Tucson Development Thread


Great idea. Weil is an excellent "brand" and Tucson would be wise to exploit his cachet.

Central Phoenix's economy is increasingly driven by health-related industries. St Joseph's Hospital is a major factor, but so are the other hospitals, the new medical school, T-Gen, and the anticipated relocation of Maricopa County Medical Center. Imagine if there were also a world-class spa and alternative-medicine destination.

If I were designing a "new" economy for Tucson, the marriage of tourism and medicine would be a major pillar. Tucson can capitalize on its existing assets very easily, even mixing them with other assets involving environmental and archaeological interests. Tucson is endowed with some spectacular features - the mountains, the proximity to Mexico, the unique and glorious Sonoran ecosystem. Instead of focusing on the lowest-common-denominator kind of economy - sprawl - Tucson ought to emphasize its high-quality potential.
 
The Post, a much-delayed downtown mixed-use project, could be set for an April groundbreaking:


ThePost-1.jpg

latest rendering of The Post project


Council OKs Thrifty Block rezoning; The Post on track for April start
By TEYA VITU
Tucson Citizen
12.07.2006


Some seven months and hundreds of hours went into changing the zoning of about half the land destined for construction of The Post, a 45-unit loft and commercial project slated for Congress Street. Bourn Partners won City Council approval this week for zoning changes on two commercial lots to match the higher-density, mixed-use zoning on the remainder of the half-acre empty lot between Stone and Scott avenues.

This is a major step toward Bourn starting construction on the six-story structure in April with ambitions to have residents move in about 14 months later. Bourn and the city started the zoning process in April, and it took until December to finish, even though the city owns the land and The Post is a prime Rio Nuevo housing project. "I'm not here to complain," said Oscar Turner, Bourn's project manager. "I'm here to compliment. They are trying to clean up the process and make the process go faster."

The City Council in October approved a downtown in-fill incentive district that gives Tucson officials flexibility with codes, development standards and fees on projects costing at least $250,000. That is designed to speed downtown development approvals.

The Post, which will cost about $14 million to build, started taking reservations Nov. 17. Turner would not disclose how many reservations have been taken other than saying the number is "better than we expected. We haven't sold out by any means." The Post will have about 45 condo lofts, ranging from one-bedroom, 650-square-foot unit priced below $225,000 to 2,500-square-foot penthouses costing more than $1 million. There will be four affordable-housing units priced at $150,000 that will be available through the city Community Services Department. The ground floor will have commercial businesses. "We're in serious discussions with a restaurant user," Turner said.
 
With hundreds of millions of dollars at stake, the lines are forming to get a piece of Rio Nuevo's TIF pie--but whether the city has a plan to prioritize the spending of those funds remains to be seen:


Rio Nuevo millions drawing eager eyes
Array of competing interests spar over project dollars, plans

By Rob O'Dell
ARIZONA DAILY STAR
12.11.2006

It hasn't taken long for Tucson's politicians, developers and museums to turn the recent influx of Rio Nuevo cash into monopoly money. Just six months after the Legislature approved more money for the city's Downtown redevelopment district — estimated at about $550 million — there is a growing fight over how and where to spend it.

The dispute is over whether to spend the money for a new Downtown arena or to build museums and cultural attractions on the West Side. Museum backers and some City Council members are objecting to City Manager Mike Hein's plan to allocate $200 million to West Side cultural projects and $200 million to Downtown and an arena. Business and Downtown interests are arguing for less than $200 million for West Side cultural museums, Hein said, because the museums won't generate much sales tax money.

Plans for the West Side call for a re-created San Agustín Mission, including the convento and Mission Gardens, a University of Arizona Science Center and new museums for the Arizona Historical Society and the Arizona State Museum. Hein said "others argue that's where all the money should go," to pay the entire bill to construct the West Side museums. "Everybody is jockeying in somewhat of a greedy fashion," Hein said.

The museums aren't the only ones, he said, noting Bourn Partners recently pitched two unsolicited plans to the city — a redesign of La Placita Village and a proposal to move a bookstore into a renovated Ronstadt Transit Center — which could involve Rio Nuevo cash. "There's a mad rush for the commitments to the money," Hein said. "The projects aren't real; they're not designed; the money is not there; there's no need for the rush." Everyone is squabbling about whether $200 million is enough money for the West Side, despite the fact that only six months ago there was only $120 million for Rio Nuevo in its entirety, Hein said.

The scramble for the money is unsettling, but not at all surprising, said Mary Schuh, a board member for the Pima Association of Taxpayers. She said the push for Rio Nuevo largess is to the point where people "put their hand up in a meeting and say 'I could use $10 million.' " "Now it's like a grab bag," Schuh said. "Everybody that's lining up wants to put their hand in the honey pot."

Formal UA request
The University of Arizona laid out its formal request late Friday for Rio Nuevo money for its more than $176 million Science Center and its $62 million new Arizona State Museum. The UA's request includes only $5 million of its own money for constructing the Science Center and none of its own money to build the new state museum — instead requesting that Rio Nuevo foot the bill. Its request of $166 million for the Science Center and $62 million for the new state museum total $228 million in Rio Nuevo money — more than the city had suggested it intended to spend on the entire West Side.

Alexis Faust, executive director of the UA's Flandrau Science Center, said the funding request demonstrates the UA's commitment to Rio Nuevo because the university would pay $10.6 million in operating costs per year on both structures. On a per-year basis, Faust added, the operating costs are more than the city's cost to build the structures. The request also said that if the UA pulled out, the attendance at West Side museums would fall about 30 percent to 40 percent. "We need to fully fund the West Side campus and museums," Faust said. "The Science Center is like an anchor, like a Nordstrom is at a mall. You really need the anchor tenant in a redevelopment."

Hein called the UA's Friday request "poor political brinkmanship." He said he was "stunned they would take such an aggressive approach so early in the process" and suggested Faust is trying to "either stir the pot or corner the market." "The biggest impediment to the UA Science Center succeeding seems to be the UA Science Center staff," Hein said.

Cost explosion
The costs of the West Side museums have been escalating rapidly as the city gears up to approve $54 million for the Carrillo House and features of the San Agustín Mission, including the convento and Mission Gardens. When that $54 million is coupled with $166 million requested for the Science Center, $62 million requested for the state museum and $60 million to $70 million for a new Arizona Historical Society Museum, the costs approach $350 million. That doesn't include any price inflation or the costs for a potential new Children's Museum or library on the site.

Of the major museums, only the Arizona Historical Society has stated its commitment to substantially fundraise for some of its museum's construction price. Bill Ponder, the historical society's chief administrative officer, said he has a program to combine some Rio Nuevo money, some historical society money and fundraising to pay for construction.

So is $200 million in West Side Rio Nuevo money going to be enough? "I hope so," said City Councilwoman Nina Trasoff. "We have a limited pot. We have to be as responsible as we can." Councilman José Ibarra contends that the Science Center would be Rio Nuevo's most important feature, adding the city would be shortchanging Rio Nuevo if it didn't grant the funding requests for the West Side. "The West Side needs to get more than the $200 million proposed; it will have to be at least $275 million," he said. "I believe the priority has to be the West Side." The West Side should even take priority over a new arena, Ibarra said. "If that means the arena is in phase two (of Rio Nuevo), that has to be the reality," Ibarra added.

