HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Apr 28, 2021, 2:38 AM
We vs us We vs us is offline
Registered User
 
Join Date: Sep 2015
Location: Austin, TX
Posts: 3,601
Arrow Dog's Head: 2,500+ Acre Mixed-Use Development

Here's a really interesting speculative article from the ABJ about Dog's Head -- a piece of land north of ABIA that's mostly ranchland and/or mining interests, and all of it in the Colorado River flood plain.

This article . . . seems pretty thin on the surface, but also seems to be hinting at something big. Tell me if y'all agree . . . .

https://www.bizjournals.com/austin/news/2021/04/27/development-eyed-in-austins-dogs-head.html


Quote:
Thousands of acres a short distance from Tesla Inc.’s under-construction gigafactory are being eyed for new development by some of the area's most influential real estate professionals.

The land — tucked between U.S. Highway 183 and State Highway 130 in far East Austin — faces distinct development challenges due to its history as a sand and gravel mining hub. But its proximity to both downtown and Austin-Bergstrom International Airport offers substantial allure. Tesla’s thunderous arrival in the summer of 2020 only added to the intrigue.

Legal entities have been formed in recent months pointing to an overarching plan for the area. And earlier this month, a bill was filed in the Texas Legislature to create a municipal utility district, a crucial first step to boost infrastructure. It could take years to develop this land, which is about 5 miles from the city center, but pieces are now moving to create the foundation for a potentially large-scale project.

If you’re not familiar with the Dog’s Head, you soon will be.

The name refers to roughly 3,000 acres in the city of Austin's extraterritorial jurisdiction where the Colorado River forms the shape of a dog’s head. Parts of the Dog's Head are just a couple of miles from where Tesla Inc. is building its $1.1 billion electric vehicle plant.

Family-owned ranches span about 2,100 acres of the Dog’s Head and exude untapped development potential. A handful of residences are tucked behind overgrown foliage lining dirt roads, and bright orange and pink surveying markers can be spotted in the greenery. Those survey flags are often a sign of development activity.

It’s also hard to miss the various mining operations that leave the area laden with truck activity. The Dog’s Head is still rather quiet, except for the occasional roar from airplanes that fly to and from the nearby airport.

Multiple sources said Austin-based Endeavor Real Estate Group has been eyeing the area for several years now and has tied up thousands of acres in agreements. Endeavor Managing Principal Andy Pastor, who is in charge of Endeavor’s efforts in the Dog’s Head, would not confirm if the firm intends to acquire land in the area. Pastor said Endeavor is helping mining families “figure out what’s next” in the area, which is nearing the end of its useful life for mining purposes.

“This thing is going to be years,” Pastor said. “First the mining has got to stop, and then the reclamation has got to take place.”

He added: “This thing could be interesting in the future, but not in the near future.”

While Endeavor’s plans in the area remain unclear, the creator of big developments such as Southpark Meadows and The Domain — the latter of which is often called Austin's second downtown — certainly has the pedigree to pull off a significant development on the east side. It has essentially cashed out of The Domain, and over the past decade Endeavor has shown a willingness to work on projects that will take years to come to fruition, such as the Austin American-Statesman tract just south of downtown.

Endeavor has also increasingly tackled other alluring markets, such as Nashville and Denver, with big-city proposals.

Land in the Dog’s Head is also the centerpiece of a bill filed April 19 with the Texas House of Representatives that would create a municipal utility district to govern the reclamation of the land and finance utility infrastructure. That would literally lay the groundwork for big-time development. Sources said the bulk of the Dog’s Head does not have access to city utilities and has long relied on well water and septic tanks.

The murmurs of large land agreements and the recent MUD request — not to mention its prime location — has left many to wonder: What could be happening in the Dog’s Head?

What we know

There were no records filed with Travis County by press time that indicated Endeavor owns any land in the area.

But sources said the real estate group has agreements in place with the families that own the majority of the area. According to records filed with Travis Central Appraisal District, Bailey Management Trust owns nearly 1,100 acres and Fitzpatrick Bar X Ranch LP, plus an entity called Fitzpatrick Arline Bolm Etal, has nearly 1,000 acres.

