josh_cat_eyes
Active member
The framing for the first floor of this building in Riverview is about half done. They have the mini tower crane back up to hoist things in place. It’s mostly wooden construction with a little bit of steel mixed in.
Not sure if this was discussed here before but got this from CCD Canada ;
MEZZA LEBANESE RESTAURANT GROUP, RIVERVIEW
CCD Ref. Number : NB164343-21-10
Stage : 3-Planning or drawing
Published : October 18, 2021
Starting Date (estimated) : Not available
Size : Minor ($428,000)
Work type : New construction
Sector : Private
Category : 2-Commercial
Subcategories : 2G-Catering
Disciplines : ARCH, ELEC, EQUI, HVAC, MEC-B, STRUC, OTHER*
Location :
RIVERVIEW (NB)
(Moncton - Richibucto)
Description :
NEW RESTAURANT -
Located in Riverview, this project (Mezza Lebanese Restaurant Group*) estimated at $428 000 is in the planning stage. Works concern the construction of a commercial building for a restaurant.
- Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
True story: we've driven all the way to Truro solely to go eat at Mezza and come straight home. We've also chosen to fly out of YHZ instead of YQM just so we have an excuse to eat there hahaI'm not too sure about this rapid expansion by Mezza. It seems a tad overly aggressive to me. The thing about Riverview though, is that there isn't a lot of competition for them. And I do like their menu. I wish them luck.
Say it ain't so. I'm seeing construction workers at The old 'Green Gables' convenience store at the corner of Trites Rd. & Whitepine Rd.
Anyone hearing anything?
You can finally see some progress on The Tides building on Coverdale Rd. They have been working for several weeks on things not visible from the road. But driving by yesterday, I noticed some cinder block construction on the next level. I'm still intrigued as to how much progress they'll be able to make before winter. Will we see a crane soon, or not until the spring?
There was an approval way back in 2015 for a development on Dickey that included several buildings, but it never got started. A few months ago it resurfaced with a few changes. If I recall correctly it was approved once again. It looks like this time it just might go ahead.
I don’t recall the building being tall enough to warrant a full tower crane. This is interesting.
I think you're right, I may have been mistaken.
Obviously something is going on if there is tower crane parts lying around so that’s good.
Obviously something is going on if there is tower crane parts lying around so that’s good.
Located in Riverview, New Brunswick Dobson Landing is a multi-building development. The Jeffrey includes 48 residential units, underground parking, social room, fitness room, and rooftop terrace.
Lots of infrastructure work going on by Moemar on Oakfield Drive towards Runnymead. Looks like they are digging there way to China. I can't find anything on the town website. I guess the town doesn't post anything about subdivision planning.
Lots of infrastructure work going on by Moemar on Oakfield Drive towards Runnymead. Looks like they are digging there way to China. I can't find anything on the town website. I guess the town doesn't post anything about subdivision planning.