Marriott AC Hotel in the SkyscraperPage Database

Building Data Page   • Fort Worth Skyscraper Diagram

Map Location

Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Feb 11, 2016, 9:19 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: SXSW
Posts: 8,975
FORT WORTH | Marriott AC Hotel | 185 FT | 16 FLOORS

Developer: Jackson-Shaw
Architect: Merriman Associates Architects
Type: Hotel
Location: Fifth & Main, Downtown
Construction Timeline:



Quote:
This fourteen story building will be new construction, to house a Marriott AC hotel. The hotel will have 180 guest rooms, plus restaurant, bar and meeting functions. A roof top pool/amenity deck will also be part of the hotel. Retail space on the sides of the building, at grade level, will allow for a retail link to Sundance Square, which is a half a block away. The modern design uses a combination of materials to allow the new building to blend with the adjacent historic structures. The side is very urban and is 60’x 200’ in size.
http://merriman-maa.com/portfolio/
__________________
HAIF

Last edited by Urbannizer; Aug 22, 2018 at 9:23 PM.
Reply With Quote
     
     
  #2  
Old Posted Feb 11, 2016, 10:09 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Some more info on this, across the street is an existing historic office building which is being converted to a 165 room Marriot Autograph hotel, so it's assumed that these projects are related.

This is the building being converted,


Source

There's no timeline but it's been about a year since the first details of either hotel started coming out so perhaps something will happen soon.
Reply With Quote
     
     
  #3  
Old Posted Mar 3, 2017, 9:30 PM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Developer shows plan for 15-story AC Hotel in downtown Fort Worth



Quote:
Michele Wheeler, president and chief operating officer at Jackson-Shaw, said the company has the parking lot under contract and is conducting a due diligence review. She said the project is not a done deal yet and that issues surrounding electric utilities at the site have not been resolved.

Jackson-Shaw, though, received conceptual approval for a 218-room hotel Thursday from the Downtown Design Review Board. The developers will require other approvals to move forward with construction. Wheeler said there is no timeline for that.
Reply With Quote
     
     
  #4  
Old Posted Dec 7, 2017, 5:20 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
AC Hotel, a brand popular in Europe, gets key incentive to build in downtown Fort Worth

Project Location

Quote:
Construction on the $68.5 million, 16-story AC Hotel on Main Street in downtown Fort Worth will begin mid-2018, the developer said Wednesday after a special taxing district approved a $4.1 million incentive for the project.

For a moment during the Downtown Tax Increment Finance District board meeting, though, it appeared the project might be derailed for lack of support.

At issue was whether public dollars could be used to pay for a transformer that Oncor electric utility requires for the building. In downtown, Oncor requires an electrical vault for the transformer and two back-up transformers in the case of outages.

Of the developer’s $4.1 million request, $3.1 million would be reimbursement for the electrical vault, which is typically built under the sidewalk. The developer will receive the money over 22 months.

The money will come from property taxes generated within a designated area downtown. The money is reinvested in development instead of going into the city’s general fund.
Quote:
The land has been used as a 32-space parking lot for the past 20 years. It will take two years to build, according to the developer, Dallas-based Jackson-Shaw.

The building will include space for shops and restaurants, meeting rooms and a rooftop patio. The project was approved by the Downtown Design Review Board in November.
Reply With Quote
     
     
  #5  
Old Posted Aug 22, 2018, 8:55 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Site prep. New size is 185 ft with 16 floors above ground, one below.
Reply With Quote
     
     
  #6  
Old Posted Aug 23, 2018, 4:16 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
...
 
Join Date: Jul 2001
Location: the upside down
Posts: 51,092
Can you tell me where you found the 185 foot height for it? I'd like to update the building's database page.
__________________
"You see, we are here, as far as I can tell, to help each other; our brothers, our sisters, our friends, our enemies. That is to help each other and not hurt each other." - Stevie Ray Vaughan
Reply With Quote
     
     
  #7  
Old Posted Aug 23, 2018, 7:19 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Quote:
Originally Posted by KevinFromTexas View Post
Can you tell me where you found the 185 foot height for it? I'd like to update the building's database page.
FAA. John Roberts has 177' to the parapet on a design document, but that doesn't count the elevator overrun and rooftop mechanical.
Reply With Quote
     
     
  #8  
Old Posted Jan 4, 2019, 11:32 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Reply With Quote
     
     
  #9  
Old Posted Mar 7, 2019, 7:49 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Excavation nearly complete

Reply With Quote
     
     
  #10  
Old Posted Jul 25, 2019, 8:25 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Going vertical quickly now

Reply With Quote
     
     
  #11  
Old Posted Jul 25, 2019, 8:49 PM
JMKeynes's Avatar
JMKeynes JMKeynes is online now
In the long run...
 
Join Date: Aug 2017
Location: SW3
Posts: 1,696
__________________
"Men will still say, 'This was their finest hour.'"
Reply With Quote
     
     
  #12  
Old Posted Sep 7, 2019, 9:26 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
9/7/19 Photo by me

Reply With Quote
     
     
  #13  
Old Posted Oct 17, 2019, 9:46 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Work starting on floor 11

Reply With Quote
     
     
  #14  
Old Posted Nov 20, 2019, 4:56 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
2 floors left

Reply With Quote
     
     
  #15  
Old Posted Jan 11, 2020, 7:39 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Topped out

Reply With Quote
     
     
  #16  
Old Posted Jun 14, 2020, 8:12 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,956
Facade going up

Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 3:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2020, vBulletin Solutions, Inc.