Donovan Durband, the Tucson Downtown Alliance's executive director, said that while it's good to honor the commitments to the West Side, a healthy portion of the money needs to be directed Downtown because after all, Rio Nuevo is about revitalizing Downtown. Councilman Steve Leal said he wants a list created of all potential Rio Nuevo projects and their costs to get a better idea of what should be spent where. "The larger issue is what are the lists of things needed and desired Downtown … both east and west," he said.
 
Articles like the above depress me. Nothing is ever simple. But the problem is compounded by a deficient filtering mechanism. Major projects need to be vetted, cost-estimated, and nailed down prior to public airing. When the costs are still fluid and rising, or when the funding is over subscribed, or when crucial design features haven't been decided, then the public legitimately understands the entire process is chaotic. Once you lose the public, the entire mission is imperiled.

Once again, this shows how Tucson lacks a strong core of elite business and community leaders. Since the inception of the Rio Nuevo the guiding hand has been tentative if not jerky. At some point, it might be wise just to start over, hold stakeholder meetings, get a sense of what's doable, and then redesign the entire concept. This project is starting to sound like a joke.
 
^^ I'm finally beginning to understand what a joke this is. I thought Rio Nuevo was about revitalizing downtown. That would mean, in my mind, subsidizing private development of homes and shopping, not building public structures like museums. Those, in most cities, would be funded by a subscription drive and by major donors with the city, perhaps, supplying the land. The Rio Nuevo money is looking to me like a pot of gold that all these public institutions that should be doing their own fundraising are planning to dip into. If it were up to me, I'd tell the U. of AZ to build its own "science center", whatever that is, if it wants one--ask a few rich alums for the money. And if the State Museum needs a rebuild, the state or more donors should pay for it as a separate matter because I don't think either one will do much for downtown. Downtown won't be actually vital until people live there and shop there--which means they have to be able to get there easily, making public transportation augmentation another worthy use of the Rio Nuevo money.
 
With all the additional TIF money approved, the next decade or so could be the last big chance (in our lifetimes) for Tucson to get its urban act together. Unfortunately, there is still no clear direction and focus to the city's efforts, which continues to undermine the confidence of locals that anything decent will ever happen downtown.

You would think that the well-paid Rio Nuevo director and staff should be able to initiate some real vision and direction for downtown's revitalization, and then galvanize the necessary support from both politicians and residents. If Mr. Shelko seems unable to do it, then find someone who can! (Of course, there must also be some visionary business and civic leaders behind it to make it all happen.) But enough of the incompetence already--Tucson is now a major metro area, and deserves better.
 
City is set to ask for bids on key Downtown plots
By Rob O'Dell
ARIZONA DAILY STAR
01.20.2007



larged-tparcels.png



For years Tucson's developers have urged the city to get out of the way and let it redevelop Downtown. Two more developers will get a chance to do exactly that in 2007, as the city is set to ask for informal bids to transform two key Downtown plots into new waves of homes, shops and maybe a health center.

The sites, both expected to be 15 acres or more, are in prominent locations near Interstate 10 — one just south of Congress Street on the Santa Cruz River and the other stretching along the I-10 frontage road adjacent to Barrio Viejo, from 22nd Street north almost to Cushing Street.

The 15 acres along the Santa Cruz will come first, said City Manager Mike Hein, likely being released in February. A request for bidders on the second property will probably come sometime midyear. The development on the West Side will come first because the city is further along in talks with the neighbors about what they want to see developed there. Hein said there will be another meeting next Thursday with the Menlo Park Neighborhood Association. "If we involve the stakeholders up front we're a lot better off," Hein said.

As for the Barrio Viejo request, "we're much further away on that side," Hein said. The city still needs to engage the residents and community leaders there, he said. Manufacturer and developer Don Martin, who has often been critical of the city and its involvement Downtown, said of the call for bids, "This is a good step in the right direction." He said the city needs three things: transparency, accountability and to be inclusive. "This process gives us all of those things," Martin said.

Rio Nuevo Director Greg Shelko said both projects are high priorities, and they are likely to be the last bid requests to go out until the issue of a Downtown arena is resolved. The private sector has expressed interest in several properties Downtown, Shelko said. "We should put the property out there and have the market respond."

15 acres on West Side
The 15 acres on the West Side are bounded by the Santa Cruz River, Congress Street and two planned new roads — the north-south Avenida del Convento and the east-west extension of Cushing Street. The property is just north of the planned Tucson Origins Heritage Park and several museums proposed for the West Side. It is directly east of the Mercado at Menlo Park, a mixed-use project now being built by Rio Development Co.

Development of the 15 acres will, for the most part, complete the development plans for the west side of Rio Nuevo. Menlo Park Neighborhood Association President Mac Hudson said that's a reason to get the project done right. Hudson said the neighborhood would like to see a mixed-use development with affordable housing built there. "We'd like to see it anchored with a public market that looks, smells and feels Tucson." Hudson would also like to see the planned modern streetcar line extended north from where it's supposed to end, just across the Santa Cruz River on the West Side, so it stops near the 15-acre site.

Hein said he believes Rio Development could submit a bid, since Rio is developing the adjacent Mercado at Menlo Park. Rio Development's owner, Gerald Dixon, did not return calls. Another project that has been talked about is a proposal by world-renowned physician Dr. Andrew Weil to build an integrative-medicine center on the site to promote health tourism in Tucson.

Cushing to 22nd Street
The more than 15 acres on the East Side of I-10, adjacent to Barrio Viejo, is a linear yet jagged piece of land. The request for informal bids to develop it will go out midyear, Hein said, giving the city time to meet with residents and resolve some issues about the property. The first issue is a long-term lease the city granted to a trust owned by the family of Rep. Gabrielle Giffords, D-Ariz., on the former El Campo Tire site off 22nd Street. Giffords' recent opponent, Randy Graf, made the lease and alleged environmental problems on the site an issue in the past congressional campaign.

John Wesley Miller, one of the developers who will submit proposals for the site, said the Giffords property complicates the deal, because he'd rather own than rent a property and because Giffords' lease is very lucrative. The second issue is whether the city's water plant for Tucson Water can be moved, to enlarge the project and make it more attractive to developers, Hein said. The Barrio Viejo neighborhood thinks the water plant is a good neighbor because it's "what they know," and residents don't trust the city, he added. Because of those issues, Wesley Miller said "the only thing I like about it is the location." His proposal will be called Barrio Viejo del Sol because every unit will have, at a minimum, a solar hot water system. The project will have 25 percent low-income housing.

Pedro Gonzales, head of the Barrio Viejo Neighborhood Association, said the neighborhood has one big requirement: low-income housing to keep residents and their families in the barrio. "We don't want no yuppie housing," Gonzales said. "Our main thing is preserve the families in the barrio. That's our main goal."
 
"We'd like to see it anchored with a public market that looks, smells and feels Tucson."

If it looks and smells like Tucson, the market might be doomed. lol j/k


I can't believe how long it has taken and the amount of money that has seemingly been wasted on Rio Nuevo. That's been on the "drawing boards" since well before 2000, when I first heard about it, and I'd be hard pressed to remember anything that has been built.
 
Even with a chilly real estate market, downtown condo construction is plodding ahead, albeit with fewer units, and most not available until 2009:


SantaRitasign.jpg

The Santa Rita Hotel, 88 E. Broadway, is slated for hotel and condo redevelopment. In contrast with
other Downtown businesses, the hotel's developers expects the housing demand will stay high.


d-tcondomap.png



New Downtown housing
Some developers see slowing market, cut their plans back

By Tom Beal
ARIZONA DAILY STAR
02.04.2007

Developers are whittling and revising Downtown's paper population of high-rise condos in response to a slowing real estate market. Over the past five years, developers have proposed about 1,200 condo units and more than 200,000 square feet of retail in and around Downtown. But a real estate market that produced the spectacle of people camping out overnight to snap up 120 Foothills condos in three hours in March 2005 has cooled considerably. For some projects, that change means a longer wait. For others, it means smaller buildings, more affordable prices or apartments rather than condos.

