For anyone based in Edmonton, is this article an accurate description of the capacity issues there? The price tag of over $2B for that level of capacity and little possibility for expansion seems really questionable. After having so many issues with the metro line, it seems Edmonton really needs to get this one right.
https://globalnews.ca/news/4095116/edmonton-valley-line-lrt-capacity/
"Further scrutiny of the design specifications by Global News has revealed that once the first phase of the line is built in 2020, there may not be a chance for the city to increase passenger capacity or train frequency along the busy corridor. The line will eventually run to Lewis Farms in west Edmonton.
The train cars along the Valley Line extension will be 42 metres long, with the capacity to hold about 275 passengers. Due to the length of the cars compared to the length of a city block along the line, the Valley Line LRT trains will be limited to two cars per train, according to a city spokesperson. Adding an additional car to the train would block vehicle traffic.
The city is currently designing the Valley Line trains to run on a five-minute frequency, and any increase in train frequency could affect vehicle traffic, the spokesperson indicated.
To put this into perspective,
this means the line will be able to transport a maximum of about 6,600 people over the course of an hour, based on a five-minute frequency.
By comparison, the current Capital Line is able to transport about 12,000 people – nearly twice as many people – per hour. This is because the 24-metre-long cars can accommodate about 200 people each, and the trains are able to carry up to five cars. Peak frequency on the Capital Line is also every five minutes.
Last week, a new city report revealed the cost of the Valley Line LRT jumped by about $440 million, from $1.8 billion to $2.24 billion. The increased price tag is due to design changes at a couple of key intersections, as well as a larger park-and-ride facility at Lewis Estates."