Paris Transit Thread


:previous:
The project includes a few office + retail buildings along the station, on either side of it. Pretty sure 130 M€ is the cost of the whole thing, I just checked on the French forum about it.

Here's a video showing what the station and its close surroundings would look like:
http://www.dailymotion.com/video/xoa1ci_video-de-la-future-gare-rosa-parks_news

I think it's linked to the redevelopments underway along boulevard Macdonald. The station will serve a district that includes a ZAC (zone d'aménagement concertée, something like collaborative planning area or concerted development area) they call Claude Bernard, that's developed at this moment.

So 3 lines to meet at Rosa Parks:
  • RER E (heavy commuter line)
  • T3 light rail currently extended. See post #357, Rosa Parks is still called Évangile on that sketch
  • T8 light rail. Can't see it yet on its sketch, but there's already a T8 extension planned to take it up to Évangile/Rosa Parks
 
As said Mousquet the former industrial district in the northern side of the station is under in redevelopment.
Million m² of housing, office, retail space are in construction or planned will be added near this station.

The new worker, inhabitants combined with the T3b and T8 will create a busy station with 68,000 passengers per day.
ZACClaudeBernMcDonalds.jpg

Rosa Park station is the big red dot in this picture)

A bigger render of Rosa park station on line E.
gare-rosa-parks.jpg
 
RER_17.gif
RER-c_17.gif
RER-d_17.gif
Juvisy
A major station of the southeastern outer suburb.

DSC47906a.jpg

Line C platforms
DSC47914a.jpg


DSC47917a.jpg


DSC47920a.jpg

Line D platforms
DSC47921a.jpg


DSC47938a.jpg


DSC47933a.jpg


DSC47949a.jpg

Z2N of the line D to Central Paris
DSC47960a.jpg

There is also some Z 5300 on the RER D doing some suburb to outer suburbs service.
These trains are about to be withdrawn.
DSC47965a.jpg
 
The 10 busiest metro stations by entry in 2011
Note this is only the entrances coming from outside the RATP railway network.
A transfer between the RER and the metro at Chatelet-Les-Halles is not included in the number of Chatelet while a transfer between the RER and the metro at Bibliothèque François Mitterrand is included in the number of Bibliothèque François Mitterrand.
So don't be surprised if some station have a lower number of entrance than expected.

  1. Gare du Nord: 48,146,629
  2. Saint-Lazare: 46,790,941
  3. Gare de Lyon: 34,523,049
  4. Montparnasse-Bienvenue: 31,152,275
  5. Gare de l'Est: 19,671,320
  6. République: 17,095,806
  7. Bibliothèque François Mitterrand: 15,826,727
  8. Châtelet: 14,440,964
  9. La Défense: 13,853,216
  10. Les Halles: 13,113,834

The last one
Eglise d'Auteuil: 178,152
 
T_17.gif
T1_17.gif
Opening of the section Les Courtilles - Gare de Saint Denis
While the extension opened to passengers this thursday, the official inauguration will be this week end.

4.9km and 10 new stations
The T1 is now 17 km long with 36 stations
T1plan.jpg


Unlike the other parisians tram lines, there are two short sections where the T1 shares tracks with the car traffic.
One in the Ile-Saint-Denis, and the second in the town center of Gennevilliers.
DSC49990a.jpg


DSC49996a.jpg


DSC49998a.jpg


DSC50003a.jpg


DSC50011a.jpg


DSC50015a.jpg


DSC50022a.jpg


DSC50029a.jpg


DSC50036a.jpg
 
Last edited:
Paris opens light rail line T1 extension
Written by Keith Barrow, Friday, November 16, 2012

THE 4.9km western extension of Paris light rail line T1 from Saint Denis to Asnières Gennevilliers Les Courtilles opened on November 15.

Construction began in 2008 on the €150m extension which has 10 stations, including interchanges with RER Line D at Saint Denis, RER Line C at Gennevilliers, and Metro Line 13 at Les Courtilles.
The journey time between Saint Denis and Les Courtilles is 17 minutes, and services operate at minimum intervals of four minutes during peak periods.
A further 8km eastern extension is planned, which will take trams from Noisy-le-Sec to Romainville and Montreuil, terminating at an interchange with RER Line A at Val-de-Fontenay. Paris Transport Authority (RATP) will procure 15 additional low-floor LRVs to provide the additional capacity required for the €400m extension, which is due to be completed in 2016.
http://www.railjournal.com/index.php/light-rail/paris-light-rail-line-t1-goes-west.html#.UKgbPoezJ8E
 
T_17.gif
T2_17.gif
Extension of T2 opening (Pont de Bezon - La Défense
4.2km and 7 new station.
The T2 is now 17.9 km long with 24 stations.
T2plan.jpg


Pont de Bezons
DSC50217a.jpg


DSC50226a.jpg


DSC50224a.jpg


DSC50231a.jpg

Victor Basch
DSC50233a.jpg


DSC50238a.jpg


DSC50248a.jpg

Jacqueline Auriol
DSC50244a.jpg
 
T_17.gif
T2_17.gif
La Défense
With the opening of the extension, there been some changes at this station.
This station is not anymore the terminal stop and traffic will grow (La Defense is already the busiest tram stop), with its previous configuration it could not cope with this increase.

