I believe the graded dirt strip between the parking lot and the power plant will eventually be paved and become Dorsey Ln. to connect University Dr. to Rio Salado Pkwy.

Correct. If I’m not mistaken, Dorsey should transition to Pier Drive at Rio Solado leading into The Pier and that portion of the waterfront.
 
It looked like it was angling to the right to purposefully not connect the two in the design documents for the lowrise Novus parcel by the power plant.
 
yWWypLb.jpg


I think this picture helps visualize it.
 
Thanks, yeah... that Pier Dr/Clubview/Dorsey/Rio intersection is going to be a weird one. Good that they're being thoughtful about the circulation, I hadn't seen this and wasn't sure where everything was going.
 
I really would love to move into there, but I don’t know if I can trust the damn place with the 3 years it took to build the parking garage, odd stalls, talks of a weird owner & now this LOL. Some sketchy stuff happening with this building lol
 
The worker fell from the 8th floor to the 7th floor apparently unrelated to a structural issue. Probably took a bad step without the harness connected and fell through an opening in the floor.
 
I really would love to move into there, but I don’t know if I can trust the damn place with the 3 years it took to build the parking garage, odd stalls, talks of a weird owner & now this LOL. Some sketchy stuff happening with this building lol

Haha! I agree! I would be nervous as well! The construction has not been normal. Five construction workers built the foundation in 5 years. No way I’m going inside that building. Lol!!!!
 
Haha! I agree! I would be nervous as well! The construction has not been normal. Five construction workers built the foundation in 5 years. No way I’m going inside that building. Lol!!!!

This building is either going to be the best constructed or the worst constructed building ever lol
 