Quote:
Originally Posted by madog222
I assume the plan is still for it to be replaced with more bus bays on either side of the station.
|
On which side of Central Blvd.?
That rendering seems to indicate their plan is to create some sort of urban park underneath the Skytrain guideway (probably in keeping with the city's plan to develop that area of the BC Parkway greenway and the underside of the tracks along with it.)
The City's plan originally was for Beresford street to be converted into a sort of pedestrain Artwalk rather than have any sort of Transit traffic on it - with vehicular traffic limited only to local and residence cars.
(previous renders have seemed to imply that the bus bays would be relocated just south of the skytrain tracks.
I don't see how these two plans are in any way compatible).
In addition (......and I know these are only conceptual renders. So grain of salt and all....), the renders also seem to imply a plan to reduce Central Blvd. down to a two-lane street with the other lanes converted to street parking or a bikeway rather than Bus bays or a bus stops.
Again,.....also doesn't seem to make sense.
If the plan is to have the bus loop be a linear loop with the buses and bays linearly aligned along either side of Central - versus the compacted bays they currently have in one spot at the current location- then you're either going to need a hell of a lot more street to accommodate both the stops and the bays necessary, or Translink will have to reduce the number of bus routes that use that loop as a stop to minimize the need for bays or you end up with bays and stops running from Willlingdon or Wilson from the west all the way to Bonsor Park or Imperial in the east.
Also, what happens with all the regular vehicular traffic that currently uses Central Blvd. with the reduced lanes?
on most days Central Blvd. is almost just as busy as Kingsway with vehicle traffic.