Site preparation is underway for the 32 unit apartment building across from the Riverview mall. The town will be doing installation of water and sanitary service next week on Coverdale Rd. where this building will be.
Holy Whale Brewery will be moving its operation indoors. They will be the anchor tenant in the Chocolat River Station from Nov. 2020 to March 31th, 2021.
To note, Cordova Realty takes possession of the building the following day.
revious:
That's this building:
![]()
So, they are going to call it The Tides. That's good to know. Sorta goes along with the other project they have planned for Coverdale Road (The Current).
I'm excited to hear they plan to begin construction later this summer! :tup:
Holy Whale Brewery will be moving its operation indoors. They will be the anchor tenant in the Chocolat River Station from Nov. 2020 to March 31th, 2021.
To note, Cordova Realty takes possession of the building the following day.
Finally starting something with this. Just drove by and Phillips Bros. pickups are on site dropping off equipment.
I drove by as well, and at present, there is one excavator on site. No earth has been moved yet, but there certainly appears to be something afoot.
Given the lateness of the season, I suspect initial site prep this fall, with construction in earnest beginning next spring. :tup:
The railings have been installed for the pedestrian walkway and lookouts.
![]()
Looks like a good match for the other bridge. Let's hope they used a different supplier for the paint.
Except for the pavement on the roadway itself, the whole structure is finished. Once they close the causeway, they will be able to build the approaches to it. I suspect that they will be able to get a considerable amount done on the Moncton side before they have to close the causeway.
The vast amount of the work left to do is essentially earth moving - the creation of the new river channel, the bolstering of the new riverbank, and the creation of the the bridge approaches. The amount of work done so far is impressive, but you ain't seen nuttin' yet! Next year will be extremely active. I believe they intend to have the "causeway" closed for three months during final construction.
Yeah one of the big challenges will be filling in the existing river channel and removing the dam gates once the new channel is finished. Do you know if they plan on continuing to do earth moving throughout the winter? If so, I would love to see them be ready to shut the causeway down in like April, May & June rather than June, July and August.
The vast amount of the work left to do is essentially earth moving - the creation of the new river channel, the bolstering of the new riverbank, and the creation of the the bridge approaches. The amount of work done so far is impressive, but you ain't seen nuttin' yet! Next year will be extremely active. I believe they intend to have the "causeway" closed for three months during final construction.
At first I thought something changed after you were saying 3 months, but it is 6, not 3.
Speak of the devil...…….
More proof that CBC and CTV and Brunswick reporters keep an eye on these boards for topics to talk about.![]()
Sounds/looks like an impressive amount of work happening. Annoying if you need to use that area for your commute but hopefully short term pain for long term gain.![]()