Phoenix for its Civic Plaza. The legislation, however, called for a public vote before the money is released, and Tucson voters have repeatedly said no to funding the TCC.

The arena's design was inspired by a desert tortoise shell, with a roof that rises from only 24 feet high on its east and west sides to 91 feet at its apex. The lower bowl of seating would be 29 feet below ground, reducing the overall building height. The arena would have a capacity of more than 12,300. Once the arena is up and running, the TCC would be turned into a full-fledged convention center, rather than a multipurpose facility, by adding new meeting rooms to the east and south of the current TCC arena, which would be transformed into an exhibit hall for $18.7 million.

The next step for the council is the request for proposals for the Downtown hotel, Hein said. All the proposals would be able to use the city's ability to arrange ultra-low, tax-exempt financing, and would include having one of the four top hotel chains in the country manage the property. The hotel is key to the project because after it is completed at a cost of more than $100 million, the project would create a stream of funds that would go toward writing down the debt on the arena and the TCC.

Hein said this is the model that has been used to expand convention hotels across the country — and is the same mechanism being used by Phoenix for its convention hotel. But there's a difference, Hein said. No other city has used TIF money to add to the deal, he said. After the hotel component is decided, the next arena component to come before the council would be the design-build contract for the arena, which would be built by a collection of firms the city chose in 2004. The financing of the project also needs to come back before the council, Hein said.

Although the arena vote was taken without much fanfare and little public notice, the chances of seeing a Downtown arena soon aren't likely. First, the city needs to build the hotel and have its cash flow dedicated to the arena's debt. Second, the site of the arena is the current Greyhound bus station, which won't be moving until 2009, Hein said.


Fast Facts

• What: A new 12,300 seat arena for concerts, sporting events and trade shows.

• Cost: Up to $130 million.

• Where: Just east of the Interstate 10 frontage road between West Congress and Cushing Street.

• When: No target date or timeline has been set. Groundbreaking is likely two years or more away.

• Where will the money come from: Mostly from Rio Nuevo funds. City officials also believe a convention hotel they hope to develop will bring in enough money to pay for itself and a share of the arena, too.

• What else is included: A $60 million makeover for the Tucson Convention Center.

• What's next: In 30 days, the city staff has been told to prepare specifications for a request for proposals soliciting bids to develop a convention hotel in the TCC/arena area. City officials will also be negotiating a "design-build" contract with a developer for the arena.
 
Yeah,

I'm guessing the NIMBY's will want to turn the 30 stories into 10 acres and make it a wildlife resort.....sorry folks...IT'S DOWNTOWN....IT'S HILTON!!!! Let them build the hotel......30 stories and close to a renovated TCC and New ARENA!!! This is good...and this could be the progress that Tucsonans have been waiting on with RIO NOGO!!! This would be great and since the Hilton brand can afford a private developer.....this will make money to spruce up other parts of down town.
:tup: :tup: :tup: It's not a boom like Phoenix...but 30 stories is a Monster in TUCSON...NO TO NIMBYS

Hilton does not build hotels any more (or rarely--I can't say "never"). Hilton manages hotels owned or developed by others, often a REIT. That's why Tucson is looking for a developer. And frankly, involvement by Hilton seems to me like putting the cart before the horse: Usually a developer plans to build a hotel and looks for a mangement deal with one of the large branded hotel managers (Hilton, Starwood, Marriott, 4 Seasons, Intercontinental etc.), most of whom do not actually want to own the real estate these days.

But this does seem like progress to me. Tucson finally seems to understand how the game is played: If they offer someone the opportunity to build big, they can create enough cash flow to finance what they really want which is, apparently, an arena. This is how my long-time (and now summer) home, San Francisco, is about to build a new transit terminal: selling the rights to build a 1200 ft. mixed use tower for enough money to finance the terminal.
 
Are there many home buyers interested in Tucson's emerging downtown condo/loft market? Only time will tell...


Slack Demand
One developer's experience doesn't bode well for downtown housing projects

By DAVE DEVINE
Tucson Weekly
April 5, 2007

As a growing number of skeptics predict that several ballyhooed downtown housing projects will never be built, proponents are simultaneously anticipating a summer surge in activity. But one developer who has actually implemented a housing complex in the area offers a cautionary note to those building condominiums downtown.

