  #1  
Old Posted Apr 27, 2019, 12:46 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
379 Sunningdale Rd - Tricar - 4 10s rentals

Urban design brief for another proposed Tricar Rental project. Four 10s buildings on north side of Sunningdale.


https://www.london.ca/business/Plann...2019-04-17.pdf
Reply With Quote
     
     
  #2  
Old Posted Jun 13, 2019, 10:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Bulldozers stripping off top soil today onsite.
Reply With Quote
     
     
  #3  
Old Posted Jul 16, 2019, 12:57 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Lane restrictions along Sunningdale Rd as they cut in for the sewer connections. They appear to be prepping for the underground sewer connections for the roadway to serve the buildings that will be built on the site.

One would hope that the study now underway for Sunningdale Rd widening to 5 lanes is being considered now. It's already becoming a major West-East alternative to Fanshawe Park Rd.
Reply With Quote
     
     
  #4  
Old Posted Oct 6, 2019, 6:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Excavation appears to be starting for 1st of the four 10s towers planned for this Tricar project. Sewers and underground services appear to be finishing up and connection to Sunningdale Rd appears to be wrapped up now. Could see foundation work starting soon and a tower crane up before end of year.
Reply With Quote
     
     
  #5  
Old Posted Dec 5, 2019, 7:23 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Major excavation now underway for first building on site. The most westerly one overlooking the creek. There will be one level of underground parking. Line up of dump trucks hauling away soil today.
Reply With Quote
     
     
  #6  
Old Posted Dec 18, 2019, 1:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Have already started the concrete footing pours for the first building.
Reply With Quote
     
     
  #7  
Old Posted Jan 22, 2020, 6:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
These will be condos. Trailer on site for Sales office now. Already forming up for L1 level walls and most of footings are now poured. I would expect Tricar to be moving the tower crane from York St building here in the near future. As soon as they can take the tower crane down they will.
Reply With Quote
     
     
  #8  
Old Posted Feb 10, 2020, 12:08 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
L1 level walls now poured along west side of underground garage.
Reply With Quote
     
     
  #9  
Old Posted Feb 28, 2020, 10:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
More progress on the L1 level walls and foundation for the west tower.
Reply With Quote
     
     
  #10  
Old Posted Mar 5, 2020, 3:40 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Reply With Quote
     
     
  #11  
Old Posted Mar 22, 2020, 3:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Lots of progress on the L1 foundation walls and posts. Should start grading and prepping for the floor slab pour soon. Imagine they would like to have a tower crane on site soon to help.
Reply With Quote
     
     
  #12  
Old Posted Mar 27, 2020, 9:35 PM
goldandnavy goldandnavy is offline
Registered User
 
Join Date: Oct 2016
Location: London
Posts: 25
Tower crane started being installed today
Reply With Quote
     
     
  #13  
Old Posted Apr 5, 2020, 2:21 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Tower crane installation is stalled or stopped with only a few of the tower segments up.
Reply With Quote
     
     
  #14  
Old Posted Apr 16, 2020, 4:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Looks like they are prepping to finish the tower crane installation with a heavy lift mobile crane back on site.
Reply With Quote
     
     
  #15  
Old Posted Apr 19, 2020, 4:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Tricar has the tower crane fully assembled now.
Reply With Quote
     
     
  #16  
Old Posted Apr 24, 2020, 8:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
They have been busy setting precast concrete beams for underground parking level. Not clear yet if they will use precast concrete for the structure of these buildings or form and pour method.
Reply With Quote
     
     
  #17  
Old Posted Apr 27, 2020, 8:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Setting pre-cast concrete slabs today.
Reply With Quote
     
     
  #18  
Old Posted May 5, 2020, 4:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Work on precast concrete slab installation continues for parking level. Preparing forms for next level on north side already. They should be starting the ramp work this week as well.
Reply With Quote
     
     
  #19  
Old Posted May 13, 2020, 3:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Installing some of the L1 level precast walls now and forming for ramp underway.
Reply With Quote
     
     
  #20  
Old Posted Jun 22, 2020, 12:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,352
Ground level concrete slabs well underway now. 1st floor above ground should be starting soon.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 12:57 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.