● For The Post, which expects to close on its deal with the city next month and break ground in April, it means half the number of condos once planned for the high-profile 100 block of East Congress Street.
● For 44 Broadway, it means scaling back the amenities being offered at the former federal court annex, a nondescript building, built in 1979 with the appeal of 20-foot ceilings and a location on busy East Broadway.
● For Depot Plaza on Downtown's east edge, it means apartments first, condos later.

The reconsideration of condo projects is happening everywhere. "I can tell you that in the Phoenix area the brakes are on," said Wayne Kaplan, spokesman for the Arizona Multihousing Association. Condo conversion in the Phoenix area "really started in mid to early 2004, peaked in 2005 and ended by middle to early 2006," said Pete TeKampe, senior investment associate with Marcus & Millichap. "Tucson tracked right along with that," he said. Tucson real estate broker Dan Wesson, of the Waterfall Group, said he lined up overnight with his son to buy four converted condos at Tierra Catalina, at East Skyline Drive and North Campbell Avenue back in March 2005. They resold quickly at a good profit, he said, "but that market's gone."

Wesson said most Tucson condo conversions are on hold. Downtown is a mostly untested market, he said, and initial projects could be a tough sell. "Right now, we're just a little early in the game, but I do think there's a little pent-up demand," he said.

44 Broadway
Ron Schwabe, general partner in 44 Broadway and a partner in the Depot Plaza project, said he's convinced the market for high-end condos exists, but he wants to lower his prices. "We're going to carve it back to something you can price affordably," he said. Original plans for the former courthouse annex included a lot of "bells and whistles" that sent the anticipated price above $300 a square foot.

The loft-condos themselves will still be upscale, he said, but he is reconsidering plans for a rooftop garden and major changes in the building's facade to make it possible to price some units below $200,000. "We're kind of crunching through the construction and design stuff," he said. The building itself has "good bones," said Schwabe, and allows for genuine lofts that make full use of the exposed metal trusses and high ceilings of the building. Developers of 44 Broadway have also negotiated with the city on parking requirements to increase the project's ground-floor retail space from 900 to about 7,000 square feet, he said.

Depot Plaza
The Depot Plaza project, meanwhile, is "ripping along," Schwabe said. "We'll have about 100 units of really fun market rate apartments right there," he said. Schwabe is the local partner with Williams & Dame of Portland, Ore., in Depot Plaza and a related project which will ultimately combine to cover the blocks on either side of 200 East Congress Street with apartments, condos and city-built housing for the elderly and disabled.

First up is conversion of the vacated Martin Luther King Jr. housing project into 85 market- rate apartments and 11 subsidized apartments, which the city will help underwrite. The lure of apartments is that you don't have to make back your costs right away, said Schwabe and Matt Brown, project manager for Williams & Dame. Nobody has to prove the demand for Downtown apartments to him, said Schwabe, president of Peach Properties, which manages a number of rentals in the area. Downtown space rents at a premium and vacancies usually fill by word of mouth, he said.

When Williams & Dame took on the Depot Plaza project, the Martin Luther King Jr. building was slated for demolition and replacement with a condo tower. Now, Depot Plaza Partners will rehabilitate the building's one-bedroom and studio apartments. "In essence, what we're doing now is a change of plan," Brown said. "Everybody has to consider the market."

The Post
At The Post, just east of Stone Avenue on Congress Street, Bourn Partners plans to build only six of the 12 stories it had once proposed for the site. Oscar Turner, Bourn's project manager, said his firm decided about a year ago to "scale the project down from 12 stories to a six-story, 45-unit building, with ground floor retail. "One of the reasons is that we perceived that the market wasn't maybe such a runaway market as it had been," Turner said. "If we proceeded with the big building, we worried we'd never get it done." The smaller project will be easier to fill, he said, and reservations are "doing well," though he declined to say how many units had been reserved. "Our initial response was better than expected but we're not sold out yet," he said.

Turner said Bourn will close its purchase of the property from the city next month and should be "in the ground" by April. Turner expects his project to prove the strength of the market for Downtown condos and lofts. "When it's finished and standing there, a broader group of people will be able to see the appeal," he said.

The Rialto Block
Doug Biggers said he's never doubted the market for the 14 apartments he's rebuilding in the historic Rialto Theatre block, just across the street from the Congress Hotel, and just east of the blocks now owned by Depot Plaza Partners. Biggers, who bought out his partners and sold the Depot Plaza land to its current owners, said progress has been slow for a variety of reasons. "Apartments, that's the easy part. The more difficult part is renting 12,000 square feet of retail," Biggers said.

Biggers said he had trouble persuading former partners to offer free or reduced rent to a restaurant and a green grocer he thought would be a good fit. "You look around and say 'We're pioneers — and pioneers often get slaughtered.' " Biggers, who once vowed to finish his project by the end of 2002, no longer makes predictions, though he has hired DesignBuild Collaborative Inc. to continue the transformation and hopes to meld his plans with the Congress Hotel block and Depot Plaza to make the intersection of East Congress Street and Fifth Avenue an even livelier entertainment block.

Depot Plaza's Brown said his boss, Portland redeveloper Homer Williams, is fond of saying: "Give me four corners and I'll create a neighborhood." "I buy that 100 percent," said Biggers. "That's why it is so important to me to bring Williams & Dame in. We're rockin' now." Biggers does promise that the historic building's facade, now gutted, will soon be restored to its 1920s glory. Replica windows and doors for the upper floors arrived last week and are being installed.
 
Suburban Oro Valley looking to add a 440 room, four-star resort and 220 condos in the Rancho Vistoso area:


OV-VistosoResort.jpg

Rendering - Vistoso Resort and Spa



Rancho Vistoso hotel and condos set
Oro Valley luxury complex work to start in September

By Levi J. Long
ARIZONA DAILY STAR
02.27.2007

A luxury hotel-condo project in Oro Valley could bring more options for leisure and business travelers frequenting the bustling Northwest burg. The Vistoso Resort and Spa, 500 W. Vistoso Highlands Drive, will feature 220 condo units and 440 hotel rooms and is scheduled to break ground in September, said developer David Williamson, president and CEO of Tucson-based Fairfield Homes Inc. Located near the 18-hole Golf Club at Vistoso, the hotel-condo complex is slated to open in September 2008.

Aimbridge Hospitality, a Texas firm that manages several hotel brands, wants to develop the Vistoso Resort and Spa as a Four Star and Four Diamond luxury property, Williamson said. A hotel operator that would lend its brand for the project has not been selected, but project managers are now speaking with possible operators for the project, he said. "That area is one of the better areas in the region and is one of the few golf course properties available in Tucson," Williamson said. "It lends itself to a nice high-end hotel. The market is definitely there."

The Vistoso Resort is part of a small wave of new hotels scheduled to open in Oro Valley, said David Welsh, the town's economic development administrator. Other planned hotel projects include the 100-room Wingate Inn at Steam Pump Village and the 100-room Spring Hill Suites at the Mercado del Rio center, both marketed toward business travelers.

