Wait, Dorsey's not that linear parking lot is it?
I believe the graded dirt strip between the parking lot and the power plant will eventually be paved and become Dorsey Ln. to connect University Dr. to Rio Salado Pkwy.
I really would love to move into there, but I don’t know if I can trust the damn place with the 3 years it took to build the parking garage, odd stalls, talks of a weird owner & now this LOL. Some sketchy stuff happening with this building lol
Haha! I agree! I would be nervous as well! The construction has not been normal. Five construction workers built the foundation in 5 years. No way I’m going inside that building. Lol!!!!