Project Rundown
Unless noted otherwise, all projects for each location are arranged first by status, then by cost, if known (most to least expensive).
Status Order: - under-construction (listed first)
- approved / proposed (listed second)
- completed (listed third, newest to oldest)
- demolished / destroyed (listed fourth)
- cancelled (listed last)
Kalamazoo
Code:
WMU "Hilltop Village", multi-phase, under construction (~ $500+ million)
(general location)
Source: WMU
Kalamazoo Country Club Expansion, under construction (~ $100+ million?)
1609 Whites Rd.
Source: MLive | City of Kalamazoo
KRESA Career Tech Center, under construction (~ $100 million)
5322 S. Sprinkle Rd.
Source: City of Kalamazoo
Kalamazoo County Downtown Justice Facility, under construction ($95 million)
(general location)
Source: MLive | Courtesy TowerPinkster
Zoetis Expansion, under construction ($95 million)
2605 E. Kilgore Rd.
Source: LinkedIn | Schweitzer Incorporated
I-94 widening & Portage Road interchange rebuild, under construction ($87 million)
(general location)
Source: MLive | Courtesy MDOT
WMU Dunbar Hall Renovation, under construction ($40 million)
(general location)
Source: WMU Capital Projects
530 S Rose St. (Senior Living), under construction (~ $15 million?)
(location)
Source: Second Wave Media | Kalamazoo County
Boys & Girls Club of Greater Kalamazoo, under construction ($11 million)
(general location)
Source: Boys & Girls Club of Greater Kalamazoo
Eastside Square Mixed-Use (multi-phase), under construction (~ $10 million?)
(general location)
Source: InForm Architecture
Public Safety Station No. 2, under construction ($9.5 million)
(general location)
Source: MLive | City of Kalamazoo
Capital Health Group - Drug Rehab Facility, under construction (~ $5 million?)
1430 Alamo Ave.
Source: Kalamazoo Site Plan Review
Zone 32 / Bogan Development, under construction ($3.2 million)
(315 E Frank St.)
Source: City of Kalamazoo
Old Douglass Community Center, under construction (~ $2 million?)
(general location)
Source: My own photo
Children's Nature Playscape, Phase 2 under construction ($1.6 million)
(Phase 1 completed July 2022)
302 Academy St.
Source: WKZO
Downtown Stadium / Event Center, proposed (~ $100+ million)
(general location)
Source: MLive
Unnamed Plazacorp Development, proposed ($100 million)
(general location)
Source: Mike Krafcik | WWMT (edited)
2022 Kalamazoo College Master Plan projects, proposed (~ $70+ million?)
(general location)
Source: Kalamazoo College Facilities
Hard Rock Reverb Hotel & Gibson Guitar Museum, proposed (~ $50+ million?)
225 Parsons St.
Source: WWMT | Contributed
Downtown Two-Way Street Conversion, proposed (~ $30+ million)
(general location)
Source: Joel Bissell | MLive
140 S Edwards St. Redevelopment, proposed ($25+ million?)
140 S Edwards St.
Source: miplace.org
River's Edge (River Caddis Development), proposed ($55 million)
508 Harrison / 600 Gull Rd.
Source: MLive | Byce & Associates
Arcadia Lofts, proposed (~ $20+ million?)
203 N Rose St.
Source: City of Kalamazoo | Bosch Architecture
619 Porter Development, proposed ($13.2 million)
(general location)
Source: WWMT | Courtesy PlazaCorp LLC
Hawthorne Park, proposed (~ $10 million?)
205 / 209 E. Stockbridge Ave.
Source: MLive
Mt. Zion Northside Senior Housing Project, proposed (~ $8 million?)
(general location)
Source: Second Wave Media | Courtesy Byce & Associates, Inc.
215 E Michigan Ave., proposed ($4.2 million)
215 E Michigan Ave.
Source: MLive | Brad Devereaux
266 E. Michigan Ave. apartment conversion, proposed (~ $4 million?)
(location)
Source: City of Kalamazoo
809, 813, and 817 Porter Street, proposed (~ $3 million)?
(general location)
<no image available yet>
902 W North St / Jabez, proposed (~ $3 million)
902 W North St.
Source: 7GenAE
718 N. Burdick St, proposed (~ $2 million?)
718 N. Burdick St.
Source: City of Kalamazoo
Whitley Memorial Funeral Home, proposed (~ $1 million?)