Steve Fenton last year converted a former private school on South Sixth Avenue into the Academy Lofts, planning to have 25 rental and 11 condo units. But only six of the owner-occupied homes sold, so the remainder were rented. "From what has been our experience," Fenton observes, "we haven't been able to sell the last five (condominium) units."

Despite that, three developers promise to be under construction within a few months with hundreds of new downtown condo units, believing a market for their projects still exists. They are among the numerous builders who a year ago were supposedly leading a downtown housing renaissance (see "Residential Revolution," March 23, 2006) but are now facing recurring questions about their intentions.

"We're proceeding at full blast and expect to be in the ground in late May or early June," declares Oscar Turner of Bourn Partners, developers of The Post on Congress Street near Scott Avenue. The long-promised six-story project will have about 50 units along with ground-floor retail, and while Turner won't say what the condos will sell for, he does indicate a studio will be available in the low $200,000s. Acknowledging it is more difficult to finance a condominium project today than it was three years ago, Turner also says, "I hope that once our project is seen, it will light a fire under more people. The Post will probably help those behind us."

Not waiting for that, James LeBeau says that the partnership he belongs to is moving ahead with 44 E. Broadway, a 30-unit condominium project that will convert a former courthouse annex into residential and retail space. "I'm bullish on the condo market," LeBeau says, "and we should be under construction within a couple of months or less." Commenting that he doesn't understand the negativity in the community about downtown, LeBeau predicts, "A big change is coming."

Chris Walker, spokesman for a Sixth Street condominium project called Lofts at Fifth Avenue, shares that sentiment. Admitting the 126-unit project was recently for sale, Walker also says the 15- to 18-month construction effort will start this summer. "The market is still there," he insists of the desire to own a downtown condominium. "There is serious pent-up demand."

Two other developments lagging behind these apparent front-runners are Presidio Terrace near the Tucson Water building, and a condominium/brewery project next to the railroad tracks where they cross Stone Avenue.

While initially hoping to be underway soon with her 90- to 120-unit project, Peggy Noonan of Presidio Terrace now says that won't happen until January. "We're moving ahead with our plans," Noonan says, "and have 30 reservations for units. ... I'm incredibly encouraged." Emphasizing that her units will be high-end, sustainable condominiums, Noonan adds their cost will exceed $400 a square foot. Those factors, she believes, will differentiate her project from others.

Still working on plans for the 140- to 150-unit condo/brewery project next to the tracks, architect Raul Reyes of Town West Design Development says there isn't a construction schedule for it yet.

An even more uncertain fate seems to have befallen two other downtown condo proposals. David Ollanik wants to build One West, a 100- to 110-unit project at Speedway Boulevard and Stone Avenue, but needs to buy land from the city. With some municipal officials and neighbors complaining about the lack of affordably priced units within the building, Ollanik says he's still waiting to get onto the City Council's agenda.

Another proposal with question marks floating around it is the conversion of the former Santa Rita Hotel into condos. A year ago this project was slated for 148 units, but telephone calls seeking an update weren't returned. The owners recently did tell the Tucson Citizen they planned to transform the building into a 66-room boutique hotel with an additional 48 condos.

But while those two proposals may have uncertain futures, projects to add more rental units downtown still seem to be moving forward. On Congress Street, rehabilitation work is presently underway on the second-story apartments surrounding the Rialto Theatre. Across the street at the former Martin Luther King building, conversion of the public housing apartments into rental units should get going this summer, according to Ron Schwabe of Peach Properties. Once promoted as a condominium project, this redo will now result in 96 apartments along with construction of new retail space.

Also within the next several months, the city of Tucson plans to begin building a 300-space underground parking garage just to the north of the MLK structure. Once it's completed, Jack Siry of the Community Services Department says 68 units of public housing will be built on top, and Schwabe indicates another 80 units of rental housing will also be added.

But new condominium and rental units aren't the only housing in downtown's future. Street work and other construction activity has begun on a 250-unit subdivision along West Congress Street, while single-family developments on 22nd Street have filled in completely over the past year. To keep this trend going, the city is looking to dispose of more downtown property it owns.