Many landowners across the Dog’s Head did not respond to requests for comment or declined to comment because of non-disclosure agreements. Officials with the area mining operations also did not return requests for comment.

Jamison Stewart of Texas Realty Partners, who still has marketing signs up in the area, confirmed that a 61-acre tract in the area was sold in November, though he declined to identify the buyer.

There are some clear ties to Endeavor, though. An entity called Dog’s Head Ltd. applied for a trademark for the phrase “Dog’s Head” in August 2020, according to the U.S. Patent and Trademark Office. The application lists the same address as Endeavor’s downtown Austin office. The documents state that Dog's Head Ltd. was created for site selection and development services for residential, retail, restaurant, commercial, civic, sports entertainment and mixed-use projects.

Pastor was also familiar with the recent House bill to organize a municipal utility district, saying the legislation is “just part of the process of trying to position it for the future.”

A MUD functions as an independently governed district meant to offer developers avenues to finance infrastructure needs such as water, sewer, drainage and roads, according to the city of Austin. MUDs can issue bonds, which along with property tax revenue and other fees can reimburse costs incurred by the developer. The districts can only be created by the Texas Legislature or the Texas Commission on Environmental Quality.

House Bill 4650, sponsored by District 51 Rep. Eddie Rodriguez, would create a MUD called the East Central Travis County Conservation and Reclamation District No. 1. According to documents, it would comprise roughly 2,100 acres owned by the Bailey and Fitzpatrick families.

Richard Suttle, a prominent land use attorney with Armbrust & Brown PLLC, is representing the landowners in the request to create the district. He said it “could be a first step in trying to rehabilitate land that’s so close to downtown.”

Suttle declined to comment further on the plans for the area and the players involved. Suttle has served as a land use attorney for Endeavor in the past and was recently involved in the Tesla gigafactory project, according to past Austin Business Journal reporting. He also represents the Robinson family, who own a huge ranch on the north side and sold the land to Apple Inc. for its new campus.

The MUD would ultimately need to be approved by Austin City Council.

The district outlined in HB 4650 would be governed by a five-person board of directors serving staggered four-year terms. The largest landowners within the district would control much of the process of creating an interim board. Another election would be required before imposing any ad valorem taxes or issuing bonds payable from such taxes.

Rodriguez, who sponsored the bill on behalf of area landowners, said there’s a good chance the MUD could pass this session. He said he sponsored the bill because it would be a piece to envisioning the future of far East Austin. As of April 26, the bill was in still in committee.

“A lot of the city is growing in that direction,” Rodriguez said of the Dog’s Head. “This is a good start to getting it — when it’s no longer a mining facility — ready to be used in a way that’s more conducive to a growing city where people are moving to ... and East Austin not being the dumping grounds, or in this case, the mining grounds in east Travis County.”

Andy Linseisen, assistant director of the city’s Development Services Department, said no plans had been filed with the city for massive development in the Dog’s Head by press time.

What it’s going to take to develop the Dog’s Head

Eyeing opportunities in the Dog’s Head on a map is one thing, but actually developing a project in the area — much of it located in flood plains, without city utilities — is another prospect altogether.

While some parts of the Dog’s Head are connected to city utilities, other sections are miles away from water and wastewater lines. Connecting them to a development could require costly easements with neighbors, said Bailey Harrington, a civil engineer at WGI who is not involved with development plans in the area.

Because the Dog’s Head is located in Austin’s extraterritorial jurisdiction, or ETJ, the city of Austin has little motivation to extend new utilities to the area, Harrington said.

Meanwhile, development plans in the area will likely have to contend with floodplain regulations — which could restrict certain types of construction. Plus, there are additional restrictions on residential development because the southern portion of the Dog’s Head lays within an airport overlay.

“Every time I’ve looked at sites in the area for developers, the discussion kind of stops when we talk about how far water and wastewater lines are,” Harrington said. “You’re talking probably five years just to deal with the floodplain stuff by itself.”

Harrington estimated it could ultimately cost “in the billions” to create a substantial development across 2,000 acres in the Dog’s Head. But it isn’t an impossible project for a highly motivated developer.

