  #13381  
Old Posted Nov 7, 2019, 6:37 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by kmcamp View Post
It's really just a vestibule about the same size as at street level, but could probably be connected in any direction
Thanks for that.

I do think that an additional set of elevators from street level to the concourse would be beneficial. It is the only downtown station with only one set, and the busiest station at that.
     
     
  #13382  
Old Posted Nov 8, 2019, 1:09 PM
AuxTown's Avatar
AuxTown AuxTown is online now
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,618
OK, I have been trying to be positive and give them the benefit of the doubt but it's starting to seem like our trains are pieces of shit! How the hell does this keep happening?!?

Quote:
Broken-down train causing delays on Confederation Line

Passengers will need to take replacement buses between Lyon and Rideau stations
CBC News · Posted: Nov 08, 2019 7:44 AM ET | Last Updated: 6 minutes ago

OC Transpo says the Confederation Line is currently experiencing delays because of a broken train between Rideau and Parliament stations.

The update was sent just after 7:30 a.m.

Replacement buses are being sent to take passengers between Lyon and Rideau stations.

There is currently no information about how long the disruption is expected to last.

This is the eighth time this month an O-Train line has had an issue during morning peak service.
     
     
  #13383  
Old Posted Nov 8, 2019, 2:01 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
Quote:
Originally Posted by AuxTown View Post
OK, I have been trying to be positive and give them the benefit of the doubt but it's starting to seem like our trains are pieces of shit! How the hell does this keep happening?!?
There are serious issues with the trains themselves and the systems that manage them. I keep hearing Train Control & Management System (TCMS) as one source of the issues; also switches and doors.

We got a lemon. It may get fixed, but for now, they need buses. People are literally livid and they will start losing transit riders.

This was an interesting interview from CBC's Robyn Bresnahan with Pat Scrimgeour of OC Transpo from yesterday. She asks tough questions, both tough on OC and tough to answer. Some are fair, some are not. Pat struggles through the interview-its a bit painful. I feel for OC Transpo, they are operators and the issues are with the product from what I can gather and that is somewhat out of their control. But they were responsible for the RFP and the acceptance and they do need to answer to that.

https://twitter.com/OttawaMorning/status/1192456400720535555
     
     
  #13384  
Old Posted Nov 8, 2019, 2:29 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Some of the blame regarding Lie 1 issues lie with OC Transpo. They accepted the delivery before it was fully ready. They accepted the Line with 13 trains when 15 was promised.

The blame for the bus issues, obviously, is 100% on OC Transpo. And for me at least, the bus issues are a much bigger problem.

With a new rail system, you can expect a few issues. Other than Vancouver, we see issues with every other system, even when it's only new rolling stock. But for 5 years, OC Transpo continually promised, with great certainty, that the buses would become much more reliable once they no longer need to travel downtown. That has not materialized. If anything, the bus system is worse than ever.

I think it's pretty rich of OC and the City to withhold money from RTG/RTM because we haven't received what we pay for, but refuse to consider a fare reduction or fare freeze because "in order to provide better service, we need more revenue, not less". Why hold money from the rail operators for a shitty rail service, but not "hold" money from a bus operator for a crappy bus service?
     
     
  #13385  
Old Posted Nov 8, 2019, 2:30 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
Quote:
Originally Posted by J.OT13 View Post
Some of the blame regarding Lie 1 issues lie with OC Transpo. They accepted the delivery before it was fully ready. They accepted the Line with 13 trains when 15 was promised.

The blame for the bus issues, obviously, is 100% on OC Transpo. And for me at least, the bus issues are a much bigger problem.

With a new rail system, you can expect a few issues. Other than Vancouver, we see issues with every other system, even when it's only new rolling stock. But for 5 years, OC Transpo continually promised, with great certainty, that the buses would become much more reliable once they no longer need to travel downtown. That has not materialized. If anything, the bus system is worse than ever.

I think it's pretty rich of OC and the City to withhold money from RTG/RTM because we haven't received what we pay for, but refuse to consider a fare reduction or fare freeze because "in order to provide better service, we need more revenue, not less". Why hold money from the rail operators for a shitty rail service, but not "hold" money from a bus operator for a crappy bus service?
good points...
     
     
  #13386  
Old Posted Nov 8, 2019, 2:45 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Quote:
Originally Posted by daud View Post
There are serious issues with the trains themselves and the systems that manage them. I keep hearing Train Control & Management System (TCMS) as one source of the issues; also switches and doors.