The town is also looking at annexing land south of Oro Valley, including a parcel where the Omni Tucson National Golf Resort & Spa, 2727 W. Club Drive, is located. Currently, the only hotel options in Oro Valley are the 428-room Hilton Tucson El Conquistador Golf and Tennis Resort, 10000 N. Oracle Road, and the Holiday Inn Express, 10150 N. Oracle Road. "It's exciting. We're going from two hotels to possibly six," Welsh said. "There's plenty going on, and we could use the capacity."

While the Vistoso Resort and Spa would operate as a full service 440-room hotel, the property will offer 220 condo units for sale. Each unit features a "lockout bedroom," which has a different entrance and can be used as a separate guest suite. "It's for people who want a lifestyle of living in a four-star hotel with room service and having a concierge," Williamson said. "And if you don't want to be there, you can get rental income from it. That's the main attraction for people who are looking for an investment but stay a few months a year."

Pre-sales at Vistoso should begin in 90 days, with the prices for condos expected to start at around $400,000, said Bryan Welch, the Vistoso's designated broker. Potential owners can buy the condo and, when its not occupied, can enroll it in a rental program, Welch said. The sales and rental program is similar to Williamson's other hotel-condo project, the Wyndham Canoa Ranch Resort, in Green Valley at 5775 S. Camino del Sol. Canoa Ranch has 288 two-bedroom condo units that range from 1,500 to 1,700 square feet and start at $400,000. The $100 million Canoa Ranch Resort, which opened in January, has sold all of the condos planned for phases 1 and 2, Welch said. About 20 units are left in phase 3 of the four-phase project, he said.

Room rentals at the Wyndham have also been fully booked, he said. "It's the high season. All of your buyers and visitors are in town now," Welch said. The Vistoso Resort and Spa will feature 1,100-square-foot, two-bedroom condos, furnished and professionally decorated. They will include plasma screen televisions in the living room, master bedroom and second bedroom. A 10,000-square-foot spa is planned for the property along with 30,000 square feet of banquet space and a rooftop bar with a view of the Catalina Mountains.
 
^The proposed Century Tower project has languished for a number of reasons:

1. It was a nice idea to give Tucson a new "tallest" skyscraper, but the demand for another large downtown hotel topped with condos starting at $400,000+ just isn't there--yet. (And building luxury condos in downtown Tucson is even riskier than in downtown Phoenix.)

2. The idea of the city giving up the green next to the Central Library for this project was questionable, and Tucson's NIMBYs were prepared to fight it.

3. The named developers were very inexperienced for a project of this size and complexity (e.g., the original projected cost for this 27-story tower was seriously underestimated at $55 million).

Also, with relatively little downtown commercial office space to spark hotel demand, and the proposed expansion of both the Hotel Arizona and the Santa Rita Hotel with their accompanying condos in the downtown area, the prospects for Century Tower being built anytime soon are probably zilch.
 
Cost Versus Culture

Tucson's Warehouse District fights an uphill battle to survive

By DAVE DEVINE and MOLLY MCKASSON
Tucson Weekly

For years, downtown's Warehouse District has been blessed with good intentions, personal commitment, private investment and political pledges of support. But it appears that will be no match for deteriorating historic buildings, impacts from a new roadway, public apathy and insufficient funding.
Yet even as the specter of a wrecking ball hovers over several buildings north of downtown, Mayor Bob Walkup remains upbeat.

"We're trying to do everything we can to keep the Warehouse District and allow artists to stay where they are," he says.

But Sarah Clements, who managed the Tucson Arts District Partnership during the heyday of the Warehouse District a decade ago, doesn't see a realistic counterattack in place. "It sounds as though we're taking a giant step backward," she says.

The most serious district battle is occurring near the intersection of Sixth Street and the railroad tracks. Preliminary shots have been fired about the possible demolition of the Citizens Transfer building, which contains numerous artist studios.

But the building in the most jeopardy sits directly south, across the tracks: a large 1907 structure built as storage space for the growing retail empire of Albert Steinfeld that's now considered the flagship of the Warehouse District.

After contributing greatly to the commercial success of downtown, the Steinfeld Warehouse was purchased by the Arizona Department of Transportation in the early 1980s. It was slated for demolition to make room for the last mile of the Barraza-Aviation Parkway, but that project has yet to be built. For more than 20 years, the space has been leased at low rates to artists, who were joined a few years ago by longtime local art institution Dinnerware Contemporary Arts.

Although the artists have continued to pay low rents, the artists have also been responsible for the high cost of maintenance and repairs. But with few funds and no ownership stake, they have not invested the substantial amounts needed to properly rehabilitate the century-old brick building.

In November, ADOT notified their Steinfeld tenants, along with the owner of the nearby Zee's Mineral Gallery at Stone and Toole avenues, that they had to move by January. While citing concerns about the structural integrity of the buildings and public safety, ADOT retreated a little after the city of Tucson intervened, giving the artists until March 31 to get out.

Bundled up to combat the cold of a winter afternoon in the drafty Steinfeld Warehouse, Charles Alexander, of Chax Press, summarizes the feelings of many who work in the district: "I want to fight the good fight and stay, but I'm not confident I can. I have to find space to keep working."

As the current president of the Warehouse Arts Management Organization, Alexander is discouraged by the response of local government officials to the area's plight, which he characterizes as a big yawn: "There's not much political will to make things happen quickly."

Bob Robles, one of the Alamo Woodworkers who are longtime tenants of the warehouse, sees the battle to save the structure as a microcosm of downtown's struggle. "If this building is torn down," he declares, "then Tucson turns into Anytown, USA."

The Steinfeld artists are becoming increasingly realistic about their chances of saving the building. In a community known more for its re-creation of historic buildings--the proposed Convento, downtown's Hotel Catalina, the Presidio, etc.--than preservation of the original structures, the hopes of winning the warehouse battle are flickering.

Ceramic artist David Aguirre, executive director of Dinnerware, has worked in the Steinfeld Warehouse for two decades and manages the building.

"I hope to keep all the tenants together, and I'm looking into new locations, but we may not be able to stay downtown." But at the same time, he is still investigating central-city locations.

As a reflection of all the uncertainty, Dinnerware will have an art auction in a few weeks. If necessary, Aguirre says, the proceeds will be used to help pay for the gallery's relocation expenses.

In early December, looking to City Hall to help defend the artists against ADOT's eviction notice, WAMO presented a list of recommendations to local leaders. To avoid being kicked out, the group requested the municipal government "immediately inform ADOT of the city's intention to acquire control" of the two buildings, and commit to a renovation schedule.

As it turns out, those recommendations never made it to Lou Ginsberg, the city's designated point person working with district artists. When shown a copy of the proposals a few weeks ago, a surprised Ginsberg insists: "I never got the WAMO report."

Yet in the battle to preserve the Warehouse District, both city employees and elected officials believe they are waging "the good fight."

City Manager Mike Hein talks about all that the city has done since the ADOT eviction notices were delivered, and thinks those who criticize the city for a lack of action have been asleep. "We negotiated with ADOT (about a two-month time extension), had discussions with the governor's office, started finding alternative locations for the artists and are doing studies about the buildings," he says.

Ginsberg has had preliminary discussions with Aguirre and Alexander on relocating the tenants of the Steinfeld Warehouse. Proposing to use funds volunteered by the local government, this process is in its infancy and would require City Council approval.

While Hein expresses support for the Warehouse District and acknowledges its importance in being one of several downtown anchors, he won't commit the city to acquiring either the Steinfeld or Zee warehouses.