(general location)
Source: Intersect Studio
HOPE Project / Northside Tiny House Development, proposed (~ $1 million?)
(general location)
Source: MLive
Coffee Shop and Office, proposed (~ $500,000?)
1023 Riverview Dr.
Source: City of Kalamazoo
Edison Academy, completed August 2023 ($18 million)
924 Russell St.
Source: MLive | Cory Morse
WMU Student Center and Dining Facility, completed July 2023 ($70+ million)
(general location)
Source: LinkedIn | WMU
ISK Behavioral Health Urgent Care, completed July 2023 (~ $5 million)
440 W. Kalamazoo Ave.
Source: My own photo
Woods Lake Square, completed June 2023 (~ $7 million?)
3110 Oakland Dr.
Source: My own photo
400 Rose Phase 2, completed June 2023 ($26.2 million)
234 W Cedar St.
Source: My own photo
Heritage Community of Kalamazoo - Revel Creek, completed November 2022 ($60 million)
2400 Portage St. / 500 Golden Dr.
Source: City of Kalamazoo Site Plan Review
WP Diner @ Washington Square, completed September 2022 (~ $1.5 million?)
1324 portage St.
Source: MLive | Sophie Hillmeyer
Bank Street Farmers Market Expansion, completed summer 2022 ($10 million)
251 Mills St.
Source: MLive | Joel Bissell
Graphic Packaging International Expansion, completed summer 2022 ($600 million)
1810 N Pitcher St.
Source: City of Kalamazoo
Westgate Apartments, completed July 2022 ($4.7 million)
615 W Kalamazoo Ave.
Source: My own photo
LodgeHouse / Knights Inn Conversion, completed July 2022 (~ $5 million?)
1211 S. Westnedge Ave.
Source: City of Kalamazoo / INFORM Architecture
Yuma Way / Urban Gardens Cannabis, completed May 2022 (~ $500,000?)
617 Portage St.
Source: City of Kalamazoo | Driven Design
RAIR Dispensary, completed April 2022 (~ $2 million)
104 / 110 N Drake Rd.
Source: City of Kalamazoo / RAIR
Gospel Ministries Women & Children's Shelter, completed March 2022 ($10 million)
(general location)
Source: AVB
Brick + Brine (restaurant), in the Radisson, completed January 2022 (~ $1 million?)
100 W Michigan Ave.
Source: Open Table
Kalsee Credit Union, Milwood Branch, completed January 2022 (~ $1.5 million?)
3121 Portage St.
Source: LinkedIn | Schweitzer Inc.
The Monroe Building restoration, completed 2021? (~ $2 million?)
151 E Michigan Ave.
Source: LinkedIn | Treystar
Fraternity Village Apartments, completed fall 2021 (~ $500,000?)
1709 Fraternity Village Dr.
Source: LinkedIn | AVB
Kalamazoo College Natatorium, completed October 2021 ($18 million)
(general location)
Source: mortarr.com
Haymarket Plaza, completed September 2021 (< $1 million?)
(general location)
Source: WWMT | Jason Heeres
Warner Building, a.k.a. CD12, completed September 2021 ($70+ million)
180 E Water St.
Source: MiBiz | Courtesy of Catalyst Development Co. LLC
Harrison Circle Apartments, completed August 2021 ($18 million)
(general location)
Source: Apartments.com
Kalamazoo Latvian Church, completed August 2021 (~ $2 million?)
100 Cherryhill St.
Source: LinkedIn | Intersect Studio
Home2 Suites, completed May 2021 (~ $28 million?)
(general location)
Source: MLive
Eastside City Life Teen Center, completed March 2021 ($3 million)
2528 E. Main St.
Source: GRBJ | Courtesy CD Barnes
The Creamery, completed March 2021 ($14.7 million)
corner of Lake and Portage Sts.
Source: kalamazoolteracy.org
Bronson / Frank J. Sardone Cancer Pavilion, completed February 2021 ($60 million)
805 John St.
Source: Contributed
WMU Arcadia Flats Apartments, completed January 2021 ($60 million)
1760 Ring Rd S
Source: MLive | Joel Bissell
Chick-fil-A, West Main & Drake, completed January 2021 (Kalamazoo's first)
504 N Drake Rd.
Source: My own photo
Avid Hotel Kalamazoo East, completed early 2021 (~ $15 million?)
3717 East Cork St.
Source: My own photo
Oakland Drive Office Building, completed early 2021 (~ $1 million?)