Even if this station is still made of a single island platform, the platform was lengthened and trams don't stop anymore at the same position on both sides of the platform.
Tram bound to Pont de Bezons stop on the north side of the platform and tram bound to Porte de Versailles stop on south side.

Here the south side of the platform, the new extended part of the station.
DSC50361a.jpg


DSC50363a.jpg

The northern side
DSC50372a.jpg

New exits have been built
DSC50375a.jpg


DSC50377a.jpg
 
M_17.gif
M01_17.gif
New signage
Old version: all metro/RER and tram lines are shown
DSC50620a.jpg


New version: only the lines with transfer to the line 1 are shown, this includes the non-RER suburban train.
DSC50617a.jpg
 
Ridership in 2011
  • Metro: 1,524 million (+1.2%)

  • SNCF RER and suburban train: 698 million (+2.6%)
  • RATP RER: 469 million (+2.6%)
  • Total suburban rail network: 1,167 million (+2.6%)

  • Tram: 114 million (+5.5%)
  • RATP bus: 1,001 million (+2.6%)
  • OPTILES and TRA bus: 331 million (+3.4%)
  • Total bus and tram network: 1,446 million (+3%)


Note 2011 was the second busiest year for Paris metro.
This is five busiest years of Paris metro.
1946: 1,598 million
2011: 1,524 million
1945: 1,508 million
2010: 1,506 million
2009: 1,479 million

During the post was period the metro ridership was high because of the lack of other transports.
Gas was still lacking, so most of bus or car could not run and Paris had abolished its tram network in the 1930's, well before many other cities.
 
I just found this thread yesterday and it's been really interesting to get a better understanding of the developments of the system over the past 5 years or so, as I am currently in the middle of living in Paris for a year.

Here is the new signage on Line 12;
20121204153724.jpg


From today (5th) to the 9th, Porte de la Chapelle to Jules Joffrin on Line 12 is closed in final preparations for the opening of the first stage of the Line 12 extension in a couple of weeks.
 
The last week end the extension og the T3 opened
T_17.gif
16px-Logo_Paris_tram_ligne3a.svg.png
16px-Logo_Paris_tram_ligne3b.svg.png

The extension added 14.5 km, 26 stations and a new line.
The T3 was divided in two lines, T3a for the southern part and T3b for the northeastern part.
Both lines meet at Porte de Vincennes

T3a is 12.4 km long with 25 stations
T3aplan.jpg

T3b is 9.4 km with 18 stations
T3bplan.jpg


Arriving at Maryse Bastié
DSC50757a.jpg

Alexandra David-Néel
DSC50759a.jpg

Porte de Vincennes terminal stop of the T3a and the T3b, T3a platforms
DSC50761a.jpg

The two lines platforms are in the both side of the Avenue.
DSC50763a.jpg


DSC50768a.jpg

Porte de Vincennes T3b platforms
DSC50770a.jpg

Delphine Sering
DSC50818a.jpg

Porte de la Villette
DSC50845a.jpg


DSC50851a.jpg


DSC50856a.jpg

Canal Saint-Denis
DSC50865a.jpg
 
Last edited:
Paris tram network towards 2020.

Paristram2020.jpg

Note that the T3a to Porte de Vincennes and T3b between Porte de Vincennes and Porte de la Chapelle are open as say my previous post.
 
Antony - Clamart tram
STIF (Paris regional transportation autority) Board approved the first phase of studies
The line would be 8.2km long with 14 stations

Early 2013: presentation of the project and public meetings
2013 - 2014: Further studies
2015: Public inquiry
2016 - 2017: In-depth studies
2017: Start of construction
2020 - 2021: Opening

No number yet but it is likely to be called T10

STIF_Carte-L2-neutre.jpg
 
Paris RER Line E extension approved
Written by David Briginshaw, Friday, February 01, 2013

THE prefects of Paris and three Ile-de-France local authorities have granted final approval, known as the declaration of public utility in France, for the extension of RER Line E from Haussmann-St Lazare 47km west to Mantes-la-Jolie.

Final design and cost optimisation is already underway and should be completed in the autumn allowing construction to start next year. The extension is due to open in 2020.
The €2bn project entails constructing an 8km tunnel from St Lazare to La Défense and upgrading an existing line between there, Poissy and Mantes-la-Jolie. The extension will cut journey times between western suburbs and La Défense, an important commercial centre on the west side of Paris, by up to 17 minutes. It will also provide existing Line E passengers with direct access to La Défense, and will relieve congestion by between 10 and 15% on the Auber – La Défense section of RER Line A, which Line E will parallel, and part of RER Line B.

The extension will connect with RER lines A and C, metro Line 1, tram Line T2, several commuter lines, and the future Orange, Red and Green lines of the orbital Grand Paris Express network. When the extension opens Line E is expected to carry 89,000 passenger per hour in the morning peak and 620,000 passengers a day.
http://www.railjournal.com/index.php/commuter-rail/paris-rer-line-e-railway-extension-approved.html?channel=641
 