"Do we have to do anything at any cost to keep the current buildings?" he asks. "I can't answer that. ... You always want to build on the history you have, but it's not always possible to do that."

Midtown City Council Member Nina Trasoff--a vocal supporter of the district--reinforces that financial concern. "I've heard figures for the Steinfeld Warehouse from $2 million to $12 million to fix up the structure," she says. "How much can the city pay, and how much can we subsidize? In an ideal world, we very much want to save both buildings."

Reacting to the possibility of losing this battle, Council Member Karin Uhlich declares: "If artists continue to leave the downtown, I think that's part of the soul of the city leaving, and I would be very disturbed. ... (Losing) this district would be a huge loss."

After the eviction notices were delivered, City Council Member Steve Leal, who sits with Trasoff on the Council's Rio Nuevo/Downtown Arts, Culture and History Subcommittee, tried to lead a countercharge by suggesting the city designate a few million dollars of Rio Nuevo funds to the Warehouse District. So far, his proposal has gone nowhere, although the subcommittee on Feb. 15 finally approved sending a letter supporting an eviction delay.

"The deadline has to be extended," Leal says of ADOT's decision, "and the city needs to acquire the buildings. (If they're auctioned to a private developer), then none of the artists--the frontier 'settlers' that helped downtown (survive)--will be able to afford to stay there. It's over!"

ADOT is often painted as the enemy of the Warehouse District, but it's worth noting that ADOT has leased cheap space to artists for years without interfering too much. If the agency decides to sell the Steinfeld and Zee warehouses, the city might acquire them, or they could be put on the market for anyone to purchase. Under either scenario, the structures would probably require extensive renovation before being reoccupied.

Within the artists' community, city staff members are vilified for expressing concern about potential liability issues and the high cost of bringing the warehouses up to current building-code standards if the city acquires them. Even though the warehouses have been under the control of the state fire marshal since ADOT purchased them, these cautionary comments from local officials have continued to raise the threat of unmet code requirements.

But perhaps the most insidious enemy of the district is the free market. If the buildings are rehabilitated, and those high costs are passed on to the artists, how many of them will be able to afford the rent?

Zee Haag, who prefers to go by just his first name, has a plan to repel that attack. He's made ADOT an offer to buy his building, but he needs City Hall to act quickly as a middleman, and so far, all discussions are extremely preliminary.

Zee estimates it might cost at least $500,000 and take up to one year to rehabilitate his warehouse--but he does not waver from that challenge. "I certainly want to buy the building, because getting out of there is the last thing I want to do."

But in the meantime, Zee has two large inventory-liquidation sales planned, one in Los Angeles. "I never noted that government authorities move very quickly," he observes.

So thus far, all the efforts to save the threatened warehouses are only on paper. With the state's eviction deadline drawing closer, and some Warehouse District artists apparently in retreat, the city is paying for three new studies.

A $2,500 report by structural engineer Jerry Canyon looked at the Steinfeld building and concluded that while it needed some "shoring and bracing," emptying the warehouse wasn't necessary. Based on that finding, Alexander and Aguirre have asked for the reversal of the eviction decision.

A study by architect Corky Poster, estimated to cost $50,000, is reviewing the Steinfeld Warehouse and the Citizens Transfer building across Sixth Street. Poster indicates, however, this report will be completed in April, after the eviction deadline.

Near the end of March, Minneapolis-based firm Artspace will be in town conducting a general analysis of the entire Warehouse District. Alexander says of this $6,500 effort: "They'll identify what can be saved and economic resources and gain political will."

Chuckling, the WAMO president adds: "Of course, I may not be (in the Steinfeld Warehouse) then."

Artist Susan Johnson remembers there were 100 artist studios congregated around Congress Street and Sixth Avenue in the 1980s. Due to construction of the Ronstadt Transit Center and other projects, she says, artists migrated north to the Warehouse District.

"It's taken 20 years for us to re-create this community in the Warehouse District," Johnson says, "and now that it's together, now that it's a real community, we're being asked to move again. It doesn't make sense."

How did one of the nation's most promising warehouse districts become such a battleground? Things started out better in 1988 when a downtown arts district plan prepared by a New York City consultant stated the warehouses located west of Fifth Avenue and south of Sixth Street "provide excellent arts studio space and loft environments suitable for a mix of uses."

Around this same time, ADOT purchased more than 20 warehouses adjoining the railroad tracks that bisect the north side of downtown, intending to demolish them to implement the last mile of the Barraza-Aviation Parkway. Since the project's construction schedule was uncertain, the state offered month-to-month leases to artists.

In the 1990s, as plans for the parkway changed--meaning as few as six buildings would come down--the area blossomed with 120 studios and almost a dozen galleries. Concurrently, the Tucson Arts District Partnership began to fight for the preservation of the emerging Warehouse District.

About a decade ago, the City Council signified its interest by adopting a series of policy statements. These included preserving both the historic buildings and art space while maintaining affordable rents.

"Tucson was definitely at the forefront" of the national interest in converting warehouses into artist studios and galleries, recalls Mary Ellen Wooten, who worked for the Tucson Arts District Partnership back then and is now with the Tucson/Pima Arts Council. "We got calls from all over the place."

Using city funds, the partnership established a loan program for warehouse renovations while spearheading the effort to list about 60 structures in the district on the National Register of Historic Places. This is a federal government designation that is mostly symbolic, offering little protection from demolition.

As interest in the Warehouse District grew, the private sector began to invest in the fight to save an "old town" that is uniquely Tucson. Thanks to folks like businessman Mark Berman, artist Susan Gamble and her sister Lesley, investor Ron Schwabe and many others, several buildings directly north of the ADOT-owned properties were purchased and rehabilitated for artist uses. These include the Davis Dominguez Gallery, Santa Theresa Tile Works, DeWitt Designs furniture and the Gallery at 6th and 6th, located in an old Firestone store.

In 2003, the Arts District Partnership was preparing a new vision statement for the Warehouse District, a contentious process which caused conflict with City Hall. It wasn't surprising when local government support for the organization was terminated, basically ending its existence.

At the same time, the city took over from ADOT the management of several government-owned warehouses and proposed considerably raising the rock-bottom rents. The additional funds would have been slated to maintain and upgrade the structures while implementing physical improvements throughout the area, but artists balked at the proposal, and it quickly died.

City support for the district apparently peaked in 2004 when Poster Frost Associates was hired to prepare a master plan for a portion of the district. While the plan was full of wonderful ideas, it was short on ways to pay for them.

The plan's most important suggestion was shifting the Barraza-Aviation alignment exclusively to the north side of the railroad tracks, which pleased the warehouse tenants along Toole Avenue since it would save them. This change, though, also made other district buildings vulnerable to the roadway's impact.

Last May, Pima County voters approved increasing the sales tax to pay for transportation improvements. One of the projects to be implemented is the $76 million last mile of the Barraza-Aviation Parkway, now known as the Links proposal.

Current plans for this new roadway--a four-lane route scheduled to be under construction by 2011--will increase traffic in the area of Sixth Street and Stone Avenue to more than 50,000 vehicles a day, more than doubling the present volume. Congestion will get much worse, with rush-hour traffic backing up for blocks and intersection levels of service expected to fall dramatically.

Berman runs Benjamin Supply Company out of the huge former Tucson Transfer warehouse at the intersection of Sixth Street and Seventh Avenue, right where the Links road will join Sixth Street. He observes: "This project is the ultimate boondoggle. It won't get traffic out of downtown." What it will do is doom his business, as the alignment cuts off access for large delivery trucks.

