Corvinelli Homes has a map of their next few phases of Solidex Place/Station in Russell, which is ready to boom as City of Ottawa water is coming in February and they are building more wastewater infrastructure
Solidex Place/Station^ :shrug: Anyone know where they got that name? I guess "station" comes from the fact that it is near the nature trail that used to be the New York Central Railway. But Solidex?
It's originally called Solidex Place but that map says Solidex Station, so maybe they are changing it... a lot of the street names are train related. Solidex is from "Solidex Holdings" which I think is the construction company started by the developer's father http://www.canada.com/ottawacitizen/news/homes/story.html?id=346ab7c5-2357-4757-83be-e9d0d8ec1cda
revious:
In other words, both developers and courts are tired of the City fighting legal battles against projects where there is no legal ground for a challenge.
If only something like awarding costs against the City would help it learn...
The outcome of this case is not exactly good for municipalities anywhere in the province. This case, if you recall, while it started off as a pissing match between the City and Minto, was actually about whether the OMB is required to "have regard to" decisions of Council in arriving at its decisions, something that the Provincial cabinet had changed a few regulations a few years' back to ensure. What this case has shown is that that was all for naught, if it was indeed for real at all.
What I had expected, given the clear lack of regard the OMB had for Council's decision and due to the provincial regulation change, was that the Court would punt the case back to the OMB with instructions to the OMB to rehear the case in accordance with the provincial regulations. There I expected the OMB to come to the same decision in the end, but only after it sorted out a bunch of conflicting Council decisions. The City would have won on the principle that the OMB has to pay attention to Council while Minto would have won on the grounds that Council was nuts. Instead what we've got is that every single growth-limiting decision by any municipal council anywhere in the province is pretty much worthless as far as the OMB is concerned.
And we still see Minto pushing its luck after all this - it is crystal-clear that costs at an OMB hearing cannot be awarded except under the most unusual of circumstances, and simply defending a provincially-approved secondary plan is not one of those circumstances.
First, Bill 51 requires that the OMB shall “have regard to the decision of the municipal council.” OMB hearings are almost always a question of whether the municipal decision will stand or not, so the current practice has been for the OMB to have regard to the municipal decision even if it decides to set it aside. This particular amendment therefore changes nothing. But the irony of the words “have regard to” should not be missed. It used to be that the OMB was required to “have regard for” provincial policy statements but that was considered so weak that the government has since required that decisions “be consistent with” provincial policy standards. Bill 51 doesn’t give the local decision the status of provincial policy, just a “have regard to” status. The government touts this as a major recognition of local councils, but it is nothing of the sort.
Offering in its initial phase a limited collection of only 117 executive townhomes, TrailsEdge presents to you an attractive setting close to both urban amenities and natural attractions.
Located on the southwestern edge of Orleans, just east of Minto's Chapel Trail (where Page Road and Renaud Road intersect), TrailsEdge offers you four different models of Minto's sought-after executive townhomes.
Owning an exceptionally well-designed Minto townhome in TrailsEdge will give you an inspiring place to enjoy life.
Trails Edge is an “all ENERGY STAR” community built in Ottawa by Minto Communities. It is adjacent to a future community of residential, schools, parks and retail. With good access to a future rapid-bus transit system (and future light rail), nature trails of Mud Creek and close to Mer Bleue and the NCC lands, as well as access to some commercial areas – it will be part a future diverse community of people and businesses.
Natural resource conservation is a priority for Minto – including energy, water and reduction in construction materials and waste. With the increasing cost of energy and awareness of the impacts of energy production on our natural environment and climate – the demand for energy efficient solutions in all industries has never been stronger.
TrailsEdge is an open community with public access to sidewalks and parks. With a compact footprint of 19 DU/Acre, this helps make efficient use land inside the urban boundary and supports efficient use of transit.
Some other features:
- landscape design to eliminate traditional sod (using lower-water use and non-invasive sod) – called RTF, ‘rhizome turf fescue grass’
- for reduced water use: low-flow shower heads, toilets, and lavatory faucets. Reduced water use will also be achieved through lower water use landscaping design.
- low VOC paint and Green label Plus Carpets as standard – this will enhance indoor air quality.
- Design the community for pedestrians
o Build bike / pedestrian connections to the future bus transitway, along the creek system and connecting to the future school and park sites.
o Strong pedestrian connections east-west to future to future development areas
o Public active and passive parks and open spaces are focused centrally to the communities and passive park areas are provided along the creeks. Storm water management ponds will be adjacent to open spaces to provide more public open space – these parks will be a feature of the community.
o Walkable access to schools, parks and future retail
- Construction waste will be separated on site for recycling and a diversion rate exceeding 75% of construction waste from landfill will be established
- Materials with a recycled content and/or which are extracted and manufactured locally are preferred.
Mattamy Half Moon Bay Phase 2...
http://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__7XWO9P
Mattamy seems to be going downhill in terms of subdivision design. Their previous plans have featured rear-lane townhomes, single-loaded streets, lots of walkway blocks, and have generally been very attractive.
This plan is full of rear-lotting along arterials, something the city has been trying to get away from. They even have a long stretch (over 220m) of rear lotting, without even a walkway block, along New Greenbank Rd, which is supposed to be a future transit corridor. How those people will actually to get said transit, I don't know...
I'm hoping this gets significantly changed.
I can understand the rationale for not having any houses or driveways directly facing Greenbank (it would also be the edge of the community)

It's the edge as currently planned, but Minto owns a bunch of land there (some of which was recommended to be added in the OP review), so it likely won't be like that forever.. I believe the Greenbank plans are too advanced to shift that to the transit corridor... The schools/commercial uses are going to be concentrated near the new Greenbank, while the current Greenbank is going to have things like single loaded roads and parks.
![]()
How many lanes is the existing Greenbank planned for? It appears to be marked as an arterial, which usually suggests ROW for at least 4 lanes - they could narrow it to 2 lanes in the ultimate plan.
The ongoing EA of Greenbank Road has identified a “preferred” alternative location to the west of existing Greenbank Road, including a new location of a bridge over the Jock River. This new Greenbank Road corridor should be protected for a four-lane arterial road cross-section as far south as Cambrian Road. Combined with the rapid transit corridor requirement, the total recommended right-of-way is 41.5m.
In order to accommodate the potential of an urban boundary expansion beyond that currently rationalized in the Barrhaven South CDP, the right-of-way of new Greenbank Road south of Cambrian Road, as a potential future arterial, should be protected to accommodate four arterial lanes and two rapid transit lanes, all in a 41.5m right-of-way.
South of Cambrian Road, existing Greenbank Road should be protected for a four-lane arterial cross-section to Barnsdale Road with a right-of-way of 37.5m.Ultimately, a right-of-way somewhere between 32.0m and 37.5m for a four-lane undivided roadway, is the likely scenario, as the arterial function of this roadway is expected to change in the long-term.
They could move the "community core" into the grid on the existing Greenbank with transit stations at Cambrian, Barnsdale and halfway between them.
It's the edge as currently planned, but Minto owns a bunch of land there (some of which was recommended to be added in the OP review), so it likely won't be like that forever.. I believe the Greenbank/Barrhaven South plans are too advanced to shift that to the transit corridor... The schools/commercial uses are going to be concentrated near the new Greenbank, while the current Greenbank is going to have things like single loaded roads and parks.