Thus, even after the national housing boom went bust and the local downtown condominium market seems to have dissolved, the central city still has it residential supporters. "Downtown is a great place to be," Turner exclaims about the area's residential prospects. "I'm psyched."
 
Are there many home buyers interested in Tucson's emerging downtown condo/loft market? Only time will tell...

This is a chicken/egg thing. People will want to live downtown when downtown becomes an active, fun place to be. Activities and fun things will come there when there are people living there to support them. Something has to go first. I say build the housing--rental if necessary. They've tried luring businesses to a resident-empty downtown for years with little success.

I am somebody who lives (in summer, now) in downtown San Francisco--a block from City Hall. But in Arizona, I bought a place in Green Valley (I call it "the anti-San Francisco"). Tucson's downtown depresses me right now. It's like it tried to get off the ground in the 60's or 70's, but failed. But I think expanding the Convention Center could be a good idea. In itself, it isn't. Convention Centers are mostly not downtown-friendly since they usually are large structures with a lot of blank walls and parking lots (although SF's was put underground with a beautiful park and small mall on top--no parking lots). But in this case, I think Tucson has enough potential as a place for winter conventions and lots of tourists/conventioneer activities (I'd even take a Hooters :rolleyes: ) that having a bigger, more active convention center could reactivate downtown--and then people would want to live there.
 
^Yes, the downtown redevelopment/housing conundrum is a problem, and we have already discussed it extensively (see posts #220-230 from last June).

Regarding this latest flurry of downtown developments--what I find almost more bewildering than the City Council's rushed decisions on these major projects are the conflicting reports in the local media about the proceedings.

Yesterday, the Tucson Citizen reported that a developer would be building a new convention center hotel tower operated by Hilton, only to be contradicted later in the day by the Daily Star saying that the city did not select a developer for the hotel, but will be issuing an RFP for the project.

The Star also quoted City Manager Mike Hein as saying that the arena wouldn't begin construction until at least 2009 or later, since the new hotel revenues will be needed to pay down construction debt on the arena. Then today the Citizen quotes the TCC's Rich Singer and the Mayor saying that the arena construction could begin as early as next year (see article below). So which is it? Either one or both of these organizations don't have competent reporters or they're just throwing out big headlines with half-baked stories to sell more papers--either way, it's pretty lame.

Also, a question about Mike Hein's supposed plan to pay for the arena: how will there be any significant revenues from the hotel to pay down construction costs on the new arena (i.e., due primarily from increased TCC bookings) if the TCC won't be remodeled and enlarged by the time the hotel is finished?

Seems like a better plan would be to do what Phoenix is doing--build the hotel and remodel the convention center concurrently; and might as well do the arena at the same time too, so that revenue stream comes back online more quickly. Besides, I-10 will be under construction and a mess until 2010 anyway. Did anyone at City Hall think this through, or were they just in a big hurry to get Council approval, and figure they'd sort out the details later?

Watching this unfold, you almost can't blame the naysayers who are so distrustful of local government. We'll probably have to wait until the dust settles to find out what's really happening--if that's even possible.



Arena construction could start next year
Vote pending on $190M in funding; Norville plan rejected

ERIC SAGARA
Tucson Citizen
04.05.2007


newTCCandarenamap4-07.png



Ground could be broken on a downtown arena next year after the City Council voted yesterday to approve a city-proposed plan for a $130 million tortoise-shell shaped structure. The council abandoned its usual dilly-dallying pose for decisive action less than a week after the city's plans were floated for the arena.

The council also approved an expansion of the Tucson Convention Center.
At the same time, they appeared to dismiss out of hand a project proposed by Tucson businessman Allan Norville that included an arena. TCC Director Richard Singer said construction on the arena could begin as early as August 2008. "This is going to move fast," Mayor Bob Walkup said. "No more six months of studying something and thinking about something."

Norville's sales pitch last week forced the city to unveil its own plans to revitalize the area near Congress Street and east of Interstate 10. Norville wanted the city to help him develop the area in a plan that included a 100,000-square-foot exhibition hall for his gem show on property that he owns near the TCC. Instead the council opted for the city plan.