We got a lemon. It may get fixed, but for now, they need buses. People are literally livid and they will start losing transit riders.

This was an interesting interview from CBC's Robyn Bresnahan with Pat Scrimgeour of OC Transpo from yesterday. She asks tough questions, both tough on OC and tough to answer. Some are fair, some are not. Pat struggles through the interview-its a bit painful. I feel for OC Transpo, they are operators and the issues are with the product from what I can gather and that is somewhat out of their control. But they were responsible for the RFP and the acceptance and they do need to answer to that.

https://twitter.com/OttawaMorning/status/1192456400720535555
Holy shit that was a rough interview. The fact that Manconi is hiding from accountability by cancelling his appearance in that interview at the last minute is just galling. He deliberately sent that smarmy SOB so that he could deflect any pointed criticism and avoid public accountability. "I can't speak to that". "I don't really know much about the contract". Well then why the hell are you even talking to us if you can't speak to anything of relevance?

Last edited by passwordisnt123; Nov 8, 2019 at 3:47 PM.
     
     
  #13387  
Old Posted Nov 8, 2019, 3:07 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,678
Quote:
Originally Posted by J.OT13 View Post
Some of the blame regarding Lie 1 issues lie with OC Transpo. They accepted the delivery before it was fully ready. They accepted the Line with 13 trains when 15 was promised.

The blame for the bus issues, obviously, is 100% on OC Transpo. And for me at least, the bus issues are a much bigger problem.

With a new rail system, you can expect a few issues. Other than Vancouver, we see issues with every other system, even when it's only new rolling stock. But for 5 years, OC Transpo continually promised, with great certainty, that the buses would become much more reliable once they no longer need to travel downtown. That has not materialized. If anything, the bus system is worse than ever.

I think it's pretty rich of OC and the City to withhold money from RTG/RTM because we haven't received what we pay for, but refuse to consider a fare reduction or fare freeze because "in order to provide better service, we need more revenue, not less". Why hold money from the rail operators for a shitty rail service, but not "hold" money from a bus operator for a crappy bus service?
The analogy doesn't really work. The whole house of cards is coming down with the Ford cuts and we are in real trouble. We will have to raise taxes substantially because transit fares are probably already nearing their maximum. Maybe the disaster was predicted as they know we needed Phase 2 to actually make the system work. Otherwise it seems like we rushed into it and should have asked for more money from other layers of government.
     
     
  #13388  
Old Posted Nov 8, 2019, 3:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by YOWetal View Post
The analogy doesn't really work. The whole house of cards is coming down with the Ford cuts and we are in real trouble. We will have to raise taxes substantially because transit fares are probably already nearing their maximum. Maybe the disaster was predicted as they know we needed Phase 2 to actually make the system work. Otherwise it seems like we rushed into it and should have asked for more money from other layers of government.
If the issue is the Ford Government cuts (and I have no doubt it's a major factor), then scream it from the top of the Peace Tower. Add a line to the tax bill or a pamphlet attributing the rising fees to the Ford Government.

EDIT: I know it's not that simple. We have to try and maintain a cordial relationship with he Province, even with these cuts. We're looking for funding for the Civic, Stage 3 and other big projects. Don't poke the bear. But Ford is doing something very similar with the carbon tax stickers at gas stations to try and bring down the Federal Liberals. Very miss-leading stickers that don't say 90% will return to all Ontarians as part of a tax refund. Even after the Liberal win, Ford still won't back down.

The analogy still stands though. You can't withhold payments from an under preforming partner on one hand, and ask for more money from customers to fix your own under preforming system on the other. That's mixed messaging.

I don't necessarily expect them to freeze or cut fares, though I would like an explanation as to why we have the second highers fares in Canada. I would settle for OC Transpo taking responsibility for the failed bus network and not just divert blame solely to RTG/RTM. That and fixing the issues, not just in the suburbs (which aren't bad in my experience in Orleans) but in the entire city.

Last edited by J.OT13; Nov 8, 2019 at 3:46 PM.
     
     
  #13389  
Old Posted Nov 8, 2019, 3:45 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
I honestly think the city should just raise its revenue take from the tax base from 3% to 5% for this year. Property tax per capita relative to inflation fell 6% during Watson's first two terms. 3% is roughly neutral on that front (inflation being 2% and pop growth being 1%). So 5% now would really just be cancelling out part of that cut.