(general location)
Source: LinkedIn | AVB
Cork Street Reconstruction, completed late 2020 ($6.5 million)
(general location)
Source: MLive | City of Kalamazoo
Hilton Garden Inn, completed November 2020 (~ $18 million?)
303 N Rose St.
Source: My own photo
MDHHS Office Building, completed November 2020 ($20 million)
427 E Alcott St.
Source: My own photo
St. Augustine Cathedral Upgrades, completed late 2020 ($2.8 million)
542 W Michigan Ave.
Source: Miller Davis
Honor Credit Union Stadium Dr. Member Center, completed August 2020 (~ $1.5 million?)
4400 Stadium Dr.
Source: Honor Credit Union
Bronson Lab Testing Facility, completed July 2020 (~ $6 million?)
400 John St.
Source: Instagram | TowerPinkster
400 Rose Phase 1, completed Summer 2020 ($24.2 million)
400 S Rose St.
Source: AVB
The Exchange, completed mid-2020 ($53 million)
155 W Michigan Ave.
Source: Instagram | @byceassociate
Gilmore Apartments, completed 2020 (~ $6 million?)
100 Portage St.
Source: kalamazoostudios.com
Honor Credit Union Downtown Connect Center, completed November 2019 (~ $1.5 million?)
148 E Michigan Ave.
Source: My own photo
First National Bank Renovation, completed fall 2019 (~ $2 million?)
318 W Michigan Ave.
Source: My own photo
The Montessori School expansion, completed summer 2019 ( ~ $1.5 million?)
750 Howard St.
Source: Kayla Miller | MLive
Newell Brands Design Center Expansion, completed summer 2019 ($7.3 million)
3300 Research Way
Source: Newell Brands | LinkedIn
Apartment Conversion / Buildout & Remodel, completed summer 2019 (~ $2 million?)
220 W. Michigan Ave.
Source: my own photo
The Park Club restoration, completed summer 2019 (~ $1.5 million?)
219 W South St.
Source: my own photo
Kalamazoo County DHHS, completed spring 2018 (~ $ 12 million?)
(renovation of former Illinois Envelope Company building)
311 E Alcott St.
Source: My own photo
Family Health Center - Alcott, completed April 2017 ($15 million)
505 E Alcott St.
Source: Eckert-Wordell
2700 West, completed August 2015 (~ $15 million?)
2700 W. Michigan Ave.
Source: Byce & Associates
Newell Brands Design Center, completed May 2014 (~ $16 million?)
3300 Research Way
Source: Perkins&Will
Family Health Center - Paterson, completed July 2012 (~ $15 million?)
117 W Paterson St.
Source: Family Health Center
WMU Davis, French, & Zimmerman Halls, demolished mid-2021 (~ $2 million?)
(general location)
Source: My own photo (July 2021)
WMU Draper and Siedschlag Halls, demolished February 2021 (~ $400,000?)
(general location)
Source: Instagram | @facilities_wmu
First Reformed Church, demolished January 2021 (~ $150,000?)
302 Academy St.
Source: MLive | Joel Bissell
Boatyard Brewing, demolished July 2020 (~ $60,000?)
432 E Paterson St.
Source: Facebook | Jane Brewer
900 Block of W North St, destroyed by arson / demolished June 2020 (~ $100,000?)
(general location)
Source: MLive | Joel Bissell
Congregation of St. Joseph, demolished March 2020 (~ $500,000?)
(general location)
Source: My own photo
Church of Christ Scientist, demolished August 2019 (~ $150,000?)
(general location)
Source: My own photo
Fountain of the Pioneers, deconstructed spring 2018 ($200,000)
(general location)
Source: My own photo
Bryant Mill / Allied Paper Corp., demolished 2004 - 2008 (~ $1 million+?)
(general location)
Source: alliedpaper.net
440 S Burdick, cancelled (~ $40 million?)
440 S Burdick St.
Source: City of Kalamazoo ZBA
Battle Creek
Code:
Double Tree by Hilton, under construction (~ $60 million)
former McCamly Plaza Hotel conversion
(general location)
Source: Second Wave Media | BCU
Duncan Aviation Expansion, under construction ($40 million)
(general location)
Source: Battle Creek Enquirer | Provided
Redwood Battle Creek, under construction (~ $10+ million?)
(general location)
Source: Battle Creek Enquirer | Provided
99 & 103 W. Michigan Ave. Rehabilitation, under construction (~ $4 million?)