Until late last week, council members did not publicly discuss the city's arena plan other than to say they were waiting to see it. Singer said he released the city plan early so council members could compare it with Norville's proposal. He did not expect the council to approve the plan so quickly. The plan has been years in the making. "When I was growing up, I watched the Mickey Mouse Club religiously," Singer said. "Everyday had a theme and Wednesday was the 'Anything can happen' day."

Walkup said the decision capped months of work and Norville's proposal was the catalyst that brought both plans to the council. "I think it was an appropriate thing to do," Walkup said of the decision to bring the issue before the council. "I've been anxious to review this thing for months and here it is. The council just rapidly came together. Frankly, I'm thrilled to death that it all came together."

The city plans to build the arena west of the TCC and along I-10. A parking garage and other developments are planned north of the arena near Congress, Singer said. The TCC Exhibit Hall will be renovated and the existing TCC arena converted into a second hall. Meeting rooms will be added to the complex where the TCC's east parking lot sits, Singer said.

Norville was not the only developer at Wednesday's meeting with a vision for the TCC and downtown. The owners of the Hotel Arizona, 181 W. Broadway, also presented their plans to expand and renovate their property before the council vote. No action was taken on their plan.

Norville's plan
Norville and City Hall have been at odds over the years on how to develop the area using both his and city land. He made a similar proposal in 2004 that went nowhere. Norville made a brief presentation to the council, and members thanked him for bringing the idea to their attention. His idea centered on a large gem show that he operates in Tucson every February as part of the Tucson Gem, Mineral & Fossil Showcase.

He said the buildings could be moved around, but Norville's site plan had the hotel and arena connecting to the large exhibition hall that would permanently house his Gem & Jewelry Exchange show. Unlike the city proposal, Norville's plan had more shopping and dining opportunities, but also called for the realignment of streets in the area.

He also had the arena closer to the TCC than what is called for in the city plan, but its location put it directly across the street from Barrio Viejo homes and businesses, which some council members said they wanted to avoid. Norville's 4.15 acres will be surrounded by new development under the city's plan.

It is a sign of years of failed negotiations between Norville and the city, which has approached him multiple times with offers to buy or trade for the land. "We to date have never been able to strike a deal with him regardless of how generous our offers are," Singer said. The project can survive without Norville's cooperation, Singer said. "It would be an improvement (to have Norville's land), but not a huge improvement. It isn't necessary for the success of the project."

Norville declined comment on the council decision, saying he would have to review its motion before making a statement. Walkup said Norville is not excluded from plans in the area and that the city can begin working with him and Humberto S. Lopez, the owner of Hotel Arizona, to see how they can develop their properties to fit in with the city's plans.

Councilwoman Nina Trasoff said it's a relief to see the city make progress on the important projects. She disapproved of Norville's proposal in part because he sought to circumvent the city's process of selecting a developer for TCC projects and also to supplant a city plan that had not yet been made public.

A new arena?
While the plan itself was not public, Tucson residents had a chance to sound off on the proposal three years ago when the city was searching for a consultant to design the general look and feel of a new TCC. The concept of a new arena was initially met with skepticism from some Tucson residents. That skepticism never quite went away. While there was no public comment Wednesday night, in the past some residents have wondered who would use the arena and if the money wasn't better spent on a science center.

Singer said the new arena could draw an arena football team and a minor league hockey team. He points to Prescott's new arena and its successful hockey franchise as an example. Singer acknowledged that attempts to bring minor league hockey to Tucson failed in the past, but pointed out that the population has increased. A new hockey team would also be opening a brand new arena and Singer thinks that many people would flock to the games just to see what the new building was like. According to city documents, city planners estimate the TCC arena could host 128 events a year, draw 687,000 spectators and have an annual economic impact of $75 million. More than a third of those events would be hockey or football games under the city projections, but Singer said the new arena would help attract big-name entertainment to Tucson.

Prince and Cirque du Soleil both recently declined performances here because the existing arena's ceiling was too low, Singer said. The new arena will boast a ceiling more than twice as high at 110 feet. It will seat more and provide more amenities to spectators, including premium seats and a clubhouse, according the plan.

