DATE: April 17, 2018
ATTENTION: All Office Tenants - Pacific Centre and HSBC Building
WHAT: Temporary Road Closures and Traffic Control
WHY: To accommodate the delivery of new cooling towers for 701 West Georgia
WHEN: Starting at 9:00 p.m. on Friday, April 27 through to 9:00 a.m. on Sunday, April 29, 2018
IMPACT: This work will require the use of a crane, which will result in the following temporary road closures and traffic control measures:
• Eastbound traffic on West Georgia will be diverted to the eastbound curb lane
• Westbound traffic will be closed at Seymour and redirected to Dunsmuir Street
• All bus stops in the vicinity will be closed for the duration of the work
• The crosswalk on the east side of Granville at West Georgia will be closed for the duration of the work
• All vehicle and pedestrian traffic will be held temporarily during periods of active lifting only
There will be signage in place and traffic control personnel on site to assist with the temporary closures and traffic control measures while this work is taking place.