“It’s going to take somebody with enough land and enough vision and enough capital to actually build this infrastructure,” Harrington said. “It’s a big investment.”

There are also the mining operations to consider, plus the various manmade ponds that were previously mining sites. Reclamation of the Dog’s Head has been pegged as a process that could take around a decade to complete. While that may be true, Tesla also had to reclaim land from previous mining operations before constructing its massive facility. Groundwork began in the summer of 2020, and CEO Elon Musk has said the factory will be operational this year.

The swift Tesla factory construction stands as a stark reminder of how development timelines can be accelerated, given the requisite willpower. The Tesla site had previously been imagined as a massive mixed-use development called Austin Green, with an estimated timeline of up to three decades to fully build out.

Troy Martin of NAI Partners represents several landowners with roughly 25 acres just outside the Dog’s Head, near U.S. 183. He said the development challenges aren’t impossible obstacles.

“The Dog’s Head is filled with untapped potential,” Martin said in a statement. “The zoning regulations and noise from ABIA planes would preclude most residential development but the appropriate kinds of office and industrial would work well. … Resolving the floodplain issue would require substantial amounts of engineers, lawyers, time, and money.”

Once those hurdles are cleared, developers would still have to consider the needs of the city of Austin, which could ultimately annex the MUD. District 2 Councilwoman Vanessa Fuentes wants to ensure robust community benefits are part of any future development of the Dog’s Head. She cited grocery stores, pharmacies and hospitals as key needs for that part of Austin.

“It’s my hope that the city always considers using the annexation process to ensure that marginalized communities have the tools to increase their quality of life,” Fuentes said.

Fuentes added that she was excited about the future of the Dog’s Head, noting that “you need economic activity to draw in the infrastructure” necessary to meet the basic needs of the community.

“For me, it’s an exciting opportunity because it gives us a chance to get in early on the process,” she said. “It’s going to be challenging, but I’m not one that backs away from a challenge.”

Fuentes cited Tesla’s gigafactory project as an example of an inclusive development process that others would do well to follow.

“We’re no longer a small city. We’re the 11th-largest city in the country,” she said. “We have to understand, ‘What does that mean for the future of Austin?’”
Reply With Quote
     
     
  #2  
Old Posted Apr 28, 2021, 2:59 AM
myBrain myBrain is offline
Registered User
 
Join Date: Sep 2016
Posts: 710
Dog


I hope that we make sure to leave green space in our rush to develop everything in this part of town.
Reply With Quote
     
     
  #3  
Old Posted Apr 28, 2021, 3:20 PM
Novacek Novacek is offline
Registered User
 
Join Date: Jan 2013
Posts: 2,581
Quote:
Originally Posted by We vs us View Post
Here's a really interesting speculative article from the ABJ about Dog's Head -- a piece of land north of ABIA that's mostly ranchland and/or mining interests, and all of it in the Colorado River flood plain.

This article . . . seems pretty thin on the surface, but also seems to be hinting at something big. Tell me if y'all agree . . . .

https://www.bizjournals.com/austin/news/2021/04/27/development-eyed-in-austins-dogs-head.html
"The swift Tesla factory construction stands as a stark reminder of how development timelines can be accelerated, given the requisite willpower."

I think it's more a reminder that a factory has different requirements than residential. It's easy to take one industrial use and use it for another.


It makes sense to start the process now, because it indeed will take decades (gigafactory speed nonwithstanding). The flood plain issue will be huge.
Reply With Quote
     
     
  #4  
Old Posted Apr 28, 2021, 4:24 PM
drummer drummer is online now
World Traveler
 
Join Date: Jan 2015
Location: Austin metro area
Posts: 4,800
I saw that article as well. It's certainly geographically convenient, but a lot of work!
Reply With Quote
     
     
  #5  
Old Posted Apr 28, 2021, 4:25 PM
We vs us We vs us is offline
Registered User
 