What's next
Though the council signed off on the plan, it will need to vote again on the issue to formally allocate the estimated $130 million for the arena and $60 million for the first phase of TCC renovation. A second phase, also priced at $60 million, that includes a ballroom expansion will be discussed later by the council.

Trasoff and other council members said it was time to act on the new arena because other pieces of the downtown redevelopment known as Rio Nuevo are beginning to fall into place. Tucson Origins Heritage Park west of I-10 and south of Congress, which includes a replica of the San Agustín mission, gardens and a cultural center and will be part of a large complex of museums and attractions, will open next year.
 
Last edited:
The latest chapter in the UA Science Center saga:


City proposes a smaller UA Science Center for Rio Nuevo
By Rob O'Dell
ARIZONA DAILY STAR
04.18.07


A scaled-back version of the University of Arizona Science Center could get $130 million in Rio Nuevo funds, City Manager Mike Hein said Tuesday. But to qualify for that much, Hein said the university will have to merge the Science Center with a planned new Arizona State Museum and put up the 2-to-1 match envisioned when Rio Nuevo was pitched to voters in 1999 — a promise that project developers would put up $2 for every $1 of Rio Nuevo money.

Hein said that doesn't mean the UA would have to come up with that much cash, or put the money strictly into the science center. He said he would consider building other facilities such as commercial development and student housing as part of the university's match. Hein's pitch was included in a letter to University President Robert Shelton, released Tuesday, saying he will recommend the $130 million allocation for a combined science center and museum to the City Council if the school is amenable to the rest of the plans.

Alternative projects that could qualify toward the match include such things as graduate housing, dorms, and faculty housing on the West Side. Shelton said he believes the city and the university have made great progress, and the combined projects can be completed for the $130 million. "We can design a viable science center and state museum in that envelope," he said. He said the $130 million would cover the cost of construction and the exhibits inside, although this science center would obviously be smaller than those previously proposed. "We're getting down to specifics — that's what we always wanted," he said.

Shelton did not, however, jump in with both feet on the idea of building student housing. He said it would have to be a public/private partnership, and the housing would need to be market-driven and built by private developers. The merged science center and museum would occupy one building — on the same five-acre footprint previously set aside for the science center — or the two buildings could be separated with a common entryway.

Councilwoman Nina Trasoff said the UA and the city have been working together closely for several months to come up with this design concept. "It represents a figure and a design concept that will work for the West Side," Trasoff said. "We all win with this."

This would be the second time in the past year the Science Center has been redesigned and scaled back. In August, the UA scrapped the $350 million Rainbow Bridge proposal that would have spanned Interstate 10 and the Santa Cruz River to connect Downtown to the West Side, recommending instead a redesigned 150,000-square-foot "stand-alone" Science Center for $175 million. How big the latest incarnation will be hasn't been revealed, but it will be smaller. Tentatively, the building is slated for a spot in the middle of a $400 million museum and cultural district that will include a new Arizona Historical Society campus and a re-creation of the convento, chapel and other features of the San Agustín Mission, all clustered around a plaza just west of the Santa Cruz River, south of West Congress Street.

Not everyone was happy about the $130 million proposal, including Councilman Jose Ibarra, who represents the West Side. "I believe the science center is the most important aspect for the West Side," Ibarra said. "I'm concerned with such a small amount. I don't think the university can come close to building what they want." Ibarra said Hein's recommendation was less than everyone thought would be committed, adding, "I don't think we can build a world-class science center with that type of allocation."

Hein said he doesn't expect the UA to pay for construction, but the school can bring other resources. He added that he expects the UA to do that. For instance, he said, students living Downtown bring energy and people to the city center, and their spending money on dinners and nightclubs would help fund the Rio Nuevo TIF (tax increment financing) money. The planned modern streetcar could connect those Downtown students to the campus, he said. Downtown student housing would also help relieve stress on neighborhoods around the university, and could dampen the demand for "minidorms" being built in those neighborhoods, he said.

At Tuesday's council meeting, Councilwoman Carol West cited the lack of student housing around the university, and said a move should be made to build student housing Downtown, particularly graduate student housing.
 
So..........is the hotel proposal still being discussed or what? Why hasn't any new information been put out! Everything is so slow in Tucson!
 


Back
Top