Quote:
Originally Posted by thefishingnut
Idiocy. 27% availability in 24/25 fiscal according to the article. 5 month outage for maintenance ending in December, run for a few months until another 119 day maintenance window starting in April. Anyone want to bet on that one finishing on time? Apparently having all hands on deck to improve the availability catastrophe isn't the priority.
A financial basketcase. Millions lost trying to turn salt water into power in Belledune. Millions lost on modular reactors, when they should have left it for Ontario to run. What was it, $700 million lost at Coleson Cove for orimulsion?
Ya, lets spend millions to look at medical isotopes, the NBPower track record on additional revenue generation is so sparkling, why not try another financial miracle flier. Who the hell is going to sign a contract with Lepreau when they have a 27% availability figure?
|
NB Power is a joke… but are there any air quality benefits from the upgrades they invested in for Orimulsion, or was it really just $700 million wasted? If so, I’m starting to understand why Shaun Graham was such a hated premier. That seawater to hydrogen stuff might not have been as huge of a loss as the Orimulsion fiasco, but it was far stupider.
I’ve heard so many stories about NB Power being one of the most poorly run, bloated, and inefficient crown corporations in the country, yet somehow we have cheaper electricity costs than a lot of other places in Canada.
There’s still a huge opportunity for a second CANDU at Point Lepreau, along with SMR projects, or the fuel recycling project proposed by Moltex.
This medical isotope proposal, if realized, could help NB attract more nuclear experts to the province, and could be a catalyst towards building a second CANDU reactor, or some SMRs.