[Moncton] Riverview Developments


The framing for the first floor of this building in Riverview is about half done. They have the mini tower crane back up to hoist things in place. It’s mostly wooden construction with a little bit of steel mixed in.
dobson-render-1.jpg
 
Not sure if this was discussed here before but got this from CCD Canada ;


MEZZA LEBANESE RESTAURANT GROUP, RIVERVIEW

CCD Ref. Number : NB164343-21-10

Stage : 3-Planning or drawing

Published : October 18, 2021

Starting Date (estimated) : Not available

Size : Minor ($428,000)

Work type : New construction

Sector : Private

Category : 2-Commercial

Subcategories : 2G-Catering

Disciplines : ARCH, ELEC, EQUI, HVAC, MEC-B, STRUC, OTHER*

Location :

RIVERVIEW (NB)
(Moncton - Richibucto)

Description :
NEW RESTAURANT -
Located in Riverview, this project (Mezza Lebanese Restaurant Group*) estimated at $428 000 is in the planning stage. Works concern the construction of a commercial building for a restaurant.

- Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
 
Not sure if this was discussed here before but got this from CCD Canada ;


MEZZA LEBANESE RESTAURANT GROUP, RIVERVIEW

CCD Ref. Number : NB164343-21-10

Stage : 3-Planning or drawing

Published : October 18, 2021

Starting Date (estimated) : Not available

Size : Minor ($428,000)

Work type : New construction

Sector : Private

Category : 2-Commercial

Subcategories : 2G-Catering

Disciplines : ARCH, ELEC, EQUI, HVAC, MEC-B, STRUC, OTHER*

Location :

RIVERVIEW (NB)
(Moncton - Richibucto)

Description :
NEW RESTAURANT -
Located in Riverview, this project (Mezza Lebanese Restaurant Group*) estimated at $428 000 is in the planning stage. Works concern the construction of a commercial building for a restaurant.

- Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS

No, it wasn't. This will be the fourth Mezza restaurant in metro Moncton. Very aggressive expansion strategy! :eek:
 
I'm not too sure about this rapid expansion by Mezza. It seems a tad overly aggressive to me. The thing about Riverview though, is that there isn't a lot of competition for them. And I do like their menu. I wish them luck.
 
I'm not too sure about this rapid expansion by Mezza. It seems a tad overly aggressive to me. The thing about Riverview though, is that there isn't a lot of competition for them. And I do like their menu. I wish them luck.
True story: we've driven all the way to Truro solely to go eat at Mezza and come straight home. We've also chosen to fly out of YHZ instead of YQM just so we have an excuse to eat there haha

10 years ago I would have thought 4 locations in Moncton would have been a huge stretch, but we're a much different city now with tons of people from larger cities who are shocked at how hard it is to get good shawarma or falafel in this town.
 
As expected, MoeMar Homes is hustling along with their 2nd apartment building on Runneymeade Road. They already have the first floor built with several of the windows installed. The 2nd floor is mostly framed in with a crew working to finish it and a crew working on top getting ready for the 3rd floor. This is a 4 floor 71 unit building, beside their recently completed 55 unit building.
 
Say it ain't so. I'm seeing construction workers at The old 'Green Gables' convenience store at the corner of Trites Rd. & Whitepine Rd.

Anyone hearing anything?

I saw them working at the back of the building today. It didn't look like anything major though. It certainly is a prime location, but the building looks really run down. No idea what they might be up to.
 
You can finally see some progress on The Tides building on Coverdale Rd. They have been working for several weeks on things not visible from the road. But driving by yesterday, I noticed some cinder block construction on the next level. I'm still intrigued as to how much progress they'll be able to make before winter. Will we see a crane soon, or not until the spring?

Major concrete pouring today, with several trucks delivering. And the elevator shaft is starting to climb.

When it's all done it will be a nice addition in a prime location on Coverdale Road, replacing an overgrown vacant lot.
 
There was an approval way back in 2015 for a development on Dickey that included several buildings, but it never got started. A few months ago it resurfaced with a few changes. If I recall correctly it was approved once again. It looks like this time it just might go ahead.

I don’t recall the building being tall enough to warrant a full tower crane. This is interesting.
 
Obviously something is going on if there is tower crane parts lying around so that’s good.

A project doesn't necessarily have to be tall for a tower crane to be used - look at the new tower crane off Harrisville.

Meanwhile, I see a new mini-tower crane (collapsed and not yet erected) on site at The Tides on Coverdale. I'm beginning to think that Thrive has no intention to use a full tower crane on this project. I believe The Tides is five storeys, so they might be able to get by only with a mini tower crane on this site if they are comfortable moving it about the construction site for use as needed.
 
Last edited:
Obviously something is going on if there is tower crane parts lying around so that’s good.

I decided to take a wander over there to see for myself.

There is indeed the base for a tower crane in the ground on Dickey Blvd in Dobson Landing. :eek:

This is indeed a surprise as I am pretty sure the building being built there is no more than four storeys tall (unless there has been a change).

Here is the website for the development:
https://www.dobsonlanding.com/#section-1

49724077451_1594df3724_b.jpg


The (future) crane is located on the map labelled "lot D"

[EDIT] I actually just found a rendering for this building on the interweb (new, I've never seen this before). This image was located on the website of an engineering firm based out of Halifax. A few judicious search terms and parameters allowed Google Search to take me right there. :)

The%20Jeffrey.png


The building will be up to five storeys tall (in places) and will be called "The Jeffrey"

Located in Riverview, New Brunswick Dobson Landing is a multi-building development. The Jeffrey includes 48 residential units, underground parking, social room, fitness room, and rooftop terrace.
 
Last edited:
It's great to finally see the Dobson Landing project progressing, as there has been a long pause in this development. I have to say that I didn't expect to see a tower crane at this location!
 
Lots of infrastructure work going on by Moemar on Oakfield Drive towards Runnymead. Looks like they are digging there way to China. I can't find anything on the town website. I guess the town doesn't post anything about subdivision planning.
 
Lots of infrastructure work going on by Moemar on Oakfield Drive towards Runnymead. Looks like they are digging there way to China. I can't find anything on the town website. I guess the town doesn't post anything about subdivision planning.

About 2 years ago, someone with MoeMar told me that they had plans for 8 apartment buildings in this area. That was before they started the two that they're building now. So the ground work they're doing probably has something to do with more multi residential projects.

They have an experienced crew and they don't waste any time getting things done. It's impressive how fast they've been able to put the first 2 buildings up. 126 units in total.
 
Lots of infrastructure work going on by Moemar on Oakfield Drive towards Runnymead. Looks like they are digging there way to China. I can't find anything on the town website. I guess the town doesn't post anything about subdivision planning.

If you pull up the active transportation map you can see what the full build out of the subdivision in that area is going to look like.

https://www.townofriverview.ca/site...sport_final_plan_with_appendix.compressed.pdf
 