The Sunport has received nearly $3.7 million in funds from the federal government to go towards a $10 million project to repave and improve Sunport Boulevard and the Sunport Loop terminal access road. Below are stories by Albuquerque Business First and KOB-TV about the funding award and project, including the timeline for construction.
https://www.bizjournals.com/albuquerque/news/2025/07/16/faa-grants-43m-to-new-mexico-airports.html
https://www.kob.com/new-mexico/abq-sunport-secures-3-6m-to-improve-sunport-boulevard/
https://www.bizjournals.com/albuquerque/news/2025/07/16/faa-grants-43m-to-new-mexico-airports.html
As Albuquerque prepares for increased air traffic during Balloon Fiesta, airport improvements and new flight routes are set to enhance visitors' local experience.
The New Mexico delegation has announced awards totalling $4,384,758 from the Federal Aviation Administration for upgrades at the Albuquerque International Sunport, Artesia Municipal Airport and Socorro Municipal Airport.
The grant awards are for the planning and development of public-use airports and funded through the FAA’s Airport Improvement Program, according to a news release.
The Sunport will receive almost $3.7 million in funding for infrastructure updates, specifically for rehabilitation of 10,500 feet of existing terminal access road to extend its useful life.
“The (New Mexico) Congressional Delegation keeps close track of all these applications, and they advocate for us. I definitely think that they typically have a pretty significant impact in terms of us, securing those awards,” Manny Manriquez, deputy director of aviation, innovation and development, said.
The project funds awarded to the Sunport will contribute to the complete rehabilitation of Sunport Boulevard and the terminal loop, estimated to cost around $10 million, according to Manriquez.
Additional funding comes from diverse revenue streams, including airport rates, concessions, and parking structure revenues.
The project was on the Sunport’s capital improvement projects list for some months now, and required an engineering study, and plans from a designer. Next, the Sunport goes to bid for construction, which will entail milling and overlay, and the removal of some pavement and reinstallation of new asphalt on the traffic lanes on Sunport Boulevard. There will also be an open graded friction course, a specific kind of pavement which provides ebenefits like allowing water to drain and less tire spray, on the segment between the I-25 interchange and the Central Terminal loop.
Construction is expected to happen in the late summer or early fall to avoid winter temperatures. Work will be done at night to help minimize the impact on people who need to access the terminal.
https://www.kob.com/new-mexico/abq-sunport-secures-3-6m-to-improve-sunport-boulevard/
ALBUQUERQUE, N.M. — The Albuquerque International Sunport secured just over $3.6 million in federal funding to improve a key part of Sunport Boulevard.
The Federal Aviation Administration’s Airport Improvement Program awarded $3,656,508 to the Sunport to improve road conditions, safety and long-term durability, specifically in the terminal approach corridor. The money will go toward:
• Milling and overlay of traffic lanes on Sunport Boulevard
• Removal of the existing pavement section
• Installation of new asphalt concrete
• Application of a new open graded friction course on the segment between the I-25 Interchange and Sunport Terminal Loop
The Sunport plans to replace the existing surface and improve vehicle traction and drainage.
“This is a major win for Albuquerque,” Mayor Tim Keller said. “The Sunport is not only a gateway to our city but also a driver of economic growth and connectivity for the entire region. These upgrades to Sunport Boulevard are a smart infrastructure investment that will keep traffic moving safely and efficiently for years to come.”
Aviation Director Richard McCurley credited New Mexico’s congressional delegation with playing a key role in securing the funds.
“Sunport Boulevard is a vital corridor that sees thousands of vehicles each day, connecting travelers to flights, family, and opportunity,” McCurley said. “This project ensures that we continue delivering a safe, smooth, and welcoming experience from the moment visitors arrive.”
Responses for requests for proposals for construction are open until Aug. 19. They expect to begin construction in late-2025 with “minimal disruption to traffic flow.”
According to the Sunport, they serve over 5.4 million passengers annually.