CodiacCanuck
New member
Does anyone know when the Lion Ken Gabbey Community Pool on Buckingham will be opening. The Town website still says that they "anticipate" opening in July 2020... and here we are in August.
Does anyone know when the Lion Ken Gabbey Community Pool on Buckingham will be opening. The Town website still says that they "anticipate" opening in July 2020... and here we are in August.
They probably haven’t opened it because of covid-19. It’s finished but it likely won’t open this summer.
Just announced pool opening August 7th!
From the agenda for the August Riverview PAC meeting:
Chad Blakney on behalf of 717035 NB Inc, 727 Coverdale Road (PID 05038831), Conditional use application to: 1) permit a 32 unit multi-unit building in the Suburban Commercial zone, and 2) to permit a use greater than 1500 square metres within the Suburban Commercial zone (File 20-1095).
No supporting documents as of yet. They will likely show up on the website in the next few days.
This is the lot for sale directly across from the Broadview Power Sports Building at the Riverview Mall, to the west of the former West Side Restaurant which burned last year. Apparently a 32 unit apartment building is planned.


The subject area (south of Gunningsville Boulevard, comprising Dickey Blvd and Tassy Crescent) was re- designated and rezoned in 2015 subject to a conditional zoning agreement (CZA) to permit the development of a mixed-use neighbourhood with a mix of commercial buildings, multi-unit residential buildings, townhouses, and compact single-unit dwelling lots (detached dwellings on lots narrower than the 50 foot wide lots required in the zoning by-law). One of the conditions of that rezoning was that some residential and some commercial development must occur within four years of the registration of the CZA (before January 16, 2019). Though some single-unit dwellings and townhouses were built within this time frame, no commercial development occurred. Therefore, the agreement expired. The developer is now asking for Council to re-adopt the CZA to permit future phases of development.
While the general concept being presented is still in line with what was proposed in 2014, the developer is proposing some changes. In particular, the commercial footprint has been reduced and the number of residential units has increased based on a market assessment. An overall master plan for the development area is included with this report. The number of units is subject to change as the project moves toward the building permit stage, but the area will tentatively include the following:
2015 concept:
- 5 commercial buildings with communal parking
- 35 single-unit dwellings on 40’ wide compact lots
- 64 units in semi-detached and townhouse dwellings
- 156 units across three multi-unit buildings with underground and above ground parking
2020 concept:
- 2 commercial buildings with frontage on Gunningsville Blvd.
- 7 existing + 24 single-unit dwellings on 42’-46’ wide compact lots
- 4 existing + 62 units in semi-detached and townhouse dwellings
- 244 units across three multi-unit buildings (4-5 storeys) with underground and above ground parking
The proposed changes to the conditional zoning agreement for Dobson Landing have just been approved by Riverview town council:
![]()
I haven't checked it out yet but I've heard that they've done a very nice job with the expansion of the Great Canadian dollar store on Pinewood. It does look good from the outside.
Dean Hartman on behalf of Mattie Capital Inc., Dickey Blvd (PID 05111059), Conditional use application to permit a four-story multi-unit dwelling with variances to: 1) reduce landscaping requirements on a portion of the lot to permit an underground garage entrance, and 2) reduce the side yard setback from 6m to 5.1m (File 20-1658).
I noticed that the trees on a piece of land on Pine Glen Rd near Berkley have been cleared. There was a submission to the PAC in March by Lepage Holdings and Property Management Group regarding this property. They intend to build a 2 story 14 unit apartment building on the site. A small but nice little in-filling project on vacant land. I would imagine that construction will start soon.
KENSINGTON UPDATE
There is a very small crew working on this site.
If I'm a betting man, their goal is to finish the foundation only and then put this project to bed for the colder months.
On a side note, the footprint for building #1 takes up a large chunk of the property. I haven't seen the site layout but I'm having a difficult time imagining where building #2 will be placed.
It's hard to tell by driving by the site, but could they be doing both foundations? It does look like it's quite long.
There's been some more land work done on this lot in the last day or two. Looks like they might be getting ready to start construction.
Dean Hartman on behalf of Mattie Capital Inc., Dickey Blvd (PID 05111059), Conditional use application to permit a four-story multi-unit dwelling with variances to: 1) reduce landscaping requirements on a portion of the lot to permit an underground garage entrance, and 2) reduce the side yard setback from 6m to 5.1m (File 20-1658).