CF Pacific Centre Developments


Work platform at 609 Granville came down last night, exposing the 24th floor. I think it the standard sized floor and spandrel look even better than the larger oversized floor and spandrel above, but I am a bit biased.
 
Pics by me just now.
Starting to get a sense of the overall look.
The "between floors" spandrel with the fritt definitely give a softer look to the striping than the old cladding.
Not sure if I like the opaque panel on the corner
(it doesn't have the fritt of the spandrel, so just appears as a border, rather than wrapping around the corner (which the chamfer/bevel favours),
but it's not a substantive border (material-wise like on Royal Tower or the Bentalls)
- conceivably it could have been built out with a 3D panel to be more substantive)

9mGSvEd.jpg


The new cladding will sit in stark contrast to the elevator core of the Four Seasons Hotel next door (until it is reclad(?))

d9lAsMv.jpg
 
Last edited:
the Boulangerie is a company that they bought out a few years ago. It was a local San Francisco based bakery that had a number of locations in the bay area. So Starbucks bought them out, the guy who sold seemed to believe that the sale would help him grow his brand and bakery across the states instead starbucks just shut his stores down or converted them and started stocking boulangerie products in their stores, the sale included all the bakery recipes. Kind dirty tactic but thats what they do.

Well he sold for $100 million cash so do you feel that sorry for him? And it's not as if he totally got screwed over:

He was able to buy back some of his old locations and use the La Boulangerie name, as well as buy back a San Francisco factory Starbucks (Nasdaq: SBUX) had used with La Boulange, which is allowing him to scale up his production, Rigo said.

https://www.bizjournals.com/seattle/news/2017/05/25/la-boulangerie-baker-with-starbucks-costco.html
 
Ah, the new cladding is looking alright. Not stellar, but alright. It's definitely going to change the look and certainly brighten up the place. It looks better darker IMO, but I'm sure it will turn out sleek. I dig the light feature and the gradient on the striping.
 
Pics by me just now.
Starting to get a sense of the overall look.
The "between floors" spandrel with the fritt definitely give a softer look to the striping than the old cladding.
Not sure if I like the opaque panel on the corner
(it doesn't have the fritt of the spandrel, so just appears as a border, rather than wrapping around the corner (which the chamfer/bevel favours),
but it's not a substantive border (material-wise like on Royal Tower or the Bentalls)
- conceivably it could have been built out with a 3D panel to be more substantive)

9mGSvEd.jpg


The new cladding will sit in stark contrast to the elevator core of the Four Seasons Hotel next door (until it is reclad(?))

d9lAsMv.jpg

Thanks for the pics. I think it looks good so far. I actually like the treatment on the corner as it accents the building nicely. The beveled corner was imperceptible before anyway. Either way, a nice upgrade to a very tired facade.
 
Ah, the new cladding is looking alright. Not stellar, but alright. It's definitely going to change the look and certainly brighten up the place. It looks better darker IMO, but I'm sure it will turn out sleek. I dig the light feature and the gradient on the striping.

Definitely take a look in person next time you're downtown. OD's photo is taken through another window and from distance so a lot of the detail is lost.

It has a very crisp modern look in person. I was somewhat excited about this reclad before but having seen the second floor revealed I think it is going to exceed my expectations.
 
Just the reflection through dirty glass. Like I said the pic really doesn't capture how crisp the new cladding looks, definitely take a look next time you're downtown.
 
not too much of a fan how clear it is. you can see walls and furniture inside. ive always been a fan of mirrored glass for office towers to hide all that stuff.

but still better then the original, that's for sure.
 
Pic by me tonight.

I think that platform at the top is probably to re-install the Canaccord sign
(assuming the main stage will never have to go back to the top)

RSwYhJO.jpg
 
Preparing to hoist the chiller units to the top of 701 West Georgia St.:

Pics by me today:

Old units and new units:

GuYqbJr.jpg


UwLA2Cd.jpg


uznyd2p.jpg


Missed the actual lift. Here they are in place:

vphB1ed.jpg
 
Last edited:
Four Seasons Vancouver

Four Seasons is vacating its downtown hotel property on January 31, 2020, according to the hotel's GM Martin Sinclair. Curious to see what happens with this real estate -- a tower with retail/restaurant at the base, connected to a downtown mall.
 