HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Jun 16, 2020, 4:20 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 5,129
TORONTO | 200 Queens Quay West | 71 storeys

200 Queens Quay West

Nice bit of of colour/texture on the waterfront, to replace the (much-despised) massive parking garage blight presently on site.

The 71 storey tower is guess-timated around 240 metres or so.

Wallman/Lifetime. Posted by urbanyimby at UT.





Posted by Kenojuak at UT.



urbantoronto.ca/forum/attachments/1592320744304-png.251861/
Reply With Quote
     
     
  #2  
Old Posted Jun 28, 2020, 12:45 AM
koops65's Avatar
koops65 koops65 is online now
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,641
Here is how it'll appear in the skyline:

[IMG][/IMG]

[IMG][/IMG]

[IMG][/IMG]
Reply With Quote
     
     
  #3  
Old Posted Jan 16, 2024, 11:24 PM
Gresto's Avatar
Gresto Gresto is offline
Registered User
 
Join Date: Jul 2009
Location: Toronto
Posts: 5,194
Red face TORONTO | Q Tower | 648 FT, 197 M | 59 FLOORS

UrbanToronto
Quote:
Q Tower: a proposed 59-storey mixed-use rental and condominium buildings designed by Wallman Architects for Lifetime Developments and Diamond Corp on the southeast corner of Harbour Street and Lower Simcoe Street, in Toronto's Waterfront.

Reply With Quote
     
     
  #4  
Old Posted Sep 30, 2024, 2:11 PM
koops65's Avatar
koops65 koops65 is online now
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,641
[IMG][/IMG]

[IMG][/IMG]
Reply With Quote
     
     
  #5  
Old Posted Jan 29, 2025, 6:24 PM
Toronto_GTA Toronto_GTA is offline
Registered User
 
Join Date: Jan 2025
Posts: 22
Q Tower Project Summary

Selling right now starting at $500K CAD

GTA-Homes

This single tower includes a 6-storey, mixed-use podium that will hold retail, office and amenity space. The units will come in studio-, one-, two-, and three-bedroom layouts ranging in size from 361 sq.ft up-to 825 sq.ft.
Reply With Quote
     
     
  #6  
Old Posted Jan 29, 2025, 11:06 PM
ssh ssh is offline
Registered User
 
Join Date: Dec 2024
Location: Lower Manhattan/PA
Posts: 149
Toronto condo market + Canadian economy means that we should be skeptical of any proposal of this scale for now. I doubt this happens.
Reply With Quote
     
     
  #7  
Old Posted Jan 31, 2025, 1:27 PM
yaletown_fella yaletown_fella is offline
Registered User
 
Join Date: Feb 2009
Location: Toronto
Posts: 3,422
Quote:
Originally Posted by ssh View Post
Toronto condo market + Canadian economy means that we should be skeptical of any proposal of this scale for now. I doubt this happens.
We're not missing out on much considering this design is so lacklustre
__________________
Supporter of Bill 23
Reply With Quote
     
     
  #8  
Old Posted Jan 31, 2025, 2:49 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,807
Above ground parking structure on the site today currently being demolished:


https://urbantoronto.ca/forum/threads/to...ifetime-wallman-architects.27187/page-30
Reply With Quote
     
     
  #9  
Old Posted Jan 31, 2025, 4:09 PM
koops65's Avatar
koops65 koops65 is online now
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,641
Quote:
Originally Posted by ssh View Post
Toronto condo market + Canadian economy means that we should be skeptical of any proposal of this scale for now. I doubt this happens.
Seriously?

It IS happening...
Reply With Quote
     
     
  #10  
Old Posted Jan 31, 2025, 6:50 PM
ssh ssh is offline
Registered User
 
Join Date: Dec 2024
Location: Lower Manhattan/PA
Posts: 149
Quote:
Originally Posted by koops65 View Post
Seriously?

It IS happening...
Demolition of the parking structure has begun, doesn't mean the condos will ever be built.
Reply With Quote
     
     
  #11  
Old Posted Jan 31, 2025, 7:34 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,889
According to the developer, the sales are there. There's also a major non market housing component suggesting the development is going to be included in any of the municipal, provincial, federal housing accelerators.

This one is very likely going ahead not long after the site is prepped for construction
Reply With Quote
     
     
  #12  
Old Posted Jan 31, 2025, 11:07 PM
C. C. is offline
Registered User
 
Join Date: Jan 2014
Posts: 3,156
Reply With Quote
     
     
  #13  
Old Posted Feb 24, 2025, 4:55 PM
koops65's Avatar
koops65 koops65 is online now
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,641
[IMG][/IMG]
Reply With Quote
     
     
  #14  
Old Posted Feb 2, 2026, 5:52 AM
koops65's Avatar
koops65 koops65 is online now
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,641
Shoring has commenced.

In HD
[IMG][/IMG]
Reply With Quote
     
     
  #15  
Old Posted Feb 12, 2026, 9:52 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,391
A rare sight: Ground broken for Toronto's 60-storey Q Tower condo

Quote:
Lifetime Developments and DiamondCorp are advancing toward the construction of a rare development in Toronto these days. Q Tower is a 60-storey, 980-unit condominium on the site of a former parking garage at 200 Queens Quay W.

The 1.248-acre site was acquired from Canada Lands Company for $100 million in February 2020 when the Crown corporation realized there were better uses for the prime downtown location.

Sales for Q Tower kicked off in November 2023 at the Real Sports Bar & Grill. Close to 70 per cent of the units have been sold.

“We're very fortunate to be in a position today where we've achieved enough sales to allow us to get our construction financing to allow us to start construction and to allow us to commit to a delivery date, which will be at the end of 2029 to early 2030,” Brown said.
__________________
HAIF

Last edited by Urbannizer; Apr 29, 2026 at 2:08 AM.
Reply With Quote
     
     
  #16  
Old Posted Apr 29, 2026, 1:23 AM
Gresto's Avatar
Gresto Gresto is offline
Registered User
 
Join Date: Jul 2009
Location: Toronto
Posts: 5,194
Not too far from getting a crane. Photo by citylights at UT.

__________________
Donald Trump is so bereft of merit or utility, he wouldn't even make good fertilizer. The festering toxicity of his mental and physical effluvium drains the life out of everything in its vicinity.
Reply With Quote
     
     
  #17  
Old Posted Apr 29, 2026, 6:03 AM
koops65's Avatar
koops65 koops65 is online now
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,641
Yeah that thread will need to go to Construction soon...

In HD
[IMG][/IMG]

[IMG][/IMG]
Reply With Quote
     
     
  #18  
Old Posted Jun 5, 2026, 9:56 PM
koops65's Avatar
koops65 koops65 is online now
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 8,641
In HD
[IMG][/IMG]
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump



Forum Jump


All times are GMT. The time now is 8:20 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.