103 W. Michigan Ave.
Source: LinkedIn | BCU
Ralston Purina Co. Factory Redevelopment, proposed (~ $50+ million?)
150 McCamly St. South
Image Source: Alyssa Keown | The Battle Creek Enquirer
BCPS Northwestern Middle School / K-8 Arts Academy, proposed ($40 million)
176 Limit St.
Source: Battle Creek Enquirer | Battle Creek Public Schools / C2AE
Sophia Square, proposed ($20.6 million)
85 W. Michigan Ave.
<no image available yet>
Downtown Kalamazoo River Restoration, proposed ($20+ million)
(general location)
Source: Second Wave Media | Courtesy Battle Creek Whitewater
Bowers Aluminum Expansion, proposed ($7.8 million)
1401 Shiga Dr.
Source: Bowers Aluminum Co.
Housing-First Transition Housing, proposed (~ $6.5 million?)
535 W Van Buren St.
<no image available yet>
Oak Hill Cemetery Chapel renovation, proposed ($300,000)
255 South Ave.
Source: Second Wave Media | John Grap
Kingman Museum, vacant / at-risk
175 Limit St.
Source: Battle Creek Enquirer
Bronson Behavioral Health Hospital, completed June 2023 ($35 million)
(general location)
Source: Wood TV 8 | Courtesy Rendering
New Holland Brewing, completed March 2023 (~ $3 million?)
64 W Michigan Ave.
Source: Phil Gawel | WWMT
Magna Cosma Casting expansion, completed fall 2021 ($31.9 million)
10 Clark Rd N
Source: Second Wave Media | Shabaka Gibson / BCU
IPUSA Spec. Building, completed September 2021 ($11 million)
(general location)
Source: Industrial Partners USA
WMU Aviation Education College Addition, completed September 2021 ($24 million)
237 Helmer Rd N
Source: WWMT | Lexie Petrovic
The Milton, completed spring 2021 ($36 million)
25 W Michigan Ave.
Source: Instagram | @michigan business
Summit Pointe First Step Psychiatric Urgent Care, completed Mar. 2021 (~ $20 million?)
175 College St.
Source: Second Wave Media
Kellogg's Innovation Suite, completed February 2021 (~ $2 million?)
2 Hamblin Ave.
Source: FSR Magazine | Courtesy Kellogg Company
One Nation - Tap & Table, completed January 2021 (~ $500,000?)
544 W Columbia Ave.
Source: https://onenationbc.com
Record Box / Handmap Brewing, completed 2018 - 2020 (~ $5 million?)
15 Carlyle St.
Source: felixandfingers.com
Battle Creek Police Department Station, completed August 2018 ($16 million)
20 N Division St.
Source: Schweitzer, Inc.
Bronson Family Medicine - Helmer Road, completed May 2017 (~ $5.5 million?)
2900 Watkins Rd, Battle Creek
Source: Bronson Health
Battle Creek Area Math & Science Center, completed December 2013 ($14 million)
171 Michigan Ave.
Source: Schweitzer
Former Kmart, demolished spring 2021 (~ $300,000?)
200 Capital Ave.
Source: The Battle Creek Enquirer
Binder Building, demolished December 2020 (~ $80,000?)
34 E Michigan Ave.
Source: Battle Creek Enquirer | Trace Christenson
Portage
Code:
Pfizer Modular Aseptic Production building (MAP), under construction ($465 million)
(general location)
Source: MEDC | Courtesy Pfizer
PPS 2021 Bond Projects, under construction ($175.7 million)
Replace five elementary schools & remodel one
(multiple locations - new Haverhill Elementary rendering - pictured)
Source: Mlive
Tall Timbers, under construction ($47 million)
3413 W Centre Ave.
Source: MLive | City of Portage
Springhill Suites, under construction (~ $16 million?)
(850 Trade Centre Way)
Source: My own photo
Redwood Apartments Portage, under construction (~ $20 million?)
(general location)
Source: My own photo
IPUSA Spec. Building, under construction (~ $12 million?)
(general location)
Source: First & 42 | Greg Dilone
River Caddis Mixed-Use Development, proposed ($31 million)
(general location)
Source: MLive | Integrated Architecture / provided by City of Portage
Foxwood and The Hermitage expansion, proposed (~ $12 million?)
4670 Fox Valley Ave.
Source: WWMT | Pat Hagan, Jon McCrary
Woodbridge Hills Expansion, proposed (~ $12 million?)
