  #1541  
Old Posted May 27, 2021, 5:42 PM
RUSTY386 RUSTY386 is offline
Registered User
 
Join Date: Apr 2019
Location: Riverview
Posts: 40
Quote:
Originally Posted by MonctonRad View Post
The bridge will be both wider and longer. I believe the new bridge is about twice as long as the span of the old causeway gates. I agree with you, water flow will be enhanced, and the river will eventually be flushed out to a new width.

Could it have been better? Sure, but this will be a real improvement over what was there previously.
from a DTI article

the bridge portion itself is 240m long

During this phase, a pilot channel will be excavated under the bridge, essentially diverting the flow of the river and widening it to 180 metres from the current 61 metres.
Reply With Quote
     
     
  #1542  
Old Posted May 28, 2021, 12:22 AM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
Was able to snap a couple of pics at The Tides site today.



Reply With Quote
     
     
  #1543  
Old Posted May 28, 2021, 8:34 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
I thought they'd be digging down deeper, since The Tides has underground parking. It doesn't seem to be much lower than the road.
Reply With Quote
     
     
  #1544  
Old Posted May 29, 2021, 9:58 AM
riverviewer's Avatar
riverviewer riverviewer is offline
Random Contributor
 
Join Date: Sep 2008
Location: Siknikt
Posts: 422
Quote:
Originally Posted by jonny golden View Post
I thought they'd be digging down deeper, since The Tides has underground parking. It doesn't seem to be much lower than the road.
It is underground if you consider that the building points backward and ground level is higher up the hill. The road is much lower than the main floor, and they'll have to walk up the hill two floors to get to the level of the main entrance on the back.
Reply With Quote
     
     
  #1545  
Old Posted May 29, 2021, 4:38 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
Quote:
Originally Posted by riverviewer View Post
It is underground if you consider that the building points backward and ground level is higher up the hill. The road is much lower than the main floor, and they'll have to walk up the hill two floors to get to the level of the main entrance on the back.
Yeah, makes sense if the driveway inclines to the parking lot at the back. Then the main floor entrance would be higher than the road.
Reply With Quote
     
     
  #1546  
Old Posted May 31, 2021, 3:43 AM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
Drone video of the causeway replacement project from Sunday.
Reply With Quote
     
     
  #1547  
Old Posted May 31, 2021, 3:55 PM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,750
Quote:
Originally Posted by jonny golden View Post
Drone video of the causeway replacement project from Sunday.
Do you have the link?
__________________
We The People
Reply With Quote
     
     
  #1548  
Old Posted May 31, 2021, 4:15 PM
David_99's Avatar
David_99 David_99 is offline
Registered User
 
Join Date: Nov 2008
Posts: 851
Quote:
Originally Posted by josh_cat_eyes View Post
Do you have the link?
https://youtu.be/Xl1drSKglwI
Reply With Quote
     
     
  #1549  
Old Posted May 31, 2021, 4:29 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
Quote:
Originally Posted by josh_cat_eyes View Post
Do you have the link?
Oops sorry. It was late I was tired. I see it's been posted.
Reply With Quote
     
     
  #1550  
Old Posted Jun 1, 2021, 10:27 PM
David_99's Avatar
David_99 David_99 is offline
Registered User
 
Join Date: Nov 2008
Posts: 851
https://youtu.be/f59G5gHKhmw

Here’s another video of the causeway being dismantled.
Reply With Quote
     
     
  #1551  
Old Posted Jun 2, 2021, 12:29 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,079


Here's a better one. The gate superstructure is starting to come down (they removed the railing yesterday)

Video Link


Lot's of drone footage floating about out there.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1552  
Old Posted Jun 4, 2021, 3:07 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,079
Another drone video of the bridge replacement, from yesterday:

Video Link


Observations:

1) - decorative streetlighting has been installed on the bridge and the Moncton approaches. It looks a lot like the lighting on the Gunningsville Bridge.
2) - the river channel is definitely widening, especially upstream fro the former causeway.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1553  
Old Posted Jun 4, 2021, 8:04 PM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,750
The land has been cleared for the new Thrive building off of Gunningsville. I believe that work is planned to start in this building sometime early this summer.

https://thriveproperties.ca/projects/dobson-crossing/
__________________
We The People
Reply With Quote
     
     
  #1554  
Old Posted Jun 4, 2021, 8:05 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
It seems like they might be ahead of schedule. Every time I look at a new drone video, they've made quite a lot of progress. Of course they probably gave themselves a cushion when estimating the completion date.
Reply With Quote
     
     
  #1555  
Old Posted Jun 5, 2021, 7:57 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,079
Regarding The Kensington in Clayton's Fairways development:

The have one of the two buildings completely framed and closed in, but there has been no movement on the second building (except for the common foundation). Are they not starting the second building until the first building is complete?

Also, there are some updated renderings available on their website:
https://www.fairwaysriverview.ca/the-kensington-apartments



It looks a bit different than initially conceived, but still nice enough. Many of the units are three bedroom or two bedroom plus den. This remains a high quality development. The list of amenities is available on the website above.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1556  
Old Posted Jun 7, 2021, 12:17 AM
BlackYear's Avatar
BlackYear BlackYear is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,276
Quote:
Originally Posted by MonctonRad View Post
Regarding The Kensington in Clayton's Fairways development:

The have one of the two buildings completely framed and closed in, but there has been no movement on the second building (except for the common foundation). Are they not starting the second building until the first building is complete?

Also, there are some updated renderings available on their website:
https://www.fairwaysriverview.ca/the-kensington-apartments

It looks a bit different than initially conceived, but still nice enough. Many of the units are three bedroom or two bedroom plus den. This remains a high quality development. The list of amenities is available on the website above.
Definitely different than anything around these parts. I really like it. Like the size of the apartments and what I like most, those dam big patios. I see they are catering to the seniors, but the rent on those must be close to $2200/$2800 mth. They don't price them on the web site, so I assume it's one of those "if you need to ask, then you can't afford it".
Reply With Quote
     
     
  #1557  
Old Posted Jun 7, 2021, 12:18 AM
BlackYear's Avatar
BlackYear BlackYear is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,276
The Tides

Reply With Quote
     
     
  #1558  
Old Posted Jun 10, 2021, 12:22 PM
lirette lirette is offline
Registered User
 
Join Date: Nov 2015
Posts: 1,064
There's a new "for lease" sign in front of 567 Coverdale toad indicating its under new management.

This place has had vacancies for as long as I can remember. It really needs some TLC but it's a good location and has a decent amount of parking.
Reply With Quote
     
     
  #1559  
Old Posted Jun 10, 2021, 2:33 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
Quote:
Originally Posted by lirette View Post
There's a new "for lease" sign in front of 567 Coverdale toad indicating its under new management.

This place has had vacancies for as long as I can remember. It really needs some TLC but it's a good location and has a decent amount of parking.
It was purchased April 15th for $1.475 million. Coverdale Square absolutely could use some TLC, but what it also needs is a re-branding. So many businesses have opened in this location only to die, and that creates a reputation.

One thing that could be improved is the entrance as it's very easy to miss. The sign is actually about 200 feet up the road! I really hope the new owners are successful with their plans.
Reply With Quote
     
     
  #1560  
Old Posted Jun 11, 2021, 1:14 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,930
Causeway replacement One of the best drone videos I've seen yet.

https://www.youtube.com/watch?v=QoX-K4eQDJc
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 1:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.