That extra 2%, worth roughly $35M, should be used to fund:
-$20M in service improvements, with an outside expert like Walker or Cassello in charge of figuring out the best way to spend it
-$5M annual contribution to a new reserve fund to accelerate purchases of electric buses--whenever OC needs to buy buses, they'd used this fund to pay for the cost difference between electric and diesel. This way the operating cost savings from electric buses can go to the operating budget instead of having to be used on pay back the extra purchase price. This will reduce the cost of running the bus system over time.
-$10M to freeze fares for 2 years.

Watson has so much political capital and his biggest opponents all want more spending. He can do this.
     
     
  #13390  
Old Posted Nov 8, 2019, 3:53 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,780
There was a similar uncomfortable interview with John Manconi last night on CTV News as the one on CBC Radio yesterday morning. The reporter actually asked if political pressure was applied to open the C-Line before it was ready. As one can imagine (one cannot throw your boss under the bus publicly), he deflected on the answer saying that the 12 day test proved that the trains were 'safe' to operate and that the test did not reveal the problems experienced since October 6th. I am not sure if that entirely true given that there were resets during the test and we could not operate 15 trains.

Also, from presentation released yesterday, it was revealed that we are paying RTM $4M to $5M per month to maintain the trains. That amounts to $50M to $60M per year. This is more than the expected savings from eliminating bus service out of downtown, which amounted to $40M to $50M also reported in the last few days. This has to be concern for the sustainability of public transit, when it appears that there are actually no savings to be had from the switch-over from buses to trains. The only savings can be achieved by cutting remaining bus service and we all now know that this occurred. For example, we now know that the 'frequent' bus network is actually a net reduction compared to previously and the implementation of the 'frequent' versus 'fast' routes was actually concealing that 'fast' routes were sometimes no longer frequent. It also explains the desperation of ending some downtown routes (example Route 10) forcing transfers for one or two stations on the C-Line. They were trying every way possible to save money on the remaining bus system. My own neighbourhood route was originally planned to run to Hurdman during all hours and then was cut to peak periods only.
     
     
  #13391  
Old Posted Nov 8, 2019, 4:42 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by lrt's friend View Post
There was a similar uncomfortable interview with John Manconi last night on CTV News as the one on CBC Radio yesterday morning. The reporter actually asked if political pressure was applied to open the C-Line before it was ready. As one can imagine (one cannot throw your boss under the bus publicly), he deflected on the answer saying that the 12 day test proved that the trains were 'safe' to operate and that the test did not reveal the problems experienced since October 6th. I am not sure if that entirely true given that there were resets during the test and we could not operate 15 trains.

Also, from presentation released yesterday, it was revealed that we are paying RTM $4M to $5M per month to maintain the trains. That amounts to $50M to $60M per year. This is more than the expected savings from eliminating bus service out of downtown, which amounted to $40M to $50M also reported in the last few days.
If Manconi were given free will, I think he could do a decent job. I feel like Kanellakos, Watson and Hubley are pressuring him to tow the line. I think the powers at the top stopped him from doing the CBC Ottawa Morning interview and forced Scrimgeour onto the battle field. Scrimgeour had no idea why Manconi backed-out. He was just told, by who knows who, to get his ass to CBC that morning. The City seems to have a problem with CBC as they do more investigative reporting, while CTV is more reactive.

As for the train maintenance numbers, we still haven't gotten any answers as to why the trains are kept coupled (labour? technical issues? a few different stories came up on the forum) and who (RTG or the City) made the decision. And more importantly, who pays for the extra power and maintenance? That must be a pretty big chunk of the maintenance costs.

Another interesting revelation Wednesday: the smell at Parliament Station is due to a punctured sewer line dating back to construction, so maybe 5 years ago? One of those rods, similar to the one that punctured SunLife's parking garage, I guess. So why did they maintain that condensation under the escalators was the cause? Why did they clean (or claim to clean) those escalator pits? How the hell did they not know, or why did they not tell us, about the pierced sewer line? If they knew about it, why wasn't it fixed at the time?
     
     
  #13392  
Old Posted Nov 8, 2019, 6:31 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,584
Woe-train: Ottawa's LRT troubles, by the numbers
Confederation Line service disruptions add up to 21.5 hours of headaches for commuters

Andrew Foote · CBC News
Posted: Nov 06, 2019 4:00 AM ET | Last Updated: November 6


In the seven and a half weeks since Ottawa's Confederation Line opened to the public, there's been nearly a full day's worth of service disruptions — that we know about.