In addition to its transportation impacts on the district, the roadway will require the demolition of two, three or possibly more warehouses, including Small Planet Bakery. Combined with other recent demolitions, this would mean the loss of at least 10 percent of the district's total buildings.

Questions also continue to surface regarding the former Citizens Transfer warehouse on Sixth Street. Today, it houses artist studios as well as BICAS (Bicycle Inter-Community Art and Salvage), but the building may have to go to make room for a Sixth Street cars-only underpass planned to go under the railroad tracks as part of the Links project.

Also in 2006, the City Council approved a condominium proposal for the vacant land immediately east of the Steinfeld Warehouse, even though artists vehemently protested that it did not fit the adopted master plan.

Several months earlier, a private developer intent on constructing condominiums razed the former YMCA building on Sixth Street, which had housed many artist studios. Some of them have fortunately moved back downtown into space around the Ronstadt Transit Center.

Today, the city collects approximately $16,000 in monthly rent from the buildings and parking lots it manages in the Warehouse District. Using these funds, substantial improvements have been made to two buildings, while others wait for attention. However, the city last year demolished a key warehouse it had managed at Sixth Street and Stone Avenue, citing public-safety concerns.

"A roof repair alone costs $100,000," declares John Updike, who once oversaw the city's maintenance program and is currently employed by San Francisco's real estate division. "It was a huge amount of money given the fund. ... We did the best we could."

The Museum of Contemporary Art on Toole Avenue occupies two of the buildings managed by the city. Last June, the museum at 191 E. Toole Ave. was closed because it failed to obtain a required certificate of occupancy.

After the organization recently opened Concept MOCA (a combination kiosk museum/gift shop) across the street at 174 E. Toole Ave., the mayor and City Council approved a deal with the group. This allows the nonprofit MOCA to have a long-term lease at $1 per year with the possibility of purchasing the city-managed properties it rents. In exchange, MOCA is financially responsible for all building maintenance.

MOCA's director, Anne-Marie Russell, says the arrangement "will help the board kick off a massive building campaign to raise $400,000 to $500,000. ... In two to three years, our goal is to renovate the end building, 197 Toole (still under ADOT control), and turn it into MOCA's main gallery space."

To Ginsberg, the MOCA agreement is a good model for future city-controlled warehouses. Others, however, are concerned that arrangements like this will cause tension in the district.

In order to proceed with their plans, MOCA has been encouraging artists to move out of 197--a building which was renovated years ago with the aim of creating affordable studio space. One artist, Beckie Kravetz, refused to leave the studio she had worked in for 15 years. As a result, MOCA evicted her in January (See "Getting Toole'd," Currents, Feb. 22).

Meanwhile, the historic Steinfeld building, surrounded by adversity and threatened by both roadway improvements and physical deterioration, may end up surrendering to the wrecking ball. If the centerpiece of the district falls, how soon before a similar fate strikes other historic warehouses?

It's worth noting that in the Steinfeld building, Chax Press presents international programs and is the recipient of numerous national awards and grants. Two other tenants have also received the prestigious Arizona Arts Award, the largest state award given to any artist.

Weary of the constant battle, longtime advocates and members of the warehouse community are feeling discouraged.

Alamo Woodworker Robles laments: "It seems that a lot of people in the city think of us (artists) as slackards and parasites, not really adding to the life of the city. ... For me, this has been a big reality check to find out that we artists are not really valued."

Mike Dominguez, co-owner of the Davis Dominguez Gallery, diplomatically hopes that perception will change.

"I wish that people in our metropolitan area would be more aware that we are an industry with businesses, institutions, workers, and we have an impact on the economy of the community besides our own spending power. ... We are a main factor for people moving here: The culture we represent draws people and businesses."

Kravetz summaries what the district means to thousands of artists and art lovers in town. "The bottom line about being an artist is that it's a solitary pursuit. The Warehouse District creates a real community so that artists are not so isolated, they can interact and help each other. We can trade ideas as well as materials. It's all about community."

But in the coming months, if there's no change in Warehouse District direction, Tucson's unique downtown arts enclave may be headed for oblivion. And that would be a loss to the entire community.
 
^Preserving unique, affordable space for artists and other creative types in gentrifying areas has always been problematic. And that's why it's even more important to have viable community plans in place, so residents understand the future direction and focus of their neighborhood and how it will grow and evolve. (Of course, politicians are often beholden to the wishes of deep-pocketed developers, and want to grant variances that subvert the best-laid plans, which predictably infuriates their constituents.) And it is exactly this sort of behavior by local politicians in the past that has fueled a rabid core of NIMBYs in Tucson that are so bitter and distrustful of their elected officials.

Obviously, dismantling the artist community and the historic structures in the Warehouse District would be a huge blow to downtown Tucson's uniqueness. Certainly, there must be a way for the city to finish the Barraza-Aviation Parkway and still leave most of the warehouses and their tenants intact. However, the artists surely knew that their rock-bottom rents couldn't last forever, and they must be willing to now shoulder more of the ongoing maintenance and rehab costs of these warehouses, if not buying them outright.

Razing the historic buildings for a wave of of new ones would be the worst of all options, in my opinion, and only compound the grave mistakes of downtown's past "redevelopment" efforts. Surely the city has learned a lesson or two from that, and hopefully the artists can join together and hammer out a more ironclad community plan with City Hall to preserve their historic neighborhood--but this being Tucson, I won't hold my breath.
 
^what's frustrating here is that virtually every civic model extant shows the incalculable value in preserving old buildings. A warehouse district is urban gold. Yet Tucson is still stuck catering to its traffic engineers and its parochial Trump-style developers.

I'd prefer artists in those spaces but preservation of the buildings is primary. At some future date, people might actually prefer buildings hugging the street to urban freeways. In the meantime, it's imperative to keep the template in place.
 
After spending far too much time contemplating pie-in-the-sky proposals, City Hall is finally realizing that the spending of Rio Nuevo funds needs some serious prioritizing, and infrastructure requirements for future development should be at the top of the list:


Downtown Tucsonan
March, 2007
Editorial


Two issues have been consistently noted by critics as having been missing from the Rio Nuevo/Downtown revitalization equation: private sector participation, and a public sector focus on the fundamentals.

Both issues are being addressed simultaneously this spring, as City, County, and private sector leaders are coming together to address the most fundamental of fundamentals: Downtown’s inventory of infrastructure capacity and the need for infrastructure to support future development.

A diverse group of business, neighborhood, and community leaders that I meet with every Friday morning has been calling, for the last several months, for the City to develop this infrastructure inventory, in partnership with the utility companies and developers. In fact, we argued that infrastructure needs must be assessed first before decisions on other major Rio Nuevo projects be made. In December, our request fell upon friendly ears at the city council, which asked that such a report be completed within a few months.

Heart of Downtown Award winner Michael Keith (Franklin Court, Cheyney House restoration) has taken the lead with identifying the basic outline of what these needs would be, and recently he and the aforementioned City, County, and private sector leaders met to commit to an aggressive timeline for getting a useful report completed. Funding and resources were committed, and the group is setting a mid-April deadline for this project’s completion.

It’s easy to forget about infrastructure. Sewer lines aren’t interesting. Visitors don’t come to look at water pipes, landscape irrigation systems, or electrical transformers.