(general location)
Source: City of Portage
Midwest Fastener Corp. Expansion, proposed ($11 million)
9031 Shaver Rd.
Source: LinkedIn | Wightman
Meijer Renovation, completed late 2022 ($40 million)
5121 S Westnedge Ave.
Source: Emily Reed | WWMT
Charles & Lynn Zhang Portage Community Senior Center, completed May 2022 ($11 million)
203 East Centre Ave.
Source: MLive | Joel Bissell
Portage District Library Remodel & Expansion, completed May 2022 ($13 million)
300 Library Lane
Source: My own photo (July 2021)
Portage Northern Natatorium, completed August 2021 ($12 million)
5808 Oregon Ave.
Source: C2AE
Meridian FedEx Distribution Center, completed December 2020 (~ $40 million?)
6701 Portage Rd.
Source: RE Business Online
Portage Community Outreach Center Remodel, completed November 2020 (~ $2.5 million?)
325 E Centre Ave
Source: My own photo
Replacement Fire Station No. 2, completed October 2020 ($6 million)
6101 Oakland Dr.
Source: LinkedIn | AVB
Portage Central Middle School, completed August 2020 (~ $33 million?)
8305 S Westnedge Ave.
Source: Portage Public Schools
Bronson Primary Care Partners, completed July 2020 (~ $6 million?)
2700 East Centre Ave.
Source: Bronson Health
Buddy's Pizza, completed July 2020 (~ $250,000?)
5314 S Westnedge Ave.
Source: WWMT / Newschannel 3
Stryker Instruments R&D Center, completed mid-2020 ($154 million)
1941 Stryker Way
Source: HOK
Celery Flats Trailhead Pavilion, completed summer 2019 (~ $600,000?)
7328 Garden Ln.
Source: Wightman
Portage North Middle School, completed August 2019 ($31 million)
1100 W Milham Ave.
Source: LinkedIn | C2AE / Jason Keen
Portage Central McCamley Field / Athletic Facilities, completed August 2019
(~ $4 million?)
8135 S Westnedge Ave.
Source: Facebook | Discover Kalamazoo Sports
Portage Northern Huskies Stadium / Athletic Facilities, completed August 2018
($3 million)
1000 Idaho Ave.
Source: C2AE
Portage Central Natatorium, completed summer 2018 ($9 million)
8135 S Westnedge Ave.
Source: C2AE
Pfizer Cold Storage Warehouse, completed February 2018 ($30 million)
7000 Portage Rd.
Source: My own photo
Oshtemo Township
Code:
WMU BTR Park Phase 2 Expansion, ongoing ($100+ million)
(general location)
Source: Fishbeck, Thompson, Carr & Huber, Inc.
Corner@Drake retail development, ongoing ($100+ million)
(general location)
Source: My own photo
FlavorSum Expansion, under construction ($10 million)
3680 Stadium Park Way
Source: Executive Office of the Governor / WWMT
Kalamazoo National Guard Armory Renovation, proposed ($5 million)
5353 Parkview Ave.
Source: WWMT | Maria Serrano
District No. 10 School House Rehabilitation, proposed (~ $1 million?)
near Stadium Dr. and 9th St.
Source: WMUK | Sehvilla Mann
Martin Luther King Jr. Park, proposed (~ $500,000)
(general location)
Source: MLive | City of Portage
Advia Credit Union HQ, completed late 2021 (~ $35 million?)
6400 West Main St.
Source: Joel Bissell | MLive
Ascension Borgess Cancer Center, completed September 2021 ($20 million)
(general location)
Source: Fishbeck, Thompson, Carr & Huber, Inc.
Consumers Credit Union, completed July 2020 (~ 2.8 million?)
5018 W Main St.
Source: My own photo
Bronson Primary Care Partners, completed July 2020 (~ $6 million?)
6210 W Main St.
Source: My own photo
Holiday Inn & Suites Kalamazoo West, completed fall 2019 (~ $16 million?)
1247 Westgate Dr.
Source: IHG
Holiday Inn Express & Suites Kalamazoo West, completed summer 2019 (~ $12 million?)
1315 Westgate Dr.
Source: IHG
Natural Flavors (FlavorSum) Production Facility, completed c. 2018 (~ $14 million?)
3680 Stadium Park Way
Source: LinkedIn | Tower Pinkster
Kalamazoo Township
Texas Township
Comstock Township
Emmett Township
Richland Township
Pavilion Township
Ross Township
Village of Vicksburg
Galesburg