Join Date: Sep 2015
Location: Austin, TX
Posts: 3,601
Quote:
Originally Posted by Novacek View Post
"The flood plain issue will be huge.
TBH, I'd always thought the flood plain was the main reason that land was so undeveloped. Otherwise, as the article makes clear, it should be excellent -- proximity to DT and the airport, as well as major highways, etc.
Reply With Quote
     
     
  #6  
Old Posted Apr 28, 2021, 9:31 PM
drummer drummer is online now
World Traveler
 
Join Date: Jan 2015
Location: Austin metro area
Posts: 4,800
Found this interactive map re: flood plains: austintexas.gov/floodpro/
Reply With Quote
     
     
  #7  
Old Posted Apr 29, 2021, 4:50 AM
wwmiv wwmiv is offline
Registered User
 
Join Date: Sep 2009
Location: Austin -> San Antonio -> Columbia -> San Antonio -> Chicago -> Austin -> Denver -> Austin
Posts: 5,807
Dog’s Head is perfect area for narrow row house lots with small urban neighborhood commercial centers throughout. It is also a potential easy expansion of light rail right down the middle of it, with a spur off the ABIA line.
__________________
Houston: 2.4m (+3.9%) + MSA suburbs: 5.4m (+12%) + CSA exurbs: 200k (+5%)
Dallas: 1.3m (+2%) / FtW: 1.0m (+10%) + suburbs: 6.4m (9%) + exurbs: 566k (+9%)
San Antonio: 1.5m (+6%) + MSA suburbs: 1.2m (+10%) + CSA exurbs: 82k (+3%)
Austin: 994k (+3%) + MSA suburbs: 1.6m (+18%)
Texas (whole): 31.29m (+7%) / Texas (balance): 8.6m (+3%)
Reply With Quote
     
     
  #8  
Old Posted May 20, 2026, 2:56 PM
eguidry eguidry is offline
Registered User
 
Join Date: Aug 2017
Location: East Austin
Posts: 55
Arrow Dog's Head: 2,500+ Acre Mixed-Use Development

Looks like "Dog's Head" might be getting annexed? On the agenda for the 21st and could definitely be interesting for long term development on the east side.

https://services.austintexas.gov/edims/document.cfm?id=473683
https://communityimpact.com/austin/east-...of-mixed-use-development-in-east-austin/
Reply With Quote
     
     
  #9  
Old Posted May 20, 2026, 3:04 PM
urbancore urbancore is offline
Registered User
 
Join Date: Oct 2014
Location: Zilker
Posts: 1,637
Quote:
Originally Posted by eguidry View Post
Looks like "Dog's Head" might be getting annexed? On the agenda for the 21st and could definitely be interesting for long term development on the east side.

https://services.austintexas.gov/edims/document.cfm?id=473683
https://communityimpact.com/austin/east-...of-mixed-use-development-in-east-austin/
my gut tells me that Endeavor has a "fish on" or a whale, contingent upon it becoming annexed.
Reply With Quote
     
     
  #10  
Old Posted May 20, 2026, 3:27 PM
LiveattheOasis LiveattheOasis is offline
Bollywood Fanatic
 
Join Date: Mar 2006
Location: Zilker
Posts: 317
Quote:
Originally Posted by urbancore View Post
my gut tells me that Endeavor has a "fish on" or a whale, contingent upon it becoming annexed.
"City officials believe the so-called Dog’s Head in Southeast Austin — a massive, mostly undeveloped chunk of land in the city's extraterritorial jurisdiction on the east side — has the potential to generate up to $3.5 billion in new property tax revenue over 30 years.

Austin City Council will vote May 21 to approve a development agreement for the Dog’s Head and annex the 2,614-acre site into city limits. On May 19, council members received a briefing from city staff that detailed the potential economic impact of such decisions. The presentation highlighted the massive property tax revenue potential and the advantages of annexing the huge property into Austin city limits.

The Dog’s Head is so named due to the Colorado River, which bends to creates the shape of a dog's head when viewed high in the sky. It’s mostly populated by family-owned ranches and mining operations, but given that it's between downtown and the Austin airport, it's a diamond in the rough.

Local real estate developer Endeavor Real Estate Group, the group behind huge Austin developments such as The Domain and Southpark Meadows, has long had eyes on developing the Dog’s Head and has spent years acquiring the vast majority of land there.