Even though the 2001 Rio Nuevo Master Plan estimated the need for $50 million of utility infrastructure, that part of the plan received scant attention. It was much more interesting for the community to focus on the proposed aquarium (the idea was discarded), the science center (approved for $20 million of Rio Nuevo funding in 2003, before the scale of the project ballooned beyond any sense of proportion), museums (more funding is needed than Rio Nuevo can possibly provide), and whether or not to build a new arena (major topic of discussion in the next few months).

Without the decidedly un-sexy infrastructure, however, the science center, museums, arena, hotel, or any of the private development that will bring retail and entertainment to Downtown will be impossible. Infrastructure simply must be dealt with. And, identifying the needs implies that the costs for providing the infrastructure will be determined, which is critical if a meaningful financial road map for Rio Nuevo is to be developed.

Infrastructure isn’t ALL boring, though. Streets, underpasses, bridges, sidewalks, and modern streetcars are part of the infrastructure as well, and as Thomas Whittingslow’s article on page 8 indicates, final decisions on the Downtown portion of the modern streetcar’s alignment have now been made and are ready for final council approval before being incorporated into the City’s application for millions of dollars in federal funding. This is also very good news.

Think about the next three years or so, with the construction of I-10 messing things up from Prince Road to 29th Street and forcing tens of thousands of motorists to alter their daily commutes. There has been much public hand-wringing about the considerable anticipated inconvenience, but the silver lining is that it provides a window for the completion of other major construction projects.

If we can get the following projects substantially completed by the time the freeway work is done, we will be in great shape to move things ahead quickly after the ramps have been reopened:

• Basic utility infrastructure where it is needed most, along the spine of the modern streetcar line, serving major construction projects such as the possible arena, new hotel, and expanded convention center

• The 4th Avenue underpass, essential to getting the modern streetcar across the barrier of the railroad tracks

• The new bridge over the Santa Cruz River, a wide new underpass at Cushing Street, and Cultural Plaza infrastructure—all of which were approved for funding in December

• The modern streetcar itself, operational by 2010

• If approved later this spring, expansion of the convention center, new arena, and new convention-headquarters hotel at the site of the present The Hotel Arizona

• Getting a handle on infrastructure needs elsewhere and committing to a plan for funding its installation


That would be a lot to accomplish in the next three or four years, but it seems that we are poised to make the commitments necessary to get most, if not all of those projects moving this year.

If we managed to accomplish all of that by 2010, I guarantee that we won’t be having conversations in 2015 about why Rio Nuevo is moving so slow.

Donovan Durband
Executive Director,
Tucson Downtown Alliance
 
Neighborhood input has been fine-tuning the alignment of the proposed streetcar system for downtown Tucson, planned to run from the UofA to just west of I-10 in the Mercado District of Rio Nuevo--and in a best-case scenario, will be up and running in 2010:



Streetcar Alignment Decided
Department of Transportation ready to move Modern Streetcar plan to Feds

by Thomas Whittingslow
Downtown Tucsonan
March, 2007

Until recently, many questions about the Downtown segment of the planned modern streetcar route were unresolved. In order for the City to advance its application to the Federal Transportation Administration (FTA) for funds to match the local RTA commitment, a “Project Definition” must be approved by the local governing body, the city council. With a recent agreement between the City and various stakeholders that the western terminus of the streetcar line will run north from the Cultural Plaza of Rio Nuevo, along the new Avenida del Convento, to Congress Street, it appears that the route has been finalized, and the Project Definition is in sight.

The one-third-mile-long section of tracks connecting the proposed museum campus with Congress Street, opposite the El Rio Center, would run between the Mercado at Menlo District development already under construction, and a 14-acre site that is being offered by the City for sale to qualified developers. Coupled with a solution for crossing I-10 and the Santa Cruz River, and agreement on the streetcar’s route along Congress and Broadway between The Hotel Arizona and the 4th Avenue underpass, the decision on the western terminus allows TDOT to bring a final alignment plan forward to the Mayor and Council. According to Andrew Singelakis, Deputy Director of TDOT, the next step will be formal ratification of the “locally preferred alternative” alignment by the Council, scheduled to take place on March 27th. With the routing issue finally resolved, the City can now successfully compete for the federal funds necessary to begin construction.

This is clearly a victory for Lillian Lopez-Grant, who made appeals to extend the line’s terminus north from the Cultural Plaza along Avenida del Convento. Lopez-Grant is a Menlo Park resident and president of the Westside Coalition of neighborhoods. The Avenida del Convento extension would allow service to the new Mercado at Menlo District mixed-use project, as well as the established residents of Menlo Park. It is also good news for Donovan Durband, Executive Director of the Tucson Downtown Alliance and other advocates who see the Modern Streetcar as a catalyst for private mixed-use development along the line.

“This is a people-moving system, rather than a commuter train.” said Project Director Shellie Ginn. “It extends people’s pedestrian opportunities. The unique problem that we’re having with this project is that everyone wants one more piece, one more access.”

The final route for the line starts at the University of Arizona on Helen Street, west of Campbell Avenue, then continues south on Cherry to the UA student housing centers along 2nd Street to Park Avenue. From the Main Gate Square business district it follows University Blvd. west to 4th Avenue, where it continues south past the shops, restaurants and nightclubs to the new 4th Avenue underpass. The line is split between Congress and Broadway, with a set of tracks on each street, and the two tracks converge west of Veinte de Agosto Park.

The streetcar line will service the Historic Depot on Toole Avenue, the Warehouse Arts District, Ronstadt Transit Center, City Hall and the Federal Courthouse. One of the criteria is to provide easy pedestrian access to such venues as the Fox Theatre, Centennial Hall, the Main Public Library, as well as the Tucson Convention Center, new hotel, and the public and private projects on the West Side.

With the Project Definition phase completed, only two major tasks remain before construction on the line can begin. First, an environmental impact study must be conducted, and additional funding must be obtained. According to Shellie Ginn, Project Director, “The entire process could be completed in about two years.” Ginn is enthusiastic about the pace of the process.

A major portion of the funding has already been obtained. The Regional Transportation Authority election provided $90 million, or about half of the capital costs for the development of the system. Once the environmental impact study is complete, Ginn and her consulting team will develop grant applications to the FTA’s Small Starts program for the balance of the funding. If all goes well the system could be operational by 2010.

Downtown Portland, Oregon, often cited as the cutting edge of urban innovation, is often used as a model for the Tucson system. According to USA Today, “Portland’s Pearl District, a new urban core, has attracted about 100 projects worth $2.3 billion in less than five years, all within two blocks of the line, including 7,428 housing units. Ridership was more than triple the projections.” In the same article Len Bandrup, Director of Transportation for Kenosha, Wisconsin said, “Streetcars have sex appeal. It resonates with folks…developers don’t write check for buses.”

In some cases where modern streetcar projects have enhanced the value of planned communities, developers have participated in the funding. We asked the Tucson transportation department if Rio Development or other developers will be approached to participate in funding of the Tucson line. “That is one of the areas that we will be looking at,” said Ginn.
 
TUCSON: Not what it was, nor what it might still be
Jon Talton
Republic columnist
Mar. 18, 2007 12:00 AM

When I was a child, my mother would take me to Tucson on the train. Yes, we had train service then. We would spend the day there and return home to Phoenix that night on the Southern Pacific Railroad's crack Sunset Limited streamliner.

Tucson was so different. Where Phoenix was green and lush, Tucson was dusty and desert. Phoenix was new, while Tucson was old. Phoenix was so Anglo yet Tucson was exotically Hispanic; as a weird kid savant, I knew that if not for the Gadsden Purchase, Tucson would have been a city in Mexico.