The new light rail line has broken down 31 times in the last 53 days for a total of 21.5 hours out of service, according to OC Transpo alerts.

Add the Trillium Line to the mix, and there have been more than 24 hours and 15 minutes of disruptions since Oct. 6 alone.

Trains on Lines 1 and 2 were halted on 20 of the 31 days since parallel bus service ended and dozens of routes were retired, forcing commuters to transfer onto LRT to complete their rides downtown.

Frustration among riders has boiled over, prompting Mayor Jim Watson to promise $3.5 million to bring back buses that had been put out of service. OC Transpo managers will have more to say at a transit commission meeting today.

Here's a look at Ottawa's troubled transit system, by the numbers.


How often does the LRT break down?




Longest disruptions since Sept. 14




Most frequent trouble spots




Known causes of O-Train issues




Facts and figures are from OC Transpo, plus city sources whenever possible.

https://www.cbc.ca/news/canada/ottawa/ottawa-otrain-problem-issue-graph-numbers-1.5348331
     
     
  #13393  
Old Posted Nov 8, 2019, 7:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Hum... Listening to Wednesday's Transit Commission. Sound like Kanallakis, and by extension the City, IS blaming RTG/RTM for the shitty bus service. Well that's a slap in the face.

EDIT: Around 19:20 of the second part of the meeting, Manconi concedes that RTG cannot be blamed for all the issues as the bus problems are on OC. He must have received a stern talking to for that one.
     
     
  #13394  
Old Posted Nov 8, 2019, 7:17 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
As for the train maintenance numbers, we still haven't gotten any answers as to why the trains are kept coupled (labour? technical issues? a few different stories came up on the forum) and who (RTG or the City) made the decision. And more importantly, who pays for the extra power and maintenance? That must be a pretty big chunk of the maintenance costs.
In Calgary they found there were no net savings from running shorter trains, because then you need people to decouple and recouple trains.



Who pays? Payments:
Quote:
The City will make monthly service payments to Project Co for the provision of facilities and services as contracted. The payments are subject to various adjustments including dollar deductions for underperformance in accordance with the payment mechanism schedule (Schedule20), adjustments based on annual drivers hours in accordance with the operations matters schedule (Schedule39),gainshare or painshare adjustments based on energy utilities consumption under the energy matters schedule (Schedule 8) and to upwards adjustments as a consequence of compensation events.
So without the schedules, we don't know the full suite of interlocking incentives. The extra maintenance on vehicles would be born 100% by the Project Co, same with the coupling and decoupling costs as that would be maintenance/operations. Energy matters would be shared.



Really old numbers from Calgary that might be useful to let us know what the split between different spending components might be:
Quote:
Vehicle Maintenance costs: $13.9M (2006)
Station Maintenance costs: $2.8M (2006)
Right of Way Maintenance costs: $2.9M (2006)
Signals Maintenance costs: $2.4M (2006)
Average annual power costs: $4.8M (2006)
Annual LRV Operator wages: $6.0M (2006)
https://forum.skyscraperpage.com/showthread.php?t=140075&page=105
And the city only pays part of the marginal electricity cost. But as it is a P3, if you believe in efficient markets, the price the project co bid in included optimizing the cost with the built in, so the costs are already allocated, and the only electricity exposure for the city is the wholesale supply price change, unless the Project Co finds a way to replace a lot of other money they would have spent with extra electricity in an unexpected way.
     
     
  #13395  
Old Posted Nov 8, 2019, 8:01 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
It was my understanding that the City pays RTG per kilometer traveled, so if we run doubles on weekends when singles would suffice, we are paying double what we need during that time. In any case, even if we are not charged for running doubles vs singles, train cars will wear out faster which could be an issue once they are transferred to us in 30 years.

We can't compare ourselves to Calgary because we have different rolling-stock. We run coupled 48 meter trains while Calgary runs five 25 meter cars with the front and back cars having cabs and the middle cars being simple passenger cars. So when they reduce the number of cars, they need to 1. remove one of the cab cars and 2. move it out of the way, 3. remove a passenger car and 4. move it out of the way and 5. re-attach the cab car making the coupling/decoupling much more complicated. And by just keeping the train together, it's only an extra 25 meters passenger car. When we couple-decouple, it's just one step and we leave behind a 48 meter train with all it's sophisticated equipment. Much less wear and tear in running a full length C-Train vehicle than a full length O-Train vehicle.

