HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Dec 29, 2023, 6:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
1390 Dundas Street - Southbridge Care Homes - 5s 256 beds (Under Construction)

They have now poured most of the foundation footings and foundation walls on this 5 storey 256 bed home.


drone shots of the site posted on the planning consultant webpage.


https://www.linkedin.com/posts/zelin...597822464-rbmE
Reply With Quote
     
     
  #2  
Old Posted Jan 12, 2024, 4:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Concrete pump truck and a parade of concrete trucks working today onsite. Lots of activity with whatever section of this building was getting a big pour.
Reply With Quote
     
     
  #3  
Old Posted Jan 13, 2024, 11:59 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 826

Last edited by CanadianTalk; Feb 24, 2024 at 5:19 AM. Reason: re-uploaded image as it stopped showing
Reply With Quote
     
     
  #4  
Old Posted Jan 15, 2024, 1:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Nice to see an artist rendering of this new building on Dundas. Together with the new Humane Society building the look of this stretch of Dundas will definitely change. I wonder how many of the commercial and retail buildings on this stretch of Dundas east to First street will be replaced in the coming years with new developments as the former LPH property is transformed by Old Oaks? The old auto dealership and shopping plaza are tired and redevelopment would be good news.
Reply With Quote
     
     
  #5  
Old Posted Jan 19, 2024, 8:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Have already started forming for the first ground floor walls.
Reply With Quote
     
     
  #6  
Old Posted Feb 1, 2024, 9:04 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Have now got some of the ground floor walls poured and more forming now up.
Reply With Quote
     
     
  #7  
Old Posted Mar 4, 2024, 8:11 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Almost done forming up the ground floor walls and posts. Using the stiff styrofoam sheet forming technique which creates a reinforced concrete wall with steel rebar in the core. Should also be making progress with pouring the ground floor slab sections inside the ground floor walls soon as well.
Reply With Quote
     
     
  #8  
Old Posted Mar 23, 2024, 5:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Looks like all the ground floor walls are now poured. They have started forming for the 2nd floor walls on the north end of this 5s building. Suspect they have poured the ground floor and 2nd floor slab on the north end as well.
Reply With Quote
     
     
  #9  
Old Posted Apr 19, 2024, 1:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Concrete pump truck on site pouring some more of the 2nd floor walls in the middle section. It doesn't look like they have poured the ground floor slab yet on the section fronting Dundas St but they have the 2nd floor slab above poured. Looks like they will pour the ground floor slab later.
Reply With Quote
     
     
  #10  
Old Posted May 11, 2024, 9:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Forming now for 3rd floor walls on the north end of this 5s LTC building. Still haven't poured the ground floor slab on the south wing closest to Dundas St for some reason.
Reply With Quote
     
     
  #11  
Old Posted Jun 14, 2024, 5:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Nearly done forming and pouring of the 3rd floor walls on this 5s LTC building. Also looks like they are now done with the below slab utility installs as they have installed the plastic ground sheet on the south end wing in preparation for the concrete slab pour.
Reply With Quote
     
     
  #12  
Old Posted Jun 29, 2024, 11:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Have now got most of the 4th floor walls formed and poured on the north end of this 5s LTC building. Also have now poured the ground floor concrete slab on the south end.
Reply With Quote
     
     
  #13  
Old Posted Aug 18, 2024, 12:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Forming for the 5th floor walls now well underway on the north end of this 5s building. Still have some of the 5th floor slabs to install on the south end. Have already started installing some of the window units on the lower floors.
Reply With Quote
     
     
  #14  
Old Posted Sep 14, 2024, 3:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,230
Have started landing the concrete precast roof slabs on the north end of this 5s building. Still forming the 5th floor walls on the south end. Have made more progress installing the window units now upto the 4th floor.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 12:23 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.