Tucson had "the university" and Phoenix was a fast-buck builders town. From conversation around our Republican dinner table, I knew Tucson was Democrat. Tucson hated Phoenix, while Phoenix stoked that hatred by paying no attention to Tucson.
Now metro Tucson has crossed 1 million people. It's a milestone that has caused local celebration and soul-searching.

Joining the million club isn't what it once was. America didn't see a city with more than a million until New York reached that number in the 1880 Census. Even now, American cities with more than a million remain in an elite club of nine.

On the other hand, Pima County joins more than 50 metropolitan areas with at least a million population in a nation of 300 million. Metro Phoenix added more than a million in the 1990s alone. An estimated 1 million illegal aliens live in greater Los Angeles.

A million residents once meant substantial national and even international power. But as Americans have migrated out of the great cities to Sunbelt suburbs, the economic and cultural assets have often stayed behind. And an economy built around urbanization often favors the largest urban areas.

Thus, the million in metro Tucson must look to Phoenix for the big-league sports, big-city vibe and big-time airline service that once would have been givens for such a populous region. The economic well-being of a metropolis is not a given, either.

In the 2003 Census update, Pima County was below both metro Phoenix and the state as a whole in per capita income and median household income. The results were even worse for the city of Tucson, which makes up about half the population, where a shocking 25.5 percent of children live in poverty.

Tucson enjoys some major assets, too, including Raytheon, an entrepreneurial optics sector and promising bets in biomedicine and medical devices.

The University of Arizona remains a big part of the region and its research is one of the most important keys to the future economy.

Yet when I go to Tucson now, I'm struck by how much it looks and feels like Phoenix. What a loss. Part of this is the unfortunate homogenization of America and part the sameness of suburban building. It also represents roads not taken by Tucson.

Although progressive by reputation, Tucson didn't turn out like Portland, Ore., a similar-sized metro area famous for its transit, environmental record, smart economy and emphasis on livable, walkable city neighborhoods.

In some ways, such as wildcat subdivisions, Tucson faces worse sprawl problems than Phoenix. Traffic is a mess. The hated megalopolis up the interstate is building assets that make it seem like the progressive Arizona city.

Native Linda Ronstadt tried to return home to Tucson but gave up after a few years, returning to San Francisco. "She left Arizona," reported the San Francisco Chronicle, "because she could no longer stand the strip-mall culture and right-wing mentality."

If you believe that urban Arizona's future is a continuation of its past, and we'll somehow muddle through, this is no big deal. People are voting with their feet, moving here.

If you're convinced that the future will be very different, from climate change, high energy prices, scarce water and global competition . . . well, you see the dangers facing any desert urban area based on the assumptions and habits of the mid-20th Century.

Tucson enjoys some magnificent opportunities. The charming old city is waiting to be reclaimed and the natural setting still takes the breath away.

But the one thing Tucson will never again be is what so many long for: a small town that didn't face the challenges of places like Phoenix.



Reach Talton at [email protected].
 
^Even as Tucsonans rail against Phoenix as the evil big sister to the north, while driving down Grant Rd. last summer, I thought I had somehow been transported to Hermosillo. Here was one of Tucson's major thoroughfares riddled with potholes, weed-choked abandoned lots were strewn with trash, and tacky roadside signage with peeling paint proliferated--certainly not a portrait of a model or progressive 21st-century city.

But even more importantly, Talton's article hints at some of the larger challenges facing most of our desert metropolises, including Tucson. The reality of limited natural resources in an age of global warming is quickly becoming part of the zeitgeist, as exemplified in a new movie trailer I saw the other day picturing a futuristic Las Vegas--sand dunes blowing through the abandoned and tattered hotels and icons of the Strip, armed renegades battling for control of what remained of the abandoned city, a la Mad Max.

While not wanting to sound too apocalyptic, adding many more years of intense drought coupled with a severe economic downturn or domestic political unrest, such a grim future may be closer than any of us could imagine.
 
Last edited:
Apparently the redevelopment of downtown's Santa Rita Hotel--closed since 2005--is moving forward, with a targeted completion in late 2009. The project will include a remodeling of the existing structure into a boutique hotel of 66 rooms and 48 additional "condotel" rooms, plus a new 5-story building with 99 condos and a gourmet market:


SantaRitaHotel-newfacade.jpg

rendering - facade of new Santa Rita Hotel (inset: sketch of original building)



Santa Rita Hotel site to get $75 million overhaul
TEYA VITU
Tucson Citizen
3.20.2007

The shuttered, century-old Santa Rita Hotel will launch a journey back to the future this summer when a 1940s-era facade replaces the weathered, banal 1970s look. Developer Mike Teufel and El Charro Café CEO Ray Flores Jr. have teamed to create a boutique hotel in the storied downtown 1904 hotel at Broadway and Scott Ave. that shut down in 2005.

Along with 66-hotel rooms, they plan to devote another 48 rooms to condo hotel rooms - people own the rooms but when not in residence can lease them back for use as hotel rooms. Think snowbird owners when they head back to the Midwest or East Coast. They also plan to add a second structure at the spot with 99 condominium units, a parking garage and a gourmet supermarket. They plan to live there themselves.

They believe their $75 million project will have a ready market of attorneys, doctors and professors when the Santa Rita block is ready for occupants toward the end of 2009. "I've been downtown forever," said Flores, whose mother, Carlotta, runs the kitchen at El Charro Café. "There is a pent-up demand for a product like this. Something big needs to happen downtown."

Teufel and Flores join other downtown housing projects, in various stages of completion, that include Ice House Lofts, Academy Lofts, Armory Park del Sol and Mercado District of Menlo Park. The Santa Rita Hotel sits within the Rio Nuevo district but is not listed as a Rio Nuevo housing project nor are any government incentives involved, Teufel said. "The property is ripe for redevelopment," Teufel said. "It's probably the best block of redevelopment downtown."

The hotel lobby area will feature a restaurant and bar. Flores envisions lounge seating and tapas-style appetizers. "It can be a business meeting that parlays into a social event," Flores said. "This will be a gathering place, where people can walk in and visit, something you might find in downtown New York or Los Angeles. I want to create a venue that creates energy for downtown." The duo also promises a 15,000-square-foot high-end gourmet grocery on the ground floor of a new condo building along Broadway. They are in negotiations with a grocer they aren't naming yet.

On the construction side, the first order of business will be peeling away the facade on the eight-story Santa Rita Hotel building, which project architect Kevin B. Howard describes as "a monument to the banality of architecture of the 1970s: wall-mounted air conditioning units, very cheaply manufactured steel balcony units, eight stories of blank wall." In its place, Howard has sketched out a 1940s Spanish colonial style building, which was the Santa Rita look in that era: Spanish pipe tile roof, arches with carved detail framing the porte-cochere, stucco popouts and canterra stone popouts around the windows, deeply burnished rusted steel wrought iron balcony railings.

Colors are not decided yet but will be subdued in context with the colors found downtown. Howard is studying documents to determine what the original colors were in 1904. The new five-story condominium building will have two-story glass windows, metal awnings for shade and metal railings. Condos will range from 700 square feet to 3,000 square feet, hotel condos from 570 square feet to 2,000 square feet, and hotel rooms from 570 square feet to 1,000 square feet. Interior designs are not done and Teufel and Flores are not yet releasing condo prices.
 


Back
Top