Latest pic of renovations.
The black curtains are hanging to keep the interior of the stadium as near as possible to room temperature.
I'd like to see that ugly scoreboard at the far end replaced with 10,000 Red seats.
Assuming a new Government is Elected in October, will this Roof project be Cancelled by a New government ?
Such as the Rhinocerous Party.
870 million smakaronies is a lot of money that could go elsewhere.
Remember this project is in Stages. They could finish the installation of the Roof technical ring which you can clearly see in this image and leave the Stadium Open air.
Which will be perfect for Baseball. And a Monster Truck show.
And an Outdoor Winter hockey game. And Taylor Swift.
I don't believe the Final roof is a done deal. There must be some Out clause in the contract, there usually is in every contract.
Open air is fine with me.