Furthermore, I do believe the process in Ottawa was supposed to be automated. It just doesn't work, but can be done manually if need be, which is the case. Calgary is fully manual.

The City should not concern themselves with the cost of coupling/uncoupling. It was in the contract and it is up to RTG/RTM to pay their employees to do that if need be. Just like the 12 days of testing with 15 trains promised from the very beginning, the weekend decoupling written in the contract should be enforced.
     
     
  #13396  
Old Posted Nov 8, 2019, 8:13 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
^ Every car in Calgary has 2 cabs. You just dump one or two of the cars, you don't need to rejig the trains (over time you need to to spread the miles over the fleet, so over time you would). 15, 20 years ago it was pretty common to only have 2 car trains running on weekends.

And yeah, Calgary has manual yards.

The contract overview doesn't have any payment changes based on 1 car versus 2 cars. It is entirely possible on the weekend or other low demand periods that RTG/RTM is only paid to operate one car, but RTG/RTM has decided that even then it is not worth it to split the trains. Having a provision in the contract where RTG/RTM can just decide to make more money is not something that would ever be put in a contract.
     
     
  #13397  
Old Posted Nov 8, 2019, 8:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by MalcolmTucker View Post
^ Every car in Calgary has 2 cabs. You just dump one or two of the cars, you don't need to rejig the trains (over time you need to to spread the miles over the fleet, so over time you would). 15, 20 years ago it was pretty common to only have 2 car trains running on weekends.

And yeah, Calgary has manual yards.

The contract overview doesn't have any payment changes based on 1 car versus 2 cars. It is entirely possible on the weekend or other low demand periods that RTG/RTM is only paid to operate one car, but RTG/RTM has decided that even then it is not worth it to split the trains. Having a provision in the contract where RTG/RTM can just decide to make more money is not something that would ever be put in a contract.
So a 5 car C-Train has 10 cabs?
     
     
  #13398  
Old Posted Nov 8, 2019, 9:01 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by J.OT13 View Post
So a 5 car C-Train has 10 cabs?
Yeah, when a tunnel is eventually built which allows for 5 car trains, there will be 10 cabs. Just like Toronto's older T-1 trains, each car has 2 cabs.

If capacity constraints every justify it, I'm sure they'll commission a 125m consit for the line that can support 125m trains, and a 100m consit for the line that can support 100m trains, and new yards and maintenance facilities to handle them. It is unlikely though, as in that distant future, there will be two lines able to accommodate 25,000 ppdph, and one able to accommodate 12,000 ppdph, for a total peak cordone count into or out of the CBD of 124,000 people per hour, double Toronto's current capacity.

A mitigating solution from the original generation (U2s) to the more modern ones, was pushing the cabs out over the couplers, reclaiming space for passengers.

Last edited by MalcolmTucker; Nov 8, 2019 at 9:18 PM.
     
     
  #13399  
Old Posted Nov 8, 2019, 10:44 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
The City should not concern themselves with the cost of coupling/uncoupling. It was in the contract and it is up to RTG/RTM to pay their employees to do that if need be. Just like the 12 days of testing with 15 trains promised from the very beginning, the weekend decoupling written in the contract should be enforced.
So we can enjoy the same crush loaded trains on weekend as rush hour but with the added benefit that the singles usually stop at the unsheltered part of the platform? Thanks but not thanks.
     
     
  #13400  
Old Posted Nov 9, 2019, 5:20 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,584
LRT gremlins don't take weekends off, 'immobilized' train causes morning delays

Norman Provencher, Ottawa Citizen
Updated: November 9, 2019


Glitches don’t stop on the brand-new LRT just because it’s the weekend.

OC Transpo reported just before 6 a.m. that riders could expect “minor delays” because due to an unspecified problem with the morning launch.

Fifteen minutes later, the service helpfully that a “technical issue” was causing the delay.

At 6:25 a.m., the service posted that all trains in both directions would service the westbound platforms from Parliament to Rideau stations due to an “immobilized train” at Parliament.

As the morning wore on, Transpo warned riders they could experience delays of up to 10 minutes.

Service were resumed in both directions, with delays, by 8:38 a.m. The all-clear, with no delays came at 9:39 a.m.

In the midst of these problems, riders at the Hurdman station when the fire alarms went off at 7:21 a.m.

Train service, such as it was, was maintained and the all clear was given at 7:53 a.m.

https://ottawacitizen.com/news/local-new...-immobilized-train-causes-morning-delays
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:31 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.