Austin is at an economic disadvantage because it doesn't have sites of the size and scale of the Dog’s Head, which would help grow the tax base, due to fractionalized land ownership, outdated infrastructure and more, Assistant City Manager Eric Johnson said.

“Dog’s Head is really one of these opportunities that is falling into our laps at a perfect time,” Johnson said. “Annexing will enhance Austin’s economic development competitive advantage, create new revenue sources and lock in a long-term tax base position to attract major development, employers, strengthen Austin’s regional economic leadership and deliver shovel-ready that will make a difference in site selection.”

Because it is located in Austin’s ETJ, the dog’s head provides Austin no property tax revenue at this time, but should it be annexed the city believes the Dog’s Head has the potential to generate $1.5 billion to $3.5 billion. If the City Council approves annexation, it would go into effect June 1, according to the presentation.

Besides the property tax revenue generation, annexing the Dog’s Head gives Austin a competitive advantage in economic development, Johnson said, adding that “many would argue that we’ve been out of the game with economic development for a while, and it’s time for us to get back in it.”

Johnson said having a huge, shovel-ready site like the Dog’s Head within city limits, very near to the airport and a short drive to downtown Austin makes the region arguably “the premier location in the entire MSA, and particularly in the world of site selection. This advantage makes the site a prime candidate for massive mixed-use, employment centers, secondary employment campuses, sports and entertainment to name a few.

It still isn’t clear what Endeavor has planned for the Dog’s Head. The developer has always kept its cards close to its chest and hasn’t revealed its ultimate plans for the region — likely because development is a yearslong endeavor and market conditions will fluctuate. But the Austin City Council voting on the development agreement, annexation and more represents the most meaningful development activity for that land since a 2,100-acre municipal utility district was created there in 2021."
__________________
I can feel it coming back again ...
Reply With Quote
     
     
  #11  
Old Posted May 20, 2026, 7:23 PM
chinchaaa chinchaaa is offline
Registered User
 
Join Date: Nov 2017
Posts: 791
Hope they are designing the area for transit. A train line from Dog’s Head, across the river to the new Bolm development and then through the east side into downtown and then down lake Austin blvd to Walsh landing would be a very utilized line.
Reply With Quote
     
     
  #12  
Old Posted May 20, 2026, 7:28 PM
wwmiv wwmiv is offline
Registered User
 
Join Date: Sep 2009
Location: Austin -> San Antonio -> Columbia -> San Antonio -> Chicago -> Austin -> Denver -> Austin
Posts: 5,807
Quote:
Originally Posted by chinchaaa View Post
Hope they are designing the area for transit. A train line from Dog’s Head, across the river to the new Bolm development and then through the east side into downtown and then down lake Austin blvd to Walsh landing would be a very utilized line.
Particularly if it continues back across the river on the other side to the Tesla campus.
__________________
Houston: 2.4m (+3.9%) + MSA suburbs: 5.4m (+12%) + CSA exurbs: 200k (+5%)
Dallas: 1.3m (+2%) / FtW: 1.0m (+10%) + suburbs: 6.4m (9%) + exurbs: 566k (+9%)
San Antonio: 1.5m (+6%) + MSA suburbs: 1.2m (+10%) + CSA exurbs: 82k (+3%)
Austin: 994k (+3%) + MSA suburbs: 1.6m (+18%)
Texas (whole): 31.29m (+7%) / Texas (balance): 8.6m (+3%)
Reply With Quote
     
     
  #13  
Old Posted May 22, 2026, 1:20 AM
ATX2030 ATX2030 is offline
Registered User
 
Join Date: Nov 2020
Posts: 988
Quote:
Originally Posted by urbancore View Post
my gut tells me that Endeavor has a "fish on" or a whale, contingent upon it becoming annexed.
You were spot on!

Fortune 100 company could be headed to Dog's Head in SE Austin
Developers making headway but opposition has appeared

https://www.bizjournals.com/austin/news/...ariant=cx_undefined&cx_artPos=0#cxrecs_s

Moments before City Council approved annexation of and a development agreement for Southeast Austin's Dog's Head property, a representative of the majority-owner of the land told City Council a Fortune 100 has approached them about establishing a base of operations there.
Reply With Quote
     
     
  #14  
Old Posted May 22, 2026, 1:17 PM
ATX2030 ATX2030 is offline
Registered User
 
Join Date: Nov 2020
Posts: 988
Quote:
Originally Posted by ATX2030 View Post
You were spot on!

Fortune 100 company could be headed to Dog's Head in SE Austin
Developers making headway but opposition has appeared

https://www.bizjournals.com/austin/news/...ariant=cx_undefined&cx_artPos=0#cxrecs_s

Moments before City Council approved annexation of and a development agreement for Southeast Austin's Dog's Head property, a representative of the majority-owner of the land told City Council a Fortune 100 has approached them about establishing a base of operations there.
Will be interesting to see who the Fortune 100 company is. Will be "advanced manufacturing" (not data center or military use).

https://www.50pros.com/fortune500

Mod's this might warrant it's own Dog's Head Development thread.
Reply With Quote
     
     
  #15  
Old Posted May 22, 2026, 2:18 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,804
Being non-military and a Fortune 100 manufacturing company narrows the field quite a bit. There are several pharmaceutical companies on that list. Also, Corning and Nvidia formed a joint venture and announced plans this month to build three fiber optic manufacturing facilities in Texas and North Carolina. Corning doesn't quite make the Fortune 100 list, but Nvidia certainly does.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #16  
Old Posted May 22, 2026, 2:52 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,804
A possible clue: A site plan was approved & released this morning for "Project Toaster" which is for 300+ acres of demo and grading within the Dog's Head area off of Dalton Lane.

https://abc.austintexas.gov/web/permit/p...=13705100&t_selected_propertyrsn=9558126

EDIT: The LLC that owns these ~300 acres traces back to Endeavor. So Project Toaster is part of the overall project.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.

Last edited by The ATX; May 22, 2026 at 3:11 PM.
Reply With Quote
     
     
  #17  
Old Posted May 22, 2026, 3:28 PM
chinchaaa chinchaaa is offline
Registered User
 
Join Date: Nov 2017
Posts: 791
Quote:
Originally Posted by ATX2030 View Post
You were spot on!

Fortune 100 company could be headed to Dog's Head in SE Austin
Developers making headway but opposition has appeared

https://www.bizjournals.com/austin/news/...ariant=cx_undefined&cx_artPos=0#cxrecs_s

Moments before City Council approved annexation of and a development agreement for Southeast Austin's Dog's Head property, a representative of the majority-owner of the land told City Council a Fortune 100 has approached them about establishing a base of operations there.
of course the leeches at save our springs are already suing
Reply With Quote
     
     
  #18  
Old Posted May 22, 2026, 5:14 PM
ATX2030 ATX2030 is offline
Registered User
 
Join Date: Nov 2020
Posts: 988
Quote:
Originally Posted by The ATX View Post
Being non-military and a Fortune 100 manufacturing company narrows the field quite a bit. There are several pharmaceutical companies on that list. Also, Corning and Nvidia formed a joint venture and announced plans this month to build three fiber optic manufacturing facilities in Texas and North Carolina. Corning doesn't quite make the Fortune 100 list, but Nvidia certainly does.
That's a great guess. I don't believe it will be Tesla, Dell or Oracle. Like you said it's probably tech or pharmaceutical. If that holds true, it could be any one of the following from the Fortune 100:

Amazon
Apple
Google
Microsoft
Meta
Nvidia
Verizon
J&J
Merck
Pfizer
Broadcom
AbbiVie
Eli Lilly
Cisco
HP
Intel
Bristol-Myers Squibb
Qualcomm (101)
Abbott Laboratories (103)
Thermo Fisher Scientific (104)
Reply With Quote
     
     
  #19  
Old Posted May 23, 2026, 5:14 PM
ATX2030 ATX2030 is offline
Registered User
 
Join Date: Nov 2020
Posts: 988
City Council approves 2,600-acre 'Dog's Head' development in East Austin

KUT 90.5 | By Andrew Weber
Published May 22, 2026 at 10:03 AM CDT

https://www.kut.org/austin/2026-05-22/austin-tx-city-council-dogs-head-development

Austin City Council approved an agreement to develop more than 2,600 acres along the Colorado River known as the “Dog’s Head” tracts.

Austinites largely testified against the deal Thursday, which cropped up on the council agenda just last week — and wasn’t vetted by city commissions ahead of the vote.

After hours of testimony, council members moved ahead to annex the site that’s roughly the size of downtown, kicking off a development process that would bring a mixed-use development to the East Austin tracts.

The 45-year deal would incorporate the 2,600-acre site into city limits and allow for a mixed-use development with the possibility of housing, along with commercial or industrial use.

The plot, which was previously an industrial site, is owned by an LLC with ties to Endeavor Real Estate Group, which would develop the land.

Neighbors living on the tracts say they hadn’t heard about the plan until this week, while other people reamed City Council for not properly vetting the Dog’s Head plan before rushing it to a vote.

Lee Edwards called the city’s push to develop the land “problematic.” He and other neighbors were caught off guard by the plan and called for more transparency from the city.

“I didn't find out about it until two days ago — not from Endeavor … not from the city — from a friend,” he said. “I didn't know any of this existed. We have an officially registered neighborhood association. It was not contacted.”

Lawyer Richard Suttle, who represents Endeavor, told council Tuesday that the project would be similar to the firm’s development of the Domain, which it gradually acquired and then later developed with the city’s help.

“We've been working on it for seven years now, and it needs to be in the city,” he said. “Frankly, it's a better project for the developer if it's in the city. So, it's a mutually beneficial deal.”

City staff estimate the property would bring as much as $3.5 billion in tax revenue over the next 30 years.

Suttle told council a "Fortune 100" company would be the first tenant at the site. He was limited in what he could say because of a non-disclosure agreement, but Suttle said the firm wanted to "move fast." He added that plans did not include a data center or a defense contractor, as some residents speculated.

The tracts’ geography, hemmed in by a meandering section of the Colorado River just east of U.S. Highway 183 and north of State Highway 130, also raised environmental and potential flooding concerns.

Bobby Levinski, an attorney and environmental advocate with Save Our Springs Alliance, said the deal doesn’t allow for typical land-use and zoning protections. Rather than going through city commissions and council, zoning changes could be approved by city staff with little oversight, he said.

“You are going to make changes to one of the most ecologically sensitive stretches of an urban river in the entire state of Texas,” Levinski said. “And you're going to prevent any future council for 45 years from correcting this mistake with one week's notice.”

The agreement would also allow developers to completely pave over the land, if they wanted. The contract has no limit on impervious cover, which could be problematic in a flood plain, opponents argued. Suttle estimated 20% of the site would be paved and that the plan aims to build out more parkland and bike trails.

Ahead of the vote, Mayor Kirk Watson said the city’s hands weren’t completely tied on the deal.

The developer would be required to submit a design plan, along with a list of possible uses for the land, to the city before Austin City Council approved a taxing district to get the project off the ground. On top of that, Watson argued, the city needs the tax money that would come from developing the land.

"My guess is none of us are going to consider this to be a perfect development, but it creates an opportunity, again, a unique one," he said. "There's no question it will be better than what it could be — and probably would be — if it's on the outside of our jurisdiction, if for no other reason, we wouldn't get any of the tax base."
Reply With Quote
     
     
  #20  
Old Posted Jun 15, 2026, 3:05 PM
ATX2030 ATX2030 is offline
Registered User
 
Join Date: Nov 2020
Posts: 988
Didn't take long, dirts already turning at the Dog's Head!

Work appears underway on big project in Austin's Dog's Head

A Fortune 100 company has eyed the site for an advanced manufacturing operation

Endeavor's 2,600-acre Dog's Head site was annexed into Austin city limits just last month, and the developer has already turned a ton of dirt for its first big project there. This story includes a video of ongoing work at the property.

https://www.bizjournals.com/austin/news/...roject-toaster-underway-fortune